New Demerara River Bridge Project

Bracket Acceptance Form

Project New Demerara River Bridge Project


Subsystem Name Weather
Part Name Quality Manager
Acceptance Criteria Date

NO. Quality acceptance type Inspection Records Contractor Engineer

1 Bracket Design

2 Foundation treatment
3 Preloading of brackets and brackets

4 Plane Position and Perpendicularity


5 Specification model and elevation
6 Appearance Quality
7 Welding quality
8 Embedded parts location and size

9 Bracket preload
10 Connector qualified

Construction workers: Date

inspectors: Date

Engineer: Date
New Demerara River Bridge Project
Quality Acceptance Of Bridge Bearings

Project New Demerara River Bridge Project


Subsystem Name
Part Name
Acceptance Criteria

NO. Quality acceptance type Inspection Records

1 Support Certificate
2 Installation Location

3 Dimensions of bridge supports


4 The quality of the bridge support

5 The quality of the grout


6 Grout thickness

The height difference of the four corners of the bridge


7
support seat

8 Mixing ratio of mortar


9 Strength of Mortar

Construction workers:

inspectors:

Engineer:
ct

Weather
Quality Manager
Date

ection Records Contractor Engineer

Date

Date

Date
New Demerara River Bridge Project
Quality Acceptance Of Bridge Hanging Basket

Project New Demerara River Bridge Project


Subsystem Name
Part Name
Acceptance Criteria

NO. Quality acceptance type Inspection Records

1 Truss system

2 Anchor system

3 Suspension system

4 Bottom support system

5 Template system

6 Walking system

7 Security system

Construction workers:

inspectors:

Engineer:
ct
sket

Weather
Quality Manager
Date

ection Records Contractor Engineer

Date

Date

Date
New Demerara River Bridge Project
Quality Acceptance Of Bridge Tension

Project New Demerara River Bridge Project

Subsystem Name concrete design strength

Part Name Actual Strength of Concrete

Bridge tensioning method Age of concrete

Acceptance Criteria Elastic Modulus

Initial prestress Continuous tension Ultimate tension


Prestress Oil pressure Design
Model Length Jack number
number gauge number tension Elongation Elongation
Tension Tension Tension
value value

Construction workers:

inspectors:

Engineer:
Weather

Quality Manager

Date

Ultimate tension
Theoretical Actual Slippery wire,
Deviation
Elongation elongation elongation Broken wire
value

Date

Date

Date
New Demerara River Bridge Project

BLINDING INSPECTION CHECKLIST

Project New Demerara River Bridge Project

Location

SPECIAL INSTRUCTION

CHECKLIST CONTRACTOR

Verify Surveyor’s Center Line

Verify Elevation of Blinding

Thickness of Blinding as per drawings

Verify dimensions of area for Blinding Concrete

Area free from water, slush, mud etc.

CONCRETE MIX DESIGN: QUANTITY:

PLACEMENT STARTED DATE:

PLACEMENT COMPLETED DATE:

COMMENTS: Contractor

NAME:

SIGNATURE:

DATE:
Bridge Project

N CHECKLIST

Weather

Date

NTRACTOR ENGINEER

WEATHER
CONDITIONS:
TIME:

TIME:

ontractor Engineer

NAME:

SIGNATURE:

DATE:
CONCRETE POUR CARD
Description: Location: Weather
Sub system: Item No: Date
Planning Information
Originator: Pour Number:
Elevation: Concrete Temperature:
Slumps: Quantity: Cu: Yd3
Pour
Placement Started : Date : Time :
Placement Completed: Date : Time :
Concrete Temperature Mechanical :

Standard Curing Test Number of


Serial number
Block groups

Same condition curing Number of


Serial number
test block groups

Contractor Date

Engineer Date

Owner Date
CONCRETE PLACEMENT LOG

Description: Location: Weather

Sub system: Item No: Date

Location of Pour Quality


Date Placed Pour Number 7 Days Results 14 Days Results 21 Days Results 28 Days ResultsOther Results Engineer
Repressented Responsible
New Demerara River Bridge Project
Formwork installation and removal

Project New Demerara River Bridge Project


Subsystem Name Weather
Part Name Quality Manager
Acceptance Criteria Date

NO. Quality acceptance type Inspection Records Contractor Engineer

1 No debris and standing water


2 Is the formwork coated with release agent?
3 Template size qualified
4 Template material quality
5 Formwork installation quality
6 Whether the template is damaged
7 The seams of the formwork are tight
8 Reserved hole position
9 Formwork flatness and pre-camber
10 Mixed soil strength at formwork removal

Construction workers: Date

inspectors: Date

Engineer: Date
New Demerara River Bridge Project

Foundation Pit Backfill Quality Acceptance

Project New Demerara River Bridge Project

Location

Part Name

Required
OPERATION
YES

1 Excavated area to be free of debris and water logging

2 Does it meet the drawing requirements?

3 Make sure the bottom is compact before filling

4 Whether the filling material meets the requirements

5 Whether the reply conforms to the standard specification

6 Whether to conduct stress test

7 Is the height of the response correct?


REMARKS:
Surveyed Elevation

Compaction Report

Thickness of Lift
Contractor :

Engineer :
Bridge Project

uality Acceptance

Weather

Date

Required
Contractor Engineer
NO N/A

RKS:

Date:

Date:
New Demerara River Bridge Project

Measurement Form

Project New Demerara River Bridge Project

Location Weather

EQUIPMENT & Serial NO Date

DESIGN:

STATION USED: _________________ E: _______________________ N: ______________________ ELEV: _________________

REQUIRED TOLERANCE: ________________________________________________________________________________________________________________

ACTUAL:

STATION USED: _________________ E: _______________________ N: ______________________ ELEV: _________________

REQUIRED TOLERANCE: ________________________________________________________________________________________________________________

COMMENTS:

SURVEYOR SURVEYOR CO-ORDINATOR REVIEW BY

NAME: NAME: NAME:

SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: DATE:


New Demerara River Bridge Project
Concrete pouring record sheet for bored piles

Project New Demerara River Bridge Project

Pile No.

DWG# Pile Location

Weather

Concrete/Grout Additives
Ticket No. Batch Time Arrival Time Load (m3)
Supplier: Truck No. (Litres)
dge Project
for bored piles

Date Installed

Rig

Operator

Concrete/Grout Sampling/Testing
Water Added On
Site (Litres) Spread (mm) Temp. (Deg.) Sample Set#
New Demerara River Bridge Project
AUGER CAST-IN-PLACE PILE INSTALLATION RECORD

Project New Demerara River Bridge Project


Pile No. Date Installed
DWG# Pile Location Rig
Weather Operator
Reinforcement cage experiment

ALL SPACERS REBAR


CAGE & REBAR CAGE
REINFORCEMENT CAGE QC CHECKS IN PLACE& CAGE CONTRACTOR ENGINEER
DESCRIPTION SIZE CHECK. CENTRALIZERS
SECURE INSPECTED

PILE DATA DRILLING SUMMARY

TIP AUGER TIME


GROUND PILE TOP PILE THEORETICAL ACTUAL PILE
AUGER DIA. (mm) ELEVATIO LENGTH (m)
ELEVATION. (m) ELEVATION (m) VOL. (m3) VOL. (m3)
N (m) START FINISH
New Demerara River Bridge Project
Prestressed Material Installation Inspection

Project New Demerara River Bridge Project


Subsystem Name Weather
Part Name Quality Manager
Acceptance Criteria Date

NO. Quality acceptance type Inspection Records Contractor Engineer

1 Acceptance of prestressed materials

2 Prestressed appearance quality

3 Prestressed specifications and models

4 Installation position and size

5 The location of reserved holes

6 Bridge Anchors, Clamps, Connectors

7 Number of prestress

Construction workers: Date

inspectors: Date

Engineer: Date
New Demerara River Bridge Project
Quality Acceptance Form For Grouting Of Bridge Prestressed Holes

Project New Demerara River Bridge Project

Subsystem Name Weather

Part Name Quality Manager

Acceptance Criteria Date

Grouting times() Quality of grouting material Inspection


Hole
NO. before
number
Starting time End Time Slurry direction Inlet pressure Constant pressure Duration Power level Mix ratio Fluidity Test block retention grouting

Construction workers: Date

inspectors: Date

Engineer: Date
New Demerara River Bridge Project
Road Grassroots Quality Inspection

Project New Demerara River Bridge Project


Subsystem Name Weather
Part Name Quality Manager
Acceptance Criteria Date

NO. Quality acceptance type Inspection Records Contractor Engineer

1 Type and quality of filler

2 Deflection value

3 Apparent quality

4 Center line deviation

5 Profile Elevation

6 Flatness

7 Width and slope

8 Packing thickness

Construction workers: Date

inspectors: Date

Engineer: Date
New Demerara River Bridge Project
Subgrade filling test acceptance

Project New Demerara River Bridge Project


Subsystem Name Weather
Part Name Quality Manager
Acceptance Criteria Date

NO. Quality acceptance type Inspection Records Contractor Engineer

1 Type and quality of filler

2 Moisture content of filler

3 The thickness of each layer of paving

4 Number of times and degree of compaction

5 Is it soaked in water

6 The maximum dry density of the filler

7 The maximum dry density of the filler

8 Deflection value

9 Subgrade Centerline Deviation

10 Road bed elevation

Construction workers: Date

inspectors: Date

Engineer: Date
New Demerara River Bridge Project
Road surface acceptance

Project New Demerara River Bridge Project


Subsystem Name Weather
Part Name Quality Manager
Acceptance Criteria Date

NO. Quality acceptance type Inspection Records Contractor Engineer

1 Type and quality of materials used for the skin

2 surface compaction

3 Surface layer thickness

4 Surface quality

5 High level

6 Flatness

7 Width and slope

8 Surface layer thickness

Construction workers: Date

inspectors: Date

Engineer: Date
New Demerara River Bridge Project
Reinforcement Connection And Installation Quality Acceptance

Project New Demerara River Bridge Project


Subsystem Name Weather
Part Name Quality Manager
Acceptance Criteria Date

NO. Quality acceptance type Inspection Records Contractor Engineer

1 The appearance quality of the reinforcement


2 Lnspection report number of steel bars
3 The model specification of the steel bar
4 The number and size of steel bars
5 Connection Method
6 Protective Layer Thickness
7 Rebar Spacing
8 Bar Length
9 Number of Pads
10 Location of reinforcement

Construction workers: Date

inspectors: Date

Engineer: Date