Professional Documents
Culture Documents
1 (16)
Prepared (Subject resp) No.
© Ericsson 2019
All rights reserved. The information in this document is the property of Ericsson. Except as
specifically authorized in writing by Ericsson, the receiver of this document shall keep the
information contained herein confidential and shall protect the same in whole or in part from
disclosure and dissemination to third parties. Disclosure and disseminations to the receiver's
employees shall only be made on a strict need to know basis. The information in this document
is subject to change without notice and Ericsson assumes no responsibility for factual
inaccuracies or typographical errors.
Ericsson Internal
2 (16)
Prepared (Subject resp) No.
1 Contents
1 Contents ............................................................................................ 2
2 Revisions ........................................................................................... 2
3 Introduction ....................................................................................... 3
4 Requirements .................................................................................... 3
5 DUL20: Backup CV to be transferred on the new BB5216 (On Site) .. 3
5.1 Connecting Clients ............................................................................ 4
5.2 Create a CV to backup ...................................................................... 5
5.2.1 DUL20 FTP Security mode OFF (On Site) ......................................... 6
5.2.2 DUL20 Backup CV ............................................................................ 8
6 Physically change the DUL20 for the BB 5216 (On Site) ................... 9
6.1.1 DUL20 in RBS 6101 with RRUs and optical fibers ............................. 9
6.1.2 DUL20 in RBS 6101 with RRUs and optical fibers ........................... 11
6.1.3 DUL20 in RBS 6601 inside Tx cabinet. ............................................ 14
7 BB5216: Verify Basic Package (On Site) ......................................... 15
8 BB5216: SW Upgrade (On Site) ...................................................... 15
9 BB5216: Restore CV (On Site) ........................................................ 15
10 BB5216 Final Restart ...................................................................... 15
11 BB5216: License Installation (Remote) ............................................ 16
12 BB5216: Final Verifications (Remote) .............................................. 16
2 Revisions
3 Introduction
This document describes how to swap DUL20 with new BB5216. Take into
consideration that this activity impacts ongoing traffic.
3) Physically change the DUL20 with the BB 5216 in the same position
4 Requirements
• Before reaching the site: L19.Q3 has to be downloaded to the
local PC using E/// vpn.
• Putty
• Serial Cable
• Ethernet Cable
To prepare the client computer for the on-site activity, do the following:
1 Using Ethernet cable, connect the client computer to the Fast Ethernet
port (LMTB) of the DUL20.
Fig.1
4 Start EMAS
Fig.2
• From Drop Down Menu select Upgrade and Backup, On the right
panel select CV Tab and click Create CV
Fig.3
Fig.4
Fig.5
Fig.6
Ericsson Internal
8 (16)
Prepared (Subject resp) No.
• Using RBS Element Manager, from Drop Down Menu select Upgrade
and Backup, On the right panel select CV Tab, right click on the
previous created CV (es. Backup_DUL), then select Put to FTP.
Fig.7
- cvName: Backup_DUL
-
- pathOnFtpServer: /
- cvBackupNameOnFtpServer: Backup_DUL
- ftpServerIPAddress: 169.254.1.11
- ftpServerUserId: ericsson
- ftpServerPassword: ericsson
Ericsson Internal
9 (16)
Prepared (Subject resp) No.
Fig.8
• Click Execute.
• Wait until this action will be successfully completed and click Close.
Physically change the DUL20 with the BB 5216 in the same position
Ericsson Internal
10 (16)
Prepared (Subject resp) No.
Install the RPM777193 / 01500 power cable using the same position in the
PDU on the same RBS 6101.
Ericsson Internal
11 (16)
Prepared (Subject resp) No.
Install the RPM77701/01200 signal cable using the same position in the TCU
on the same RBS 6101.
If necessary, change the TSR432151 / 2000 ethernet cable using the same
position on the Carrier Ethernet IP port.
Physically change the DUL20 with the BB 5216 in the same position
Ericsson Internal
12 (16)
Prepared (Subject resp) No.
Install the RPM777193 / 01500 power cable using the same position in the
PDU on the same RBS 6101.
Install the RPM77701/01200 signal cable using the same position in the TCU
on the same RBS 6101.
Ericsson Internal
13 (16)
Prepared (Subject resp) No.
If necessary, change the TSR432151 / 2000 ethernet cable using the same
position on the Carrier Ethernet IP port.
Ericsson Internal
14 (16)
Prepared (Subject resp) No.
Physically change the DUL20 with the BB 5216 in the same position
In this option the same power cable from the RBS 6601 to the site breaker is
used.
Ericsson Internal
15 (16)
Prepared (Subject resp) No.
If necessary, change the TSR432151 / 2000 ethernet cable using the same
position on the Carrier Ethernet IP port.
Verify if the basic package is the correct one: otherwise BB5216 Format with
New Basic Package Loading Procedure is needed.