Dear Sir,
The Contractor hereby makes reference to the Engineer`s instruction No.100 on 02nd
August 2023, cited (1) hereinabove.
After a preliminary review of the said document, the contractor hereby states that the
implementation of the additional works instructed through the Engineer`s Instruction
No.100 with the approved Programmme/related Key Dates and will require the increase
of the Contract Price.
The Contractor is currently analyzing the impact that this event might generate upon the
Programme/related Key Dates and Time for Completion. Full particulars of any
additional payment claimed as a result thereof, including the value of the works to be
executed and any disruption and/or prolongation costs, will be assessed and submitted
shortly.
Therefore, this letter is grounded on and issued under the provisions of Sub-clause
2.1[Instructions of the Engineer], Sub-clause 14 [Programmme], Sub-Clause 14.4 [Key
Dates Schedule] Sub clause 44 [Extension of Time for completion], Clause 51
[Variations] Clause 52 [Valuation of Variation] and sub clause 53.1 [Notice of Claims] of
the Contract.
Yours Faithfully,
For and on behalf of Contractor
Jijo George
Project Manager
1|Page
2020082/NSD/CON/GJ/306
Dear Sir,
Please find enclosed Engineer’s instruction No.100 regarding SS Face Plate for Corridor Wash Basins in
the above project.
Best regards,
SURESH CHANDRAN
Sr. Resident Engineer
Encl: As above
Cc:
IDC : Mr. JC Bejjani / Mr. Sreejith A.Nair / Mr. Srinivasarao Lolugu / Mr. Jardee De La Rosa
DGJ : Mr. Fraser S Halliday / Mr. Kevin J Penhale / Ms. Shereen A. Zeinoun /
Mr. Shan M. Gamage
AGG : Mr. Mohamed Al Ghanah / Mr. Thomas Mathai
MSCEB : SK / XR / RKM / GJ / DBR / GC / SAI / RM / ZB / TMK
ENGINEER'S INSTRUCTION
Project Code. : 2020082 Contract Title : Nadeen School Dilmunia (Main works)
Contract Date : 17-04-2022 EI Issue Date : 02nd August 2023
Contractor : Al Ghanah Group W.L.L
Contract Sum : BD 7,300,000/- Reason for Change : Client’s requirements
You are instructed to proceed with the changes to the work described below. Unless otherwise stated all materials
and workmanship are to be in accordance with the requirements of the contract. The cost of the work described in
the Engineer’s Instruction shall be determined by the requirements and Conditions of the Contract.
THIS ENGINEER’S INSTRUCTION IS NOT VALID UNLESS SIGNED IN THE SPACE PROVIDED BY AUTHORISED
REPRESENTATIVES OF THE ENGINEER
INSTRUCTION
As per Clients’s requirements, you are advised to submit the quotation for supply & installation of 2 no’s S/S perforated
cover plate (removable type) - 2 no's, grade 316 minimum, size as per site measurements.
SIGNATURES
Date: Date:
MSCEB, Mr. Suresh Chandran Sr. Resident Engineer AGG, Project Manager
Copies:
IDC : Mr. J.C.Bejjani / Mr. Sreejith A Nair / Mr. Srinivasa Rao Lolugu
DGJ : Mr. Fraser S Halliday / Mr. Kevin J Penhale / Mr.Shan M.Gamage
AGC : Mr. Mohamed Al Ghanah / Mr. Thomas Mathai
MSCEB : SK / RKM /GJ / DBR / GC / TMK / ZB / SAI / RM