PRELIMINARIES BILL NO. 1


Hoorat A'Ali & Diraz

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)

PRELIMINARIES
Preliminaries costs should be inclusive of 5% VAT
Insurances
A Contractor's All Risk Insurance Policy: value equal to Contract Sum
+ 10% of the Contract Sum to cover Professional and Legal Fee. Item 1 -
Policy to be valid until end of Defects Liability (DL) period.

B Third Party Insurance: BD 500,000/-. Policy to be valid until end of Item 1 -


Defects Liability period. -

C Professional Indemnity Insurance BD 500,000/- Item 1 -

D Performance Bond
Performance Bond: 10% of the Contract Sum. Performance Bond Item 1 -
to be valid until end of Defects Liability period.

E Government Levy, Tax, Custom Duties, Royalties Item 1 -


Allow in all pricing for payment of all Government Levy, Tax, Custom
Duties, payment for Government Royalties (if any) -

F Health & Safety Item 1 -


The contractor shall take measures as may be necessary to ensure Health
& Safety of persons on the site.

G Delivery, Handling & Storage of Materials Item 1 -


Handle and store materials in accordance with manufacturer’s instructions
to prevent damage to materials, structure and finishes.
-
Deliver packaged materials in original, unopened and undamaged
containers with manufacturer’s labels and seals intact.

H Water (for Construction & DL Periods) Item 1 -


It shall be the Contractor’s responsibility to provide Water and pay -
all charges in connection therewith during Construction and DL
periods which also includes temporary connection charges.

To Collection Page BHD -


Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
PRELIMINARIES BILL NO. 1
Hoorat A'Ali & Diraz

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


PRELIMINARIES (CONT'D.)
A Electricity and Power (for Construction & DL Periods) Item 1 -
It shall be the Contractor’s responsibility to provide Electricity and
Power supply and pay all charges in connection therewith during
Construction and DL periods which also includes temporary
connection charges.
B Telephone and IT Services Item 1 -
The Contractor shall be responsible to pay the cost of all Telephone
and IT Services during Design, Construction and DL periods.
Site Supervision
C Contractors Site Supervision during Construction Period. Item 1 -

D Contractors Site Supervision during Defect Liability Period. Item 1 -

E Samples Item 1 -
The Contractor shall furnish for approval, with reasonable

promptness all samples as directed by the Engineer. The Engineershall


check and approve such samples with reasonable promptness for
compliance with the information given in the Contract Documents. The
work shall be strictly in accordance with approved samples.

F Site Tidiness & Reinstatement Item 1 -


The site must be kept clean, tidy and in an orderly condition at all
times. The Contractor on vacating the Site shall be responsible for
the clearance of all Contractor’s plant, temporary works, surplus
materials and debris and reinstate the Site to the satisfaction of the
Engineer.

G Contractor's Site Facilities at HOORAT A'ALI Item 1 -


Contractor to build and maintain site facilities for their own staff and
a Meeting Room, with 10 member meeting table, chairs and
covered car park with five parking spaces for Employer's use.

H Contractor's Site Facilities at DIRAZ Item 1 -


Contractor to build and maintain site facilities for their own staff and
covered car park with five parking spaces for Employer's use.
-

To Collection Page BHD -


Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
PRELIMINARIES BILL NO. 1
Hoorat A'Ali & Diraz

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


PRELIMINARIES (CONT'D.)

Additional Items
The Tenderer shall insert below any additional item/s not covered
by these Preliminaries or elsewhere in the document for which the
Contractor requires payment.

A Item 1 -

B Item 1 -

C Item 1 -

D Item 1 -

E Item 1 -

F Item 1 -

G Item 1 -

H Item 1 -

I Item 1 -

J Item 1 -

K Item 1 -

To Collection Page BHD -


Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
PRELIMINARIES BILL NO. 1
Hoorat A'Ali & Diraz

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


PRELIMINARIES (CONT'D.)

COLLECTION PAGE

Page B1/1 -

Page B1/2 -

Page B1/3 -

SUB-TOTAL

ADD: 5% Value Added Tax (VAT) -

TO GRAND SUMMARY -
Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
Design Costs BILL NO. 2
Hoorat A'Ali & Diraz

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


Cost Associates with Design Services
Design & Builder to submit a detailed list of items and Costs
associates with items in respect of full Design Services required in
DIRAZ Hydroponic Farm.
-
All Prices should be inclusive of 5% VAT

Complete Design Services for Hydroponic Farm, which included Green


Houses, Permanent Buildings, other facilities including all infrastructure
facilities as described in the tender documents.

Tender to provide detailed breakdown of Costs associates with


Design related Services below

A Compile required Drawings, Specifications, related documents and item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval prior to start construction
works (construction works measured elsewhere in the tender
documents) in respect of Administration Building.

B Compile required Drawings, Specifications, related documents and item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval prior to start construction
works (construction works measured elsewhere in the tender
documents) in respect of Electrical and Guard Room Buildings.

C Compile required Drawings, Specifications, related documents and item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval prior to start construction
works (construction works measured elsewhere in the tender
documents) in respect of RO Plant and Services Buildings.

D Compile required Drawings, Specifications, related documents and item 1 -


obtain Engineer's approval to the Design and Specifications. Design & -
Builder to obtain Building Permit approval prior to start construction
works (construction works measured elsewhere in the tender
documents) in respect of Compositing Area.
-
E Compile required Drawings, Specifications, related documents and item 1 -
obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval prior to start construction
works (construction works measured elsewhere in the tender -
documents) in respect of External Works.

To Collection Page BHD -


Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
Design Costs BILL NO. 2
Hoorat A'Ali & Diraz

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


Cost Associates with Design Services
Design & Builder to submit a detailed list of items and Costs
associates with items in respect of full Design Services required in
DIRAZ Hydroponic Farm.
-
All Prices should be inclusive of 5% VAT

A Compile required Drawings, Specifications, related documents and item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 1.

B Compile required Drawings, Specifications, related documents and item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 2.

C Compile required Drawings, Specifications, related documents and item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 3.

D Compile required Drawings, Specifications, related documents and item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 4.

E Compile required Drawings, Specifications, related documents and item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 5.

F Compile required Drawings, Specifications, related documents and item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 6.

To Collection Page BHD -


Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
Design Costs BILL NO. 2
Hoorat A'Ali & Diraz

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


Cost Associates with Design Services
Design & Builder to submit a detailed list of items and Costs
associates with items in respect of full Design Services required in
DIRAZ Hydroponic Farm.
-
All Prices should be inclusive of 5% VAT

Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 7.

Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 8.

Additional Items

The Tenderer shall insert below any additional item/s not covered by the
above BoQs or elsewhere in the document for which the Contractor
requires payment.

C Item 1 -

D Item 1 -

E Item 1 -

F Item 1 -

G Item 1 -

To Collection Page BHD -


Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
Design Costs BILL NO. 2
Hoorat A'Ali & Diraz

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


Cost Associates with Design Services (Cont'd)
Design & Builder to submit a detailed list of items and Costs
associates with items in respect of full Design Services required in
DIRAZ Hydroponic Farm.
-
All Prices should be inclusive of 5% VAT

Additional Items (Cont'd)

The Tenderer shall insert below any additional item/s not covered by the
above BoQs or elsewhere in the document for which the Contractor
requires payment.

A Item 1 -

B Item 1 -

C Item 1 -

D Item 1 -

E Item 1 -

F Item 1 -

G Item 1 -

H Item 1 -

J Item 1 -

To Collection Page BHD -


Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
Design Costs BILL NO. 2
Hoorat A'Ali & Diraz

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


Cost Associates with Design Services
Design & Builder to submit a detailed list of items and Costs
associates with items in respect of full Design Services required in
HOORAT A'ALI Hydroponic Farm.
-
All Prices should be inclusive of 5% VAT

Complete Design Services for Hydroponic Farm, which included Green


Houses, Permanent Buildings, other facilities including all infrastructure
facilities as described in the tender documents.

Tender to provide detailed breakdown of Costs associates with


Design related Services below

A Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval prior to start construction
works (construction works measured elsewhere in the tender
documents) in respect of Administration Building.

B Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval prior to start construction
works (construction works measured elsewhere in the tender
documents) in respect of Electrical and Guard Room Buildings.

C Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval prior to start construction
works (construction works measured elsewhere in the tender
documents) in respect of RO Plant and Services Buildings.

D Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval prior to start construction
works (construction works measured elsewhere in the tender
documents) in respect of Compositing Area.

E Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval prior to start construction
works (construction works measured elsewhere in the tender
documents) in respect of External Works.

To Collection Page BHD -


Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
Design Costs BILL NO. 2
Hoorat A'Ali & Diraz

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


Cost Associates with Design Services (Cont'd)
Design & Builder to submit a detailed list of items and Costs
associates with items in respect of full Design Services required in
HOORAT A'ALI Hydroponic Farm.

All Prices should be inclusive of 5% VAT

A Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 1.

B Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 2.

C Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 3.

D Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 4.

E Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 5.

F Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 6

To Collection Page BHD -


Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
Design Costs BILL NO. 2
Hoorat A'Ali & Diraz

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


Cost Associates with Design Services (Cont'd)
Design & Builder to submit a detailed list of items and Costs
associates with items in respect of full Design Services required in
HOORAT A'ALI Hydroponic Farm.

All Prices should be inclusive of 5% VAT

A Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 7.

B Compile required Drawings, Specifications, related documents and Item 1 -


obtain Engineer's approval to the Design and Specifications. Design &
Builder to obtain Building Permit approval (if required) prior to start
construction works (construction works measured elsewhere in the
tender documents) in respect of Greenhouse - 8.

Additional Items

The Tenderer shall insert below any additional item/s not covered by the
above BoQs or elsewhere in the document for which the Contractor

A Item 1 -

B Item 1 -

C Item 1 -

D Item 1 -

E Item 1 -

F Item 1 -

G Item 1 -

To Collection Page BHD -


Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
Design Costs BILL NO. 2
Hoorat A'Ali & Diraz

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


Cost Associates with Design Services (Cont'd)
Design & Builder to submit a detailed list of items and Costs
associates with items in respect of full Design Services required in
HOORAT A'ALI Hydroponic Farm.

All Prices should be inclusive of 5% VAT

Additional Items (Cont'd)

The Tenderer shall insert below any additional item/s not covered by the
above BoQs or elsewhere in the document for which the Contractor
A Item 1 -

B Item 1 -

C Item 1 -

D Item 1 -

E Item 1 -

F Item 1 -

G Item 1 -

H Item 1 -

J Item 1 -

To Collection Page BHD -


Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
Design Costs BILL NO. 2
Hoorat A'Ali & Diraz

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


COLLECTION PAGE

Page B2/1 -

Page B2/2 -

Page B2/3 -

Page B2/4 -

Page B2/5 -

Page B2/6 -

Page B2/7 -

Page B2/8 -

To Collection Page BHD -


DIRAZ
Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
HYDROPONIC BILL NO. 3
Hoorat A'Ali & Diraz
FARM

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


ADMINISTRATION BLOCK BUILDING

Substructure

A Excavate to receive foundation. m2 138 0.000 -

B Filling and compaction. m2 138 -

C Concrete works; including formworks and necessary m2 138 -


reinforcements; to foundation.

Sundries

D Damp-proofing course as per specifications. m2 138 -

Superstructure

E Concrete works; including formworks and reinforcements; to m2 138 -


slabs, columns, beams, steps, etc.

Thermal and Moisture Protection

F Waterproofing; to roof slab. m2 138 -

Masonry Works (refer to specifications)


G 200 mm thick concrete blockwork (external wall). m2 220 -

H 150 mm thick concrete blockwork; to internal walls wet area. m2 102 -

J 100 mm thick concrete blockwork (internal walls). m2 56 -

To Collection Page BHD -


DIRAZ
Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
HYDROPONIC BILL NO. 3
Hoorat A'Ali & Diraz
FARM

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


ADMINISTRATION BLOCK BUILDING (CONT'D.)

Doors and Windows (Cont'd.)

Door including ironmongery (refer to specifications)

A Single leaf; semi solid core door; flush faced finished in no. 3 -
hardwood veneer; to offices.

B Single leaf; aluminum sandwich panel door; to pantry, toilets and no. 8 -
stores.

C Double Leaf; aluminum sandwich panel door with half of the no. 1 -
height with double glazed glass panel; to main entrance.

D Single Leaf; aluminum sandwich panel door with half of the no. 2 -
height with double glazed glass panel; to workers room.

Window including hardware and accessories

E Aluminum sliding double glazed window with fly screen. Item 1 -

F Top hang window; to toilets. no. 4 -


Finishes (refer to specifications)

To Floor

G Cement and sand screed. m2 104 -

H Full body porcelain tile. m2 60 -

I Terrazzo tile; to worker room. m2 31 -

J Ceramic tile; to wet area. m2 28 -

To Collection Page BHD -


DIRAZ
Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
HYDROPONIC BILL NO. 3
Hoorat A'Ali & Diraz
FARM

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


ADMINISTRATION BLOCK BUILDING (CONT'D.)

Finishes (refer to specifications) (Cont'd.)

To wall

20 mm thick cement and sand plaster m2 654 -

Painting; to external walls m2 220 -

Painting; to internal walls m2 434 -

Ceramic tile; to worker room; 1.50 m high m2 42 -

Ceramic tile; to wet area m2 178 -

To Ceiling

20 mm thick cement and sand plaster m2 123 -

Painting m2 123 -

Skirting

10 cm high m 107 -

To Collection Page BHD -


DIRAZ
Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
HYDROPONIC BILL NO. 3
Hoorat A'Ali & Diraz
FARM

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


ADMINISTRATION BLOCK BUILDING (CONT'D.)

Mechanical Installation (refer to specifications)

Potable Water Installation

A PPR pipes including fittings and connection complete (for hot and item 1 -
cold water supply)

Waste Water Installation

B Pipes, fittings and connection complete item 1 -

Rain Water Installation

C Pipes, fittings and connection complete (for rain water outlet- item 1 -
free discharge)

Air Conditioning and Ventilation Installation

AC & Exhaust Fan as approved complete with all components


and accessories; electrical & connection.

D Airconditioning unit; split type; wall mounted; to offices and no. 4 -


worker room. Provisional Quantity: To be Re-measured

E Airconditioning unit; split type; wall mounted; to corridors no. 1 -

F Exhaust fan; wall mounted to wet areas and store no. 6 -

To Collection Page BHD -


DIRAZ
Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
HYDROPONIC BILL NO. 3
Hoorat A'Ali & Diraz
FARM

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


ADMINISTRATION BLOCK BUILDING (CONT'D.)

Mechanical Installation (refer to specifications)

Sanitary Installation Water Closet

A Water Closet no. 4 -

B Wash Basin no. 6 -

C Wash Basin Mixer no. 6 -

D Allow for Spray no. 4 -

E Allow for Tissue Holder no. 4 -

F Allow for Soap Dispenser no. 6 -

G Kitchen Sink no. 1 -

H Kitchen Mixer no. 1 -

I Allow for Mirror m2 4 -

J Allow for Water heater unit no. 2 -

Fire Fighting System (As per Civil Defense Requirements)

K Fire extinguishers; as per civil defense requirements item 1 -

L Allow for fire detection and alarm system item 1 -

To Collection Page BHD -


DIRAZ
Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
HYDROPONIC BILL NO. 3
Hoorat A'Ali & Diraz
FARM

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


ADMINISTRATION BLOCK BUILDING (CONT'D.)

Electrical Installation (refer to specifications)

Power System

A Allow for Panel Board including circuit breakers, fuses, no. 1 -


connection, accessories, support, etc.

Small Power Installation (Provisional Quantity: To be remeasured)

Supply, install, fix, connect all wiring (Final sub-circuits) back to


panel board; including terminations, conduits, containment,
boxes, etc.

B 13 Amp. double socket outlet point no. 19 -

C External waterproof power socket outlet point no. 2 -

D Allow for water heater point no. 2 -

Supply, install and connect devices/ accessories

E 13 Amp. double socket outlet no. 19 -

F External waterproof power socket outlet no. 2 -

G Allow for Water heater switch no. 2 -

To Collection Page BHD -


DIRAZ
Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
HYDROPONIC BILL NO. 3
Hoorat A'Ali & Diraz
FARM

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


ADMINISTRATION BLOCK BUILDING (CONT'D.)

Electrical Installation (refer to specifications) Cont'd.

Lighting Installation (Provisional Quantity : To be remeasured)

Supply, install, fix, connect all wiring (Final sub-circuits) back to


panel board; including terminations, conduits, containment,
boxes, etc. (Provisional Quantity: to be remeasured)

A Lighting point no. 33 -

B Switch point no. 13 -

Light switch including plate complete as described; samples as


approved by the Engineer (Provisional Quantity to be remeasured).

C 1 way, 1 gang switch no. 3 -

D 1 way, 2 gang switch no. 8 -

E 1 way, 3 gang switch no. 2 -

Light fittings including all assembly, connection, fixing and


accessories complete as described; samples as approved by the
Engineer.

F LED ceiling mounted panel light; 600 x 600 mm (Provisional no. 27 -


Quantity: To be remeasured)

G Allow for Downlight; ceiling mounted (Provisional Quantity: to no. 6 -


be remeasured)

To Collection Page BHD -


DIRAZ
Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
HYDROPONIC BILL NO. 3
Hoorat A'Ali & Diraz
FARM

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


ADMINISTRATION BLOCK BUILDING (CONT'D.)

Electrical Installation (refer to specifications) (Cont'd.)

Telephone and Data (Provisional Quantity: To be remeasured)

A Wiring in approved cables and necessary conduits, containment no 4


complete; to office (Provisional Quantity : To be remeasured)

B Supply, install and connect devices/ accessories; to office no 4


(Provisional Quantity to be remeasured)

To Collection Page BHD -


DIRAZ
Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
HYDROPONIC BILL NO. 3
Hoorat A'Ali & Diraz
FARM

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


ADMINISTRATION BLOCK BUILDING (CONT'D.)

Additional Items (Cont'd.)

Any items that may not be covered elsewhere in the Bills of


Quantities which the tenderer deemed to be necessary in order
to carry-out the works, must be itemised and priced below.

To Collection Page BHD -


DIRAZ
Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
HYDROPONIC BILL NO. 3
Hoorat A'Ali & Diraz
FARM

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


ADMINISTRATION BLOCK BUILDING (CONT'D.)

Additional Items (Cont'd.)

Any items that may not be covered elsewhere in the Bills of


Quantities which the tenderer deemed to be necessary in order
to carry-out the works, must be itemised and priced below.

To Collection Page BHD -


DIRAZ
Food Sustainability ProjectDesign, Build & Handover Hydroponic Farms at
HYDROPONIC BILL NO. 3
Hoorat A'Ali & Diraz
FARM

REF DESCRIPTION UNIT QTY RATE (BD) AMOUNT(BD)


ADMINISTRATION BLOCK BUILDING (CONT'D.)

Collection Page

Page 1 of 133 -

Page 2 of 133 -

Page 3 of 133 -

Page 4 of 133 -

Page 5 of 133 -

Page 6 of 133 -

Page 7 of 133 -

Page 8 of 133 -

Page 9 of 133 -

Page 10 of 133 -

To Collection Page BHD -

You might also like