You are on page 1of 8

Move to gerdas

Demarkasi areaCheck Trouble 28


TemuanTRACK leakage maju DOZER mundur patah
P5M DAN BAGI JOB, PEMBUATAN JSATRAVELINGRemove cover
1 P D375A6R DZ571 KP424507 28694 28694 28 Dec 22 07:00 LOW POWER Cabut patahanFUEL bautPRO 28 Dec 22 08:00 28 Dec 22 08:00 1.0 RFU USM DISP REDISTURB
KE UNITREPLACE
Install joint leakage
2 P D85ESS2 DZ144 KP424511 1825 1825 28 Dec 22 07:16 OIL TM LOW Move to gerdas 28 Dec 22 08:30 28 Dec 22 08:30 1.2 RFU USM Pak wiwik GERDAS
Leveling Oil Transmisi
Demarkasi
P5M DAN BAGI JOB, areaCheck
PEMBUATAN Trouble
JSATRAVELING
3 P #N/A DZ610 KP424514 92 92 28 Dec 22 07:57 LOW POWER Install cover 28 Dec 22 10:00 28 Dec 22 10:00 2.1 RFU USM CADAS
P5M DAN Temuan *KEP5M
BAGI leakage
UNITREPLACE
JOB,&Ground
Prepare maju part
PEMBUATAN mundur
FUEL PRO
Tools patah
JSATRAVELING
test
4 P D155A6R DZ1116 00806023 69264 69264 28 Dec 22 09:34 REPAIR UC KE UNITRFEMOVE COVER Remove
P5m,* Buat buat cover
JSAjsa
ADJUSTER TRACKADJUST 29 Dec 22 00:00 28 Dec 22 04:09 -5.4 RFU SCM Egan PATIMURA
Final Check
TRACK LH * Sholat Cabut
RHRE-SEALREST Isya patahan
Prepare Congkel2 baut
tools,TIME,ADJUST
part
tanah UC TRACK Tri J
RFU
5 P D85ESS2 DZ144 WO PLANT 1829 1829 28 Dec 22 13:30 REPAIR ENGINE Sholat *isyaPerjalanan Install
CGB unit joint leakage
& Stand bintang unit- kwest 28 Dec 22 23:00 28 Dec 22 04:09 -9.4 RFU SCM Ajib WS BINTANG
Leveling Demarkasi* QA Oil Transmisi
1 area Suduri
Suwarno, Anung, Ozy
6 P D375A6R DZ519 KP424563 48820 48820 28 Dec 22 18:56 OIL HYD LOW Install cover 28 Dec 22 22:00 28 Dec 22 21:00 2.1 RFU USM Wahyu DISP K-WEST
ACTION PS DAN Add
* Action oil
BACKLOG, PS 4 hyd,
t/m, 1000KARCERe/g
HM RADIATOR, Totok, Johan
7 P D155A6R DZ1152 00807038 49234 28 Dec 22 08:35 PS01 + BACKLOG * ChangeHOSE
REPLACE oil hydrolic Ground
LIFT, REPAIR testHOSEoilGREASE
+ Flushing hydrolicDI 28 Dec 22 14:30 28 Dec 22 22:00 13.4 RFU SCM PEDAYAK SELATAN
* Replace
BALDE, CekREPLACE Final
kebocoran,
Filter Check oilFILTER rfu AC
hydrolic
8 P D155A6R DZ1106 00803953 64746 27 Dec 22 13:00 OVERHAUL UNDERCARRIAGE P5M DAN BAGI * Action RFU
JOB, PEMBUATAN JSA
Backlog 31 Dec 22 23:00 ### RFU SCM Pak sutrisno, Pak memet W/S BINTANG
* Action FUI + ACC + IArest time, Blender bolt Conti Suhendrik, Fikrian, Yanu.
9 P D155A6R DZ1205 00807040 30973 28 Dec 22 10:34 PS04 + BACKLOG 29 Dec 22 21:00 ### SCM KARTINI
TRAVELING mountingKE UNITCHECK windowTROUBLE, Transmisi REPOSISI nue
Conti
10 P D155A6R DZ1072 WO PLANT 85894 29 Dec 22 03:40 RE-SEAL TRACK ADJUSTER TRACK DI*IDLER AdjustYANG V beltKENDOR, Alternator TRAVEL KE 29 Dec 22 17:00 ### USM JAKARTA
* Adjust V beltAMAN compressor nue
TRAVELING KETEMPAT
Install track lh BALDE LIFT
UNITREPOSISI Conti
11 P D155A6R DZ1227 WO PLANT 85894 29 Dec 22 02:50 REPLACE CAP LIFT CYLINDER BLADE * Reposisi + install pin Blade 29 Dec 22 09:00 ### USM PSE
CYLINDERREPLACE Adjust track CAP DAN SHIM nue
* Remove Track Roller RH 4 pcs Conti
12 P D155A6R DZ1241 WO PLANT 22857 29 Dec 22 06:02 CYLINDER BLADE ABNORMAL Pengecekan ke Cekoscar idler, ada lh potensi ICM 29 Dec 22 12:00 ### USM FLAMINGGO
* Remove bolt mounting Track Roller LH 2 pcs nue
Move to bandara pedayakTrouble track lh lepas
TRACK * CGB EXCAVATOR area kerja
*P5m
* Completed checklist
*Prepare tool
1 P EX12006 EX1306 KP424507 15271 15271 28 Dec 22 08:35 REPAIR TRACK *Install track lh
Buat laporan ??? 28 Dec 22 08:30 -0.1 RFU USM PEDAYAK SELATAN
*Prepare plat dan oxy, acy ke CT 019 Gl:pak Hartoyo, Pak Riski,
2 P PC1250SP8 EX1128 00806472 27008 27008 28 Dec 22 03:00 PS 04 *Travel
Adjust to trackunit 28 Dec 22 18:10 28 Dec 22 12:00 9.0 RFU SCM MP: Mas Supri, Mas Rodhy, Mas PCB
*Prepare area kerja Nuhrian,Gl:Mas
PakAndrian,
risky Aziz
3 P PC1250SP8 EX1119 KP424494 47774 47774 28 Dec 22 03:30 LOCK PIN ARM ABNORMAL *Pembuatan Cekdan idlersosialisasi
lh jsa 28 Dec 22 12:00 28 Dec 22 16:20 12.8 RFU USM PELANGI
Reposisi unit LH MP:Pambudi,
Mp: Joko, Fatchan, Arfiyan
Fahrian, dan 2
*Reposisi
. Cleaning frame
tanah Conti
4 P PC8508R1 EX2361 WO PLANT 26925 27 Dec 22 09:27 REPAIR TRACK QA1 29 Dec 22 12:00 ### SCM welder PEDAYAK WEST
*RenForce
. Adjust frame
track RH LH nue
CheckCvoltage battery Conti Gl. Pak karim , Pak triono
5 P PC400LC-8 EX291 WO PLANT 4656 25 Dec 22 09:00 REPAIR FINAL DRIVE *Buat
.WAITING
Check plate PART
kebocoran untuk frame
, WAITING
track sisi
PART
adjusteratas ??? ### SCM PDY WEST
*Buat plate Check untuk pressure
skur frame grease sisipump nue
. Check carrier
Check roller
vbelt no 1luarrest
RH time,-
6 P PC1250SP8 EX1161 KP424564 25872 25872 28 Dec 22 19:35 TRACK KENDOR Continue Welding frame 28 Dec 22 21:35 28 Dec 22 20:15 0.7 RFU USM BANDARA THAMRIN
. Ground test
- replaceGreasing idler. Rfu adaAll di Ct 115 Conti
7 P PC1250SP8 EX1166 KP424565 23257 28 Dec 22 20:30 TRACK LH LEPAS CEK Take TRACK sample,P5M
ADJUST TRACK 29 Dec 22 07:00 ### USM PEDAYAK
- bawa kawatengine mix nue
-- Krida Action
bawa workshop
kabelps 1roll Conti
8 P PC8508R1 EX2356 00805747 26271 29 Dec 22 23:20 PS 01 - Perpare administrasi 30 Dec 22 11:20 ### SCM CENDRAWASIH
Replace
- bawa fuel pro& part
gerinda nue
Remove
ARTICULATED - bawa cover QA1jetbawah DT,WT,FT
chissel engine
-Remove
reseal ▪︎Prepare Action
cover
track toolFUI& JSA
control
adjuster(info valvegl)
1 P HM4003R DT1692 KP424504 22876 22876 28 Dec 22 05:02 PARKING BRAKE ABNORMAL BERASAP Reoring - Cek plug drop
punggung
▪︎Reposisi voltage Unitcv batt5 spool 28 Dec 22 09:00 28 Dec 22 09:00 4.0 RFU USM JARI 04
Repair kebocora • Cek - Sampling
troubleplug Eror oil 03line filter
cover
2 P HM4003R DT1721 WO PLANT 18667 18667 28 Dec 22 08:00 REPAIR HYD ELECTRIC -Add Cekdrum pressure grease AC brake 28 Dec 22 11:00 28 Dec 22 11:00 3.0 RFU SCM TS KENARI
• Cek kebocoran hose return
3 P HM4003R DT1692 WO PLANT 22876 22876 28 Dec 22 09:00 REPAIR AC •- Replace
Manual
Cleaninggreasing hose ac All
filterreturn dalamshaft
brake 28 Dec 22 11:00 28 Dec 22 11:00 2.0 RFU SCM TSSP Q 3 JARI
-• Check
Replace Leveling drain
filter oilachole
T/Mluar
4 P HM4003R DT1721 WO PLANT 18667 18667 28 Dec 22 08:00 REPAI R HYD ELECTRIC - •Check -Create all JSA
lightning 28 Dec 22 11:00 28 Dec 22 11:00 3.0 RFU SCM TS KENARI
Ground test unit Gl;pak budiyanto, MP: Galih
Check -autolube
-- Prepare P5M
tools & Part line - Iwan
5 P HM4003R DT1713 KP424526 19923 19923 28 Dec 22 10:44 HOSE HYD LEAK --- Prepare
Replace
Cek flexible administrasi
hosemuffler brake 28 Dec 22 15:07 28 Dec 22 15:07 4.4 RFU USM - UT CREW TS KENARI
- Prepare Spare partsQA1 - Sujud
- Grond - Take test PAP& Finalall Oilcheck - ARIS M (C)
6 P HM4003R DT1757 00807260 1045.9 1045.9 28 Dec 22 03:51 PS 04 Action FUIdifferential,All final 28 Dec 22 15:30 28 Dec 22 15:30 11.7 RFU SCM - Rosyid W/S BINTANG
- Change oil engine,T/M,All - RAHARJO
7 P HM4003R DT1721 KP424536 18671 18671 28 Dec 22 15:17 ERROR 03 driveREST TIME,- - CekReplace drop voltage all Catried batt filter ( E/G, 28 Dec 22 21:17 28 Dec 22 18:01 2.7 RFU USM - VIKRI TS KENARI
T/M, H/D, - SamplingFuel, fuel oil pro)
8 P HM4003R DT1717 KP424542 18528 18528 28 Dec 22 17:18 VESSEL ABNORMAL - Replace Air - Cek pressure
Cleaner & filter AC
-Create AC 28 Dec 22 22:18 28 Dec 22 18:07 0.8 RFU USM CENDRAWASIH
- Manual - P5MJSAAll shaft vicky
- PREPARE - Addgreasing
-- Prepare grease
tools
TOOL &tank
AND Part JSA
9 P HM4003R DT1699 WO PLANT 15742 15742 28 Dec 22 13:11 REPAIR HYD ELECTRIC Prepare
- Check administrasi
drain hole 28 Dec 22 22:07 29 Dec 22 03:35 14.4 SCH USM - ibba REHAB KWEST
- Retoque bolt - move -- mounting
replace 1. P5M
pedaya bottom
batteryto anggrek 2pcsguard transmisi
Prepare Spare parts Conti
10 P HM4003R DT1626 00806977 38552 27 Dec 22 08:45 PS 02 - Ground --2. Check
RepairKrida test&all
hose lightning
Workshop grease
final check 31 Dec 22 18:00 ### SCM W/S BINTANG
- --Checkinstal autolube
Waiting ACC unit- Valve PPMline nue
- Replace O-ring 3. input
Prepare &JSA output fuel pro
11 P HM4002FT DT1590 WO PLANT 44282 44282 27 Dec 22 09:43 REPAIR BRAKE SYSTEM -- Cek
- membuat
instal
penarikan
-bottombrake
Cek
nomor
4.
drop
Prepare
unit,
pump
guard voltage
lambung
washing Part
assembly
T/M n E/G
yg
unit. hilang 28 Dec 22 17:00 29 Dec 22 00:23 38.7 RFU SCM
Rohmat
DISP ANGGREK
- completed - QA1REST line
prepare conection
tools&JSA
TIME,Action brake FUIP5M
sistem - AntonRio p (C)
-- bleading
Check
Cek
Prepare -Action
-- Cek
flexible
drop
ground fuelvoltage
administrasi
kebocoran test
mufler
system Conti - Sahal
12 P HM4003R DT1696 SAFTY 17921 27 Dec 22 07:00 VESSEL REBAH - Cek drop voltage
PStools2000 batt 28 Dec 22 00:00 ### ICM TSSP KUTUKAMBING
- Prepare-- Cleaning
- ProkerSpare autolube
parts nue - Istanto
- Wahyubudi
- Change -measurement
-Sampling
Jackoil Cabin oil
hydraulic
- Waiting - Cleaning
- Cek area
all(dt1551)-
lighting - Wahyudi
13 P HM4003R DT1730 00807261 16052 16052 28 Dec 22 03:50 PS 04 - Remove REST - mechanic
Cek Hose
TIME,- -RFU
pressuredemand
Adjust ACvalve
PPM
valve 28 Dec 22 13:50 28 Dec 22 17:35 13.8 RFU SCM - Niam W/S BINTANG
- --Cek&clean
Administrasi bottom& reporting
guard -- Iwan
Manual - Cek
- Install
- Adjust
drop
motor
greasing voltage
v-belt cab All
AC shafttransmisi
tilt 1. Santoso(C)
Adi
14 P HM4003R DT1630 WO PLANT 22112 22112 28 Dec 22 07:30 REPAIR ELECTRIC - Cek&clean - QA1 bottom guard engine 28 Dec 22 21:30 28 Dec 22 20:15 12.8 RFU SCM 2.- -Wahyu
Galih S
Khoiril PS PEDAYAK
- Adjust - Leveling
Check drainoli
v-belt Alternator HYD
hole
2hoseAction
-Action PAP valve
fui: -3.Sujud
Adi
- Inal(Autolube)
15 P HM4002 DT1583 00806969 35538 35538 28 Dec 22 08:28 PS 02 --Install - Check
Replace bulballdemand
lightning
front lamp 28 Dec 22 20:28 28 Dec 22 18:45 10.3 RFU SCM WS BINTANG
PENARIKAN
3. Action Service UNIT,
-500REST WASHING,1.
TIME,. Action P5M activity 4.Irvan
Satrio
-* Check
- Check
-- ReplaceGroundtestdrain
autolubebattery
hole
line (C)
16 P HM4003R DT1630 WO PLANT 22112 22112 28 Dec 22 07:30 REPAIR HYD ELETRIC - 2.TambahKrida
Check
- Final Workshop
air
end
check battery
play 28 Dec 22 22:30 28 Dec 22 17:00 9.5 RFU SCM 5. Asad PS PEDAYAK
- -Cek Replace bottom guard
terminal T/M&n(-)
(+) E/G - Nur hayat
- Repair -cutting 3. Prepare
bolt - operator
filter
rfu JSA
engine seat
- Replace -
- PREPARE Check knob flexible
lever
TOOL mufler
dump
AND body
JSA - inal (autolube)
17 P HM4002WT DT1551 00806970 51529 51529 28 Dec 22 13:00 PS 02 4. Prepare - Repair Part - Cek
lock drop hodvoltage 28 Dec 22 23:00 28 Dec 22 21:52 8.9 RFU SCM WS BINTANG
-jack
---WAITING
Action
-Proker
Add PSE/G
cabin
grease 500
UNIT - aldi
- Adi rb(C)
rest--time,- Repair Addhose autolube
greasetank
Grease Conti
18 P HM4003R DT1679 00807264 19787 28 Dec 22 16:00 PS 03 - Replace Adjust Accumulator 29 Dec 22 02:00 ### SCM - -farhan
ebit WS BINTANG
- WAITING -bolt
MANPOWER
- Replace
-Replace
Repair Cekhosemounting
allsun lighting PART
visor
autolube seatSINDO
belt nue
- Cleaning - bottom
- REPLACE bulb
guard
PIRO front
engine
TUBE lampand transmisi -- doni
dwi
19 P HM4003R DT1760 WO PLANT 21275 21275 28 Dec 22 17:10 FIRE SUPRESSION ABNORMAL - Cek&clean
- Repair - Add - Addbottom
wiring grease
grease tankHOSE
guard
articulated
transmisi 28 Dec 22 21:00 29 Dec 22 03:27 10.3 RFU SCM EKO TANTO TS HYDROS
- Retoque
--replace
Cek&clean bolt
-hose -
Adjustspider
ADJUST
bottom
epcVto drive
beltFIRE
guard shaft
E/G
hydraulic RH
engine2
pump& LHAction
- Mts &-Repair wiring
otw-lokasi-Create motor Grease
JSA pump
20 P HM4003R DT1671 00806972 17799 17799 28 Dec 22 17:10 PS 03 - Replace -Replace
Adjust
- Add hose guard
replace
V PAP
belt
ls
Grease
suspension
fuse
alternator
hydraulictank pump 29 Dec 22 03:10 29 Dec 22 05:47 12.6 RFU SCM WS BINTANG
- Prepare - Cleaning
MANPOWER
3. Action tools &
unit
Service Part - vicky
-cleaning -- Repair bottom
hose guard
autolube engine
21 P HM4003R DT1721 WO PLANT 18671 18671 28 Dec 22 18:00 REPAIR HYD ELECTRIC leveling
PART 4.- Cleaning
SINDO
Action oliactivity
transmisi
area
CREW 28 Dec 22 15:17 29 Dec 22 00:00 6.0 RFU SCM - ibba TS KENARI
- Retorque --Add bolt Drive Shaft front
- Administrasi
- Tambah cek grease
kebocoran
& batterytank
Reporting Conti
22 P HM4003 DT1744 WO PLANT 11497 29 Dec 22 02:49 REPAIR HYD ELECTRIC - Modif mounting -turunair
bottom cabin
guard transmisi(welding) 29 Dec 22 05:00 ### SCM FRONT CADAS
-- Ground
Replace test&
spidertest final
shaftcheck rear nue
-ground
- Re-oring hose slack adjuster Conti
23 P HM4002 DT1588 00807552 48549 29 Dec 22 04:14 PS 02 - replace
Penarikan Hose -leveling outputolibrakepumprest
unit,washing unit,prepare time,5.
hydraulic part 29 Dec 22 14:14 ### SCM W/S BINTANG
- Retorque bolt torque rod Rear nue
Ground
-pengecekan tes-P5M & Final
alternator check Conti
HM4003R - Retorque
Penarikan bolt- P5M Drive Shaft frontpart
24 P DT1766 WO PLANT 535 29 Dec 22 05:13 PS 02 6. unit,washing
Cleaning
- Cleaning
Cleaning
-creat unit
JSA
unit,prepare
area& base 29 Dec 22 15:13 ###
nue
SCM W/S BINTANG
Ground - -krida test base area
trouble Conti
25 P HM4003R DT1760 WO PLANT 21277 29 Dec 22 05:43 REPAIR ENGINE SYSTEM 7.-prepare
Dokumentasi
-- Administrasi
tool- Create &npart-krida
complated
& Reporting check list
workshop 29 Dec 22 09:43 ### SCM JL KENARI
#Administrasi
Remove cover &JSA Reporting
transmisi nue
- Prepare -Running tool Unitpart
# Washing selenoid
GR,WL c/v&transmisi area
- PPM -Check E/Gkebocoran
and HYDlow T/M
system
# Remove selenoid valve & forward
REST TIME,-Retorq - adjust Hose freon oil cooler ke T/M
1 P GD825A2 GR380 WO PLANT 68412 68412 28 Dec 22 07:18 REPAIR TM # Cleaning selenoid valve low & forward 28 Dec 22 13:05 28 Dec 22 13:05 5.8 RFU USM BANDARA THAMRIN
# install selenoid - -Replace
add oil edge T/M
valve low & forward
2 P GD825A2 GR380 KP424539 68416 68416 28 Dec 22 16:24 TM ABNORMAL -cleaning Radiator 28 Dec 22 18:07 28 Dec 22 18:07 1.7 RFU USM - Agus S PS SAMRAT
# install - Action
cover transmisiFUI
- Winar
--Cleaning
#Action
Ground PSUnit 500
test
3 P GD825A2 GR511 WO PLANT 47581 47581 28 Dec 22 05:35 PS 02 -instal bolt motor circle 28 Dec 22 15:00 28 Dec 22 18:13 12.6 RFU SCM -Andika
nurul A W/S BINTANG
- replace # Completed circle
o-ring motor
-repairt hose autolube & circle -.IYusuf
one
4 P GD825A2 GR436 00805783 46576 46576 27 Dec 22 04:14 PS 02 --cleaning
Prepare JSA
brether toolsfuel Part
tank 28 Dec 22 12:00 30 Dec 22 00:00 67.8 RFU SCM W/S BINTANG
- Reposisi - install
- cleaning & shoe
install
brether circle
jointhyd 4pcs
drawbar
tank .crew magang
- Samian
GD825A2 -- Prepare-Cleaning
Waiting JSA
part tools
Area & time
P5m Part  
5 P GR506 WO PLANT 34199 34199 27 Dec 22 19:48 REPAIR HYD ATTACHMMENT - replace terminal batre lh & ( - rest
)REST TIME,- replace 27 Dec 22 23:48 29 Dec 22 02:24 30.6 RFU USM - Yosep WS PEDAYAK
- Install - Pengecekan
- Prepare
& . Prepare
retorque JSA tools
bolt trouble
Jsa & Part
joint drawbar
trunion hyd pump - Samian
6 P GD825A2 GR380 WO PLANT 68416 68416 28 Dec 22 18:00 REPAIR TM - Cek .-pressure
-- Change Prepare
Ground transmissi
tools
relay testAC 28 Dec 22 18:07 29 Dec 22 04:06 10.1 SCH USM PS SAMRAT
proker autolube - Yosep
. Instal
- Pengecekan - Ground
plate wiringcircle test
rear 2 pcs AC
compressor Samian
7 P CAT14M3 GR566 WO CCR 11001 11001 28 Dec 22 22:45 AC HOT -adjust relief pressure 29 Dec 22 02:23 29 Dec 22 02:23 3.6 RFU USM WS PEDAYAK
- Pengecekan. wiring Instal - -cleaning
Create
shoe
Thermostat JSA
circlearea2 pull pcs down switch
Conti
- Yosep
8 P GD825A2 GR463 00806465 34369 29 Dec 22 02:00 PS 01 -- Prepare
. Adjust
Check tool
- reportingcircle
pressure &all part
AC 29 Dec 22 12:00 ### SCM W/S BINTANG
. Replace - -Action
Ground PStest
cutting 750 edge nue - Samian
9 P GD825A2 GR498 00806975 34811 34811 28 Dec 22 23:27 PS 03 . Replace - Add guide water blade coolant 2 pcs 29 Dec 22 03:22 29 Dec 22 03:22 3.9 RFU SCM - Yosep WS PEDAYAK
- Replace . Welding bladelock wiper guide depan blade bawah
- Adjust linkage . Cleaning E/Gunit stop motor Page 1
* CGB unit & Stand unit 29
* QA 1
TRACK
* Action PS 4 1000 HM
DOZER
1 P D155A6R DZ1227 00805749 85894 85894 29 Dec 22 02:50 REPLACE CAP LIFT CYLINDER BLADE * TRAVELING
Change oil hydrolic KE UNITREPOSISI + FlushingBALDE LIFT
oil hydrolic 29 Dec 22 09:00 29 Dec 22 10:39 7.8 RFU USM PSE
CYLINDERREPLACE
* Replace Filter CAP DAN SHIM
oil hydrolic
P5M DAN BAGI JOB, PEMBUATAN JSAtraveling ke
2 P D155A6R DZ1266 KP424576 2890 2890 29 Dec 22 07:48 LOW POWER * Action Backlog 29 Dec 22 10:04 29 Dec 22 10:04 2.3 RFU USM FRONT KUTILANG
unit, check trouble, replace fuel pro
* Action FUI + ACC + IArest time, Blender bolt Suhendrik, Fikrian, Yanu.
3 P D155A6R DZ1205 00807040 30973 28 Dec 22 10:34 PS04 + BACKLOG 29 Dec 22 21:00 30 Dec 22 04:52 42.3 RFU SCM KARTINI
TRAVELING mounting
KE UNITCHECK windowTROUBLE, Transmisi REPOSISI
4 P D155A6R DZ1072 WO PLANT 85894 85894 29 Dec 22 03:40 RE-SEAL TRACK ADJUSTER TRACK DI*IDLER AdjustYANG V beltKENDOR, Alternator TRAVEL KE 29 Dec 22 17:00 29 Dec 22 04:20 0.7 RFU SCM JAKARTA
* Adjust
check trouble, cekTEMPAT V belt
pressureAMAN compressor
ac, replace compressor
5 P D85ESS2 DZ141 WO PLANT 5693 5693 29 Dec 22 13:53 REPAIR COMPRESSOR AC * Reposisi + install pin Blade air cleaner 29 Dec 22 22:40 30 Dec 22 04:52 15.0 RFU SCM KENARI
ac,P5M
repair wiring work
DAN BAGI JOB, PEMBUATAN JSAREPLACE lamp rear , replace
* Remove Track Roller RH 4 pcs
6 P D155A6R DZ1106 00803953 64746 27 Dec 22 13:00 OVERHAUL UNDERCARRIAGE WATERPUMPPREPARE RUNNING, CHECK 31 Dec 22 23:00 ### RFU SCM Pak sutrisno, Pak memet W/S BINTANG
* Remove bolt mounting Track Roller LH 2 pcs
KEBOCORANINSTALL BOTTOM GUARD Conti
7 P D155A6R DZ1241 WO PLANT 22857 29 Dec 22 06:02 CYLINDER BLADE ABNORMAL Pengecekan* ke CGB oscararea, ada kerjapotensi ICM ??? ### SCM FLAMINGGO
nue
p5m dan bagi *job, Completed prepare checklist part dan toolsevakuasi Conti
8 P D375A6R DZ547 00807035 41797 29 Dec 22 19:33 PS 03 * Buat laporan 30 Dec 22 23:00 ### SCM W/S BINTANG
unittuker unit *P5m dengan dz522 nue
Conti
12 P D155A6R DZ1270 389 29 Dec 22 20:33 LAMPU KERJA MATI repalce *Prepare work lamp, 29 Dec 22 21:33 ### USM HARTAB
-P5Mtool nue
*Travel
-Prepare P5M totools
unit Conti
13 P #N/A penarikan unit servis 0.0 USM
-Buat *Prepare•JSAprepare area
& soialisasi
toolskerjaJSA nue
#reposisi unit tempat aman
*Pembuatan
TRACK -Travel
• prepare dan sosialisasi
toEXCAVATOR
EX
sarana1166 jsa
#cek clearence crcle
*Potong track frame
•-Reposisi
travel unitsisi luar
unit p: Joko, Lukman, Nuhrian, dan 2
#cek dropto voltage Conti
1 P PC8508R1 EX2361 WO PLANT 26925 27 Dec 22 09:27 REPAIR TRACK *Buat plat -Prepare sambungan
• reposis area unit track
kerja frame 29 Dec 22 12:00 ### SCM welder PEDAYAK WEST
#QA1 nue
*Reposisi plat sambungan
-Repair hose track frame Conti Gl. Pak Riski
PC400LC-8 • pengecekan
WAITING #add PART oli f/d grease
clearanceLh Rh circle
2 P EX291 WO PLANT 4656 25 Dec 22 09:00 REPAIR FINAL DRIVE *Welding
•-Remove
pengecekan platWAITING
cover sambungan
bawah
PART
e/g
30 Dec 22 00:00 ###
nue
SCM
GL : Pak Riski
PDY WEST
#smple olidrop engine voltage
3 P PC1250SP8 EX1166 KP424565 23257 23257 28 Dec 22 20:30 TRACK LH LEPAS • pengecekan*Retorque
-Replace sprocket
fuel
pressure pro assy
Grease RH pump 29 Dec 22 07:00 30 Dec 22 04:15 31.7 RFU USM MP : mas yoga, mas fatchan, PEDAYAK
#relace fuel pro
-Evakuasi unit ke *Lepas
area amanREST
• sample yoke
all oil engine TIME,-hujan khanifan, bagas
#remove cover bawah
4 P PC8508R1 EX2356 00805747 26271 26271 29 Dec 22 23:20 PS 01 *Canibal *Prepare
piping
• replace -Reposisi PCV idler
fuel no
unitbaru
1 dr EX 1161
filter 30 Dec 22 11:20 30 Dec 22 00:00 0.7 RFU SCM CENDRAWASIH
#remove cover radiator
*Replace*Install
-Reposisi •*Check
replace fuelpro
piping
bucket PCV
Vattachment
belt
oil assy no 1
+ link
AC
filter GL : Pak Rizky
5 P PC1250SP8 EX1128 WO PLANT 27023 27023 29 Dec 22 07:25 ERROR 15 #greasing 30 Dec 22 00:00 29 Dec 22 20:40 13.3 RFU SCM PCB
#repair *Completed
-Instal
•*Check
Cleaning
hose lock-P5M pincover2
pressure
air
grease bucket
cleaner
linkACbuket M/P : Ketut, Dwi
GL : Pak Rizky
6 P PC1250SP8 EX1170 KP424578 23726 23726 29 Dec 22 09:00 AC HOT -Instal lock pin cylinder • *replace
*Bleeding Groundtest
-Prepare
#addbucket ACtools
drain
oli hyd unit
RH
filter(tidak masuk) pin
system 29 Dec 22 10:15 29 Dec 22 10:15 1.2 RFU USM KARTINI
-Buat JSA & soialisasi M/P : Ketut, Dwi
#cleaning •*Adjust
replace terlalu
tanahpressure besar
return
area travel ACJSA
filter motor
7 P PC8508R1 EX2374 KP424577 22201 29 Dec 22 10:25 OVRHEAT RDIATOR • reoring back -TravelCEKcompensating
-Cleaning RADIATOR
to EXtools 1166 pressure 29 Dec 22 23:00 30 Dec 22 01:50 15.4 RFU USM TS KWEST
#washing unit
• reoring -Reposisi
-Cleaning
#Cleaning - P5M
punggung unit
areac/v LH
tools
8 P PC8508R1 EX2370 00806465 22151 22151 29 Dec 22 14:20 TRACK LH MAU LEPAS 29 Dec 22 18:00 29 Dec 22 18:00 3.7 RFU USM TS CADAS
#Travel -Prepare
- •Prepare change
to workshop area
administrasi
oil kerja
engine bintang
9 P PC1250SP8 EX1161 25886 25886 29 Dec 22 01:30 LAMP BOOM OFF --Repair
•Prepare
REPAIR replace -hose
P5M
LAMPU Spare
plug grease
parts
BOOM
PTO 30 Dec 22 02:15 30 Dec 22 02:40 25.2 RFU USM TAMRIN
#Reporting
- Prepare
-Remove • *change cover administrasi
QA1 oilbawah
PTO e/g Conti
10 P PC8508R1 EX2347 00806471 23030 30 Dec 22 03:50 PS 04 - Prepare travel
Spare to unit
parts QA1 31 Dec 22 13:50 ### SCM BANDARA PEDAYAK
-Replace
*• pengecekan Action
replace fuel fuelpro
FUI proassy
unit nue
-Evakuasi Action
unit keFUI area aman Conti
11 P EX12006 EX1304 18169 30 Dec 22 04:25 REPAIR TRACK SYSTEM * --replace
•Cekremove
Cek
drop
droplampu voltage
cover
voltage c/w cover1batt
pcs
batt 30 Dec 22 05:00 ### SCM SUM KARAKUM
REST TIME• - Sampling
replace oil pilot filter nue
* grontest
- Sampling oilAC
ARTICULATED -• Cek
repair -pressure
* electrical
P5M
rfu DT,WT,FT
•-replace
Manual - Cekgose pressure
greasing swing AC
All shaft
brake
- Krida area bays Conti
1 P HM4003R DT1626 00806977 38552 27 Dec 22 08:45 PS 02 OVH DIFF FRONT & TM - Manual
• pengecekan - Check greasing
drain
hole All shaft
hole
water pump 31 Dec 22 18:00 ### SCM W/S BINTANG
- Create Jsa nue
• replace -
- Check Check hose drain
allauto
lightninghole
bleeding Conti
2 P HM4003R DT1696 SAFTY 17921 27 Dec 22 07:00 VESSEL REBAH centering - Prepare frame tools rear 28 Dec 22 00:00 ### ICM TSSP KUTUKAMBING
-Check Checkautolube
• --pengecekan all lightning
sprocket line nue
Remove alternator - Adi rb(C)
3 P HM4003R DT1679 00807264 19787 19787 28 Dec 22 16:00 PS 03 - Cek- •bottom Check
add autolube
guard
Grease
- Waiting T/M
drum
part
linen E/G
29 Dec 22 02:00 29 Dec 22 09:26 17.4 RFU SCM - ebit WS BINTANG
- Cek bottom
- Check • add guard
flexible
afnacmuflerT/M n E/G
- install alternator - dwi (C)
- Santoso
4 P HM4003 DT1744 WO PLANT 11497 11497 29 Dec 22 02:49 REPAIR HYD ELECTRIC - Check replace flexible
alternator mufler 29 Dec 22 05:00 29 Dec 22 22:53 20.1 RFU SCM FRONT CADAS
-•-Groundtest
Action
add oil PS F/D250 RH
unit - Wahyu Setyawan
• greasing - Action - PPM PS 250
attachment
5 P HM4002 DT1588 00807552 48549 48549 29 Dec 22 04:14 PS 02 - Leveling all oil 29 Dec 22 14:14 30 Dec 22 03:13 23.0 RFU SCM -- Wahyu W/S BINTANG
-• Replace
add -oil
PPM oilpelaporan
hydrolik filter SantosoBudi(C)
- Final check & - Fajri
6 P HM4003R DT1766 WO PLANT 535 535 29 Dec 22 05:13 PS 02 -- --prepare
Replace
prepare
Replace
• washing oilunit
tools&JSA
fuel
tools&JSA filter
filtr 29 Dec 22 15:13 30 Dec 22 03:13 22.0 RFU SCM
- Wahyu Setyawan
W/S BINTANG
- Replace - otw •-install
element Replace
- jemper
mengerjakan fuel
racorREST
cover unit filtr
unit
cover TIME,-
lain Adjust - WahyuIwanBudi
7 P HM4003R DT1760 WO PLANT 21277 21277 29 Dec 22 05:43 REPAIR ENGINE SYSTEM - Replace element
-- travel
pengecekan to racorREST
ws
• accumulator
cleaning mini
unit tool TIME,- Adjust
pedayak
trouble 29 Dec 22 10:47 29 Dec 22 10:47 5.1 RFU SCM -- Fajr
Adi JL KENARI
- replace
Replace -
- replaceprepareaccumulator
sensor
busa
• Cleaning locktools&JSA
common
operator
eg
area hoodseat rail - wahyudi
8 P HM4003R DT1717 KP424574 18538 18538 29 Dec 22 07:45 COVER ENGINE ABNRMAL/GREASE HABIS -- -Replace
pengecekan busa
- -groundtest,rfu operator
unit eg trouble seat 29 Dec 22 10:26 29 Dec 22 10:26 2.7 RFU USM CENDRAWASIH
reposisi •Add
tube coolant
reporting lock hood - As'ad
Prepare --- -remove
Add Add
JSA coolant
battery
tools
air baterry
groundtest,rfu & Part - wahyudi
9 P HM4003R DT1628 KP424572 38077 38077 29 Dec 22 07:55 ELECTRIC ABNORMAL 29 Dec 22 13:14 29 Dec 22 13:14 5.3 RFU USM CENDRAWASIH
- Pengecekan
- Adjust -- Add
ambil airbattery
wiring
P5M
v-belt baterry
compressor AC
compresor --Istanto
As'ad
10 P HM4003R DT1704 KP424573 21673 21673 29 Dec 22 08:07 AC HOT - Adjust
--Repair -Krida v-belt
- install
Check pressure
workshop
claim compresor
batterybattery AC 29 Dec 22 09:00 29 Dec 22 09:00 0.9 RFU USM - Adi WS PEDAYAK
- Replace --- Repair
ground - Adjust
prepare
hose -claim
P5M
test
toolFreon
sterring battery
unit,rfu
&valve10
JSA pcs - As'ad
11 P HM4003R DT1627 KP424571 36708 36708 29 Dec 22 08:20 VESSEL ABNRMAL - Replace
- Replace oring - Preparehose
-prepare - Ground administrasi
sterring
discharge T/Mpcs
hose sparepart test valve10 pump 29 Dec 22 14:26 29 Dec 22 14:26 6.1 RFU USM WS PEDAYAK
- Replace - Prepare
oring hoseSpare discharge partsT/M pump Conti - Aris M
12 P HM4002 DT1613 WO PLANT 47369 29 Dec 22 09:30 REPAIR CHASIS seting- Repair
frame - waiting
mounting
rear,welding unitcondensor
frame rear 29 Dec 22 23:00 ### SCM WS BINTANG
- Repair -mounting
Waiting unit
condensor nue - Irvan
- Retoque bolt
- Prepare -cleaning
spider
JSA and unit
drive shaft LH RH
tools
QA1 drive - Doni
13 P HM4003R DT1765 WO PLANT 582 582 29 Dec 22 09:35 PS 02 -- -QA1REST
Retoque
- Cleaning
Repair hose bolt spider
TIME,-check
bottom
radiator drop
guard
to shaft LH
voltage
engine
reservoir RH
tank 29 Dec 22 21:35 30 Dec 22 03:13 17.6 RFU SCM
-Vikri
WS BINTANG
- Cleaning - check Action
bottom
--Cleaning allAFNAC FUI
light guard
arealampengine Galih
Add -Tarno
14 P HM4002 DT1552 KP424570 52730 52730 29 Dec 22 09:40 AC HOT --Administrasi
Cek drop
-Replace
Cleaning voltage
& area battery 29 Dec 22 10:36 29 Dec 22 10:36 0.9 RFU USM - Adi WS PEDAYAK
- -Check all
pressure filter
Reporting
AC -Crew UT
- Check
- Administrasi all PAP
lightning - Agung
15 P HM4003R DT1698 KP424633 22506 22506 29 Dec 22 19:24 OIL HYD LOW Adjust &
- -sampel FreonReporting
all 29 Dec 22 22:00 29 Dec 22 21:35 2.2 RFU USM WS PEDAYAK
-modif - Check autolube line
- lamp
Ground tyre testdan unitmundur
Conti
16 P HM4003R DT1627 36724 29 Dec 22 23:07 REM ABNORMAL - Cek bottom
-remove bracket drive shaft guard T/M ndepan E/G 30 Dec 22 02:07 ### USM PEDAYAK WEST
- Check flexible mufler nue - Amrin
-change oil engine
17 P HM4003R DT1629 WO PLANT 26524 26524 29 Dec 22 09:00 PS 02 - PPM REST TIME,- Action PS 500 29 Dec 22 20:00 29 Dec 22 20:00 11.0 RFU SCM - Sujud W/S BINTANG
- Action PAP all - Rivaldi
18 P HM4003R DT1673 18835 18835 29 Dec 22 23:44 AC OFF - Manual greasing all shaft 30 Dec 22 02:44 30 Dec 22 01:40 1.9 RFU USM WS PEDAYAK
19 P HM4002 DT1611 48594 48594 30 Dec 22 01:25 OIL HYD LEAK - Replace MOVE hose return brake
KELOKASI 30 Dec 22 03:00 30 Dec 22 05:53 4.5 RFU USM GERDAS
- ReplaceCEK hose B/C Front RH 2 pcs
KERUSAKAN
20 P HM4003R DT1756 KP424575 1004 1004 29 Dec 22 10:45 FIRE SUPRESSION ABNORMAL REPAIR- Repair GUAGE motor auto lube
MANIFOLD.FIRE 29 Dec 22 15:30 29 Dec 22 15:30 4.8 RFU USM KENARI
- P5M
- Instal pinISI linch-
FOAM,AIR Add grease tank Conti
21 P HM4003R DT1762 00807559 17835 30 Dec 22 04:05 PS 03 - Krida area workshop 30 Dec 22 14:00 ### SCM WS BINTANG
- Cleaning ADJUST areaFIRE fuel tank nue
- Cleaning - CreatRadiator JSA Conti
22 P HM4003R DT1676 KP424653 21198 30 Dec 22 05:30 OIL BRAKE LEAK - Prepare tool and part 30 Dec 22 09:30 ### USM TS K-WEST
- Cleaning unit nue
- prepare Bolot PAP-washing P5M unitREST TIME,- take Conti
23 P HM4003R DT1697 WO PLANT 15550 30 Dec 22 04:05 PS 02 - Cleaning tool & bays 30 Dec 22 14:05 ### SCM W/S BINTANG
data-creatPPMJSA E/G nue
- Administrasi & Reporting Conti
24 P HM4003R DT1756 WO PLANT 11329 30 Dec 22 05:42 PS 03 -prepare- tool take&sample part-repairt data PAP bulb rotary 30 Dec 22 05:42 ### SCM W/S BINTANG
- QA 1kotak belakang nue
-replace bulb lampu
GR,WL
- actionPS IV B .I one
-replace guide bladeREST TIME,-Replace plat lock
- Prepare
- check bracket tools HYD & part pump .Agus S
guide -P5M blade
1 P GD825A2 GR463 00806465 34369 34369 29 Dec 22 02:00 PS 01 - replace hose c/v
- flushing toBSS
fuel cyl BSS 29 Dec 22 12:00 29 Dec 22 15:30 13.5 RFU SCM .Dhimas B W/S BINTANG
- -prepareremove CYL
tool & JSA - Faidil
2 P GD825A2 GR532 WO PLANT 29417 29417 29 Dec 22 07:00 HOSE SIDE BLADE ABNRMAL - cleaning - -add
-prepare Resealoli
hole Hydraulic
CYLwater
sparepart BSSpump 29 Dec 22 10:12 29 Dec 22 10:12 3.2 RFU SCM -.Roy
WINARNOKarno
- Firman CS BANDARA CIKEAS
- cleaning - -install
replace outCYL bendera
put air comp - SUTOMO  
- waiting BSS
unit Conti - Crew magang
3 P GD825A2 GR507 00807565 40011 29 Dec 22 09:31 PS 04 - prepare
- -reseal
Groundtesttool
cyl BSS& jsa 29 Dec 22 21:31 ### SCM - DIMAS WS BINTANG
-instal bolt motor
- QA 1 A/C circle nue Faidhil S
--- Proker
pengecekan
--add
take
Finaloil
sample
check
auto HYD lube
pap - RHOFIQ
- Tri sulistiyo
4 P CAT14M3 GR566 KP424595 11008 11008 29 Dec 22 11:03 AC HOT - cleaning - adjust
bolt freon
joint air tank 29 Dec 22 16:30 29 Dec 22 16:30 5.4 RFU USM PS PEDAYAK
- Replace -solenoid
prepare- change tool,
bank & part
accumulator
rfuoil e/gdrawbar
- strainer
LH - -firman
EKO
5 P GD825A2 GR541 WO PLANT 26806 26806 29 Dec 22 14:12 REPLACE OIL ENGINE - cleaning
- pengecekan - replacecylinder filter e/g T/M 29 Dec 22 16:36 29 Dec 22 16:36 2.4 RFU USM - ishaq WS PEDAYAK
- Make- -Plate cleaning cylinder
replace fuel pro evap drawbar - kuswandi
• Yoko
6 P GD825A2 GR446 WO PLANT 66725 66725 29 Dec 22 14:40 REPAIR ELECTRIC HYD & BLADE - replace breather
- Welding plate T/M
- cleaning - jamper
stooper filter sensorDrawbar
cylinder
ac temperatur 30 Dec 22 00:00 29 Dec 22 22:28 7.8 RFU USM WS BINTANG
•-Muhajir
wantu
- cleaning- Addoil oil HYD
Hydraulic
filter air cleaner Conti - agung
7 P GD825A2 GR477 00806464 31356 29 Dec 22 23:50 PS 01 travel,washing
-- repair wiper unit,QA1
depan PS
atas 30 Dec 22 09:50 ### SCM W/S BINTANG
check- hole Groundtes water pump nue
9 P GD825A2 GR536 WO PLANT 29335 29335 29 Dec 22 22:50 PS 01 - torque - add bolt-geaseMounting
Rfu tank konsol 30 Dec 22 06:50 30 Dec 22 05:20 6.5 RFU SCM W/S BINTANG
- greasing - replace pulley, bulp panel
shaft and f/a
- replace
-cleaning v belt
unitAC Page 2
- Cek drop
- Prepare spareparts voltage batt
30- P5MAll&oiltool box
- Sampling
- Action FUI
ARTICULATED - Cek - pressure
Create
- Cek drop voltage DT,WT,FT
JSA ACbatt
- Manual Sampling oilAll
- -Prepare greasing
1.Action jsa& FUI :allshaft
tool PAK Wahyu adi
1 P HM4003R DT1627 WO PLANT 36724 36724 29 Dec 22 23:07 REM ABNORMAL --Check+Cek
- otw drain
All
lokasi hole
Lamp 30 Dec 22 02:07 30 Dec 22 11:22 12.2 RFU USM PEDAYAK WEST 7200
cek pressure AC - pak aris
-
- Manual Check
+Cek
- cekgreasing all lightning
drop voltage
kebocoran All shaft PAK Wahyu adi
2 P HM4003R DT1762 00807559 17835 17835 30 Dec 22 04:05 PS 03 30 Dec 22 14:00 30 Dec 22 18:44 14.7 RFU SCM WS BINTANG 9180
- remove +Cek - Check
hose drainslack
- Check tool autolube
hole
-P5M adjuster
drain&hole line
waterpump center 2pcs - pak aris
3 P HM4003R DT1676 KP424653 21198 21198 30 Dec 22 05:30 OIL BRAKE LEAK Cek---bottom
- -install
Prepare
Hose
Prepare
Check +Flushing
-KRIDA guard
slack
tool
all BAYS T/M
&fuel
lightning
part
partn 2pcs
adjuster E/G 30 Dec 22 09:30 30 Dec 22 10:20 4.8 RFU USM
PAK BUDI,Wahyudi
TS K-WEST 7200
QA1 Wantu
---Check
REST
Check
+Proker
-PREPARE
add
Prepare TIME
flexible
oilautolube
QA1 autolube
TOOL
transmissi
jsa&
Action
tube
tool line
FUI PAK Wahyu adi
4 P HM4003R DT1697 WO PLANT 15550 15550 30 Dec 22 04:05 PS 02 - DO ps 2000 hoursRest time- Continue 30 Dec 22 14:05 30 Dec 22 18:44 14.7 RFU SCM W/S BINTANG 9185
- cek- CekREST
bottom +Proker
-PREPARE
-- TIME
drop final
otwvoltagecheck
lokasiHEEM
PART
Action
guard T/M & eng PS
FUI
battery - pak aris
-Cleaning Cek &
-+Retorque
- Check-Cek-repair
cek
drop groundtestbuttom
front
QA1
kebocoran
voltage
flexible drive guard
battery
muffler shaftT/M PAK Wahyu adi
5 P HM4003R DT1756 WO PLANT 11329 11329 30 Dec 22 05:42 PS 03 - pressure AC 30 Dec 22 05:42 30 Dec 22 18:44 13.0 RFU SCM W/S BINTANG 9185
--cleaning
+Cek all bottom remove -- Check
Cek buttom
guardREST
Action
-pressure
-hose
Do RFU IIguar
FUI
return
PS
drain
E/G
TIME3.Action
ACbrake
hole
QA1 & - pak aris
-adjust
Cek - dropadjust
BCS valve
:alternator
voltage batt GL:Pak Budiyanto
6 P HM4003R DT1763 WO PLANT 15538 15538 30 Dec 22 07:45 OIL TRANSMISSION LEAK --install
--Check
Check Hose
v-belt
all return
drain hole
lightning brake 30 Dec 22 09:45 30 Dec 22 16:07 8.4 RFU USM TS-HYDROS 3000
-
+Repair replace- hose
Samplingworkgrease lamp
all rear (1pcs)
Oil suspensi MECH:Wahyudi,Wantu
- replace add
-Check
Checkv- oilbelt transmissi
all lightning
compressor line ac PAK Wahyu adi
7 P HM4003R DT1715 KP424654 19629 19629 30 Dec 22 08:30 HOSE BREAK LEAK --adjust
+Replace
- Cek
-- add
autolube
parkinglampu
pressure
final check brake
AC tyre 30 Dec 22 10:30 30 Dec 22 10:20 1.8 RFU USM WS PEDAYAK 3000
- Cek- bottom
Check autolube
grease
guard T/M linen E/G - pak aris
- Cek ---Check
+Replace
bottom-
add Cleaning lampu
drain
groundtest
guard
air tambahunitmundur
hole
T/M n E/G PAK Wahyu adi
8 P HM4003R DT1758 WO PLANT 774 774 30 Dec 22 09:55 PS 750 - Check- Cleaningflexiblearea mufler 30 Dec 22 11:55 30 Dec 22 15:46 5.9 RFU SCM WS PEDAYAK 9190
+Repair
- Check
- Check no
- Action lambung
all lighting
-flexible
RFU
leveling oilmufler rear - pak aris
- Administrasi - and PS lll
Reporting GL: PAKPAK Wahyu adimECH: -
BUDIYANTO
9 P HM4003R DT1633 WO PLANT 25273 25273 30 Dec 22 11:00 PS 250 - Check+Cleaning
--cleaning
Actionautolube PS tools
unitlll line 30 Dec 22 13:00 30 Dec 22 17:02 6.0 RFU SCM WS PEDAYAK 9190
- PAP Oil engine & hyd
- Cek - PAP +Cleaning
bottom guard
Oilgrease
engine bays
T/M
& hyd n E/G PAK- Ibnu
pak aris
WahyuS adi
10 P HM4003R DT1758 WO PLANT 780 780 30 Dec 22 09:55 PS 03 - -Add cleaning areatank 30 Dec 22 11:55 30 Dec 22 16:30 6.6 RFU SCM - Agung S WS PEDAYAK 9185
- Check
- Add -+Reporting
flexible
grease
reporting mufler
tank - pak aris, - Chandra (C)
- Greasing manual shaft & spider
- Pengecekan
-Replace Retorque bolt shaft -- Amrin
Harjo
11 P HM4002FT DT1549 WO PLANT 46304 46304 30 Dec 22 08:00 PS 250 - Cleaningbulp bottom clearence guardlamp T/M 30 Dec 22 10:00 30 Dec 22 18:42 10.7 RFU SCM W/S BINTANG 9185
Action PS-Repair
250 hRest mounting time- Replacegrease tank battery Rear - Rivaldi
- Final -P5M Check Pak eko tanto, Pak jhoi, Pak
12 P HM4002 DT1559 KP424687 55766 55766 30 Dec 22 18:59 PARKING BRAKE ABNORMAL - Replacepiping
-Retorque terminal water batterypump 30 Dec 22 22:00 30 Dec 22 22:20 3.4 RFU USM - Doni TS CADAS 7200
- Groundtool
-Prepare test &unit
JSA bowo
- Replace Bulb lampu kota - Dedi autolube
13 P HM4003R DT1763 WO PLANT 15542 15542 30 Dec 22 21:37 REPAIR HYDRAULIC ELECTRIC & AC -- Cleaning
Greasing manual
Unit, QA1*tools shaft& area & spider
kerja 30 Dec 22 23:00 31 Dec 22 04:06 6.5 RFU SCM
Pak eko tanto, Pak jhoi, Pak
TS CADAS 7600
- Repair
- Cleaning bottom guard T/M handle pintu RH& E/G bowo
- Install cover - P5M
Cuci unit pintu RH
handle Pak eko tanto, Pak jhoi, Pak
14 P HM4003 DT1744 KP424698 11512 11512 30 Dec 22 22:00 RADIATOR LEAK - Final Check 30 Dec 22 22:59 30 Dec 22 22:59 1.0 RFU USM SAMRAT 1000
- Replace - PrepareAction
boggywhip administrasi
Ps 250 & bendera bowo
- Ground test unit
- Pengecekan - Prepare
kebocoranAction Spare FUI
finalparts Drivekerja
no.1 (P2) Pak eko tanto, Pak jhoi, Pak
15 P HM4003R DT1698 KP424697 22505.2 22505.2 30 Dec 22 21:47 ERROR 03 - Cleaning Unit, tools & area 31 Dec 22 01:00 31 Dec 22 02:50 5.1 RFU USM WS PEDAYAK 7000
- Cek
- adjust QA1
droprefrigerant
voltage battery AC bowo
Action
- PAP FUI Pak eko tanto, Pak jhoi, Pak
16 P HM4003R DT1759 KP424688 16697 16697 30 Dec 22 22:57 HOSE GREASE LOOSE - Repair handle pintu RH 31 Dec 22 01:00 30 Dec 22 23:56 1.0 RFU USM WS PEDAYAK 8000
#otw -kenari#jamper
- Cek - Cek drop battery#
voltage
pressure AC move
batt ws mini bowo
Retorque bolt mounting tanker Pak eko tanto, Pak jhoi, Pak
17 P HM4003R DT1700 KP424679 21713 21713 30 Dec 22 16:20 CAN'T START pedayak# replace - Check
- Cleaning battery#
Sampling drain
area replace
All oiltankalternator#
hole
fuel 30 Dec 22 18:20 31 Dec 22 03:29 11.2 RFU USM KENARI 7000
bowo
Ground - Check
Cek test#
- Groundpressure Completed
all lighting
test AC Pak eko tanto, Pak jhoi, Pak
18 P HM4003R DT1681 WO PLANT 21306 21306 30 Dec 22 17:00 PS 250 - Manual greasing All shaft 30 Dec 22 19:00 31 Dec 22 04:23 11.4 RFU SCM WS BINTANG 9190
#otw tamrin#cek
# p5m# prepare - Checkkebocoran
-tools autolube
Leveling # cekOil air line
radiator#
kelengkapan replace
part bowo
- Cek - Check
bottom drain
guard hole
T/M nGround
E/G Pak eko tanto, Pak jhoi, Pak
19 P HM4003 DT1744 WO PLANT 11512 11512 30 Dec 22 22:59 REPAIR HYDRAULIC ELECTRIC & AC hose heater#
rehose# order refill
hose water
hydraulic
- Cleaning Unit & coolant# pump#
Bays installtest#
hose 31 Dec 22 02:30 31 Dec 22 04:55 5.9 RFU SCM SAMRAT 7600
bowo
hydraulic pump--Check #Check all lightning
flexible
-Completed
prepare Reporting install muflertm to unit# adjust Pak eko tanto, Pak jhoi, Pak
20 P HM4003R DT1760 WO PLANT 21281 21281 31 Dec 22 16:45 PS 01 -Greasing
sling rantai# -
manualREST Check
install tmTIME- autolube
to unitReplace line
# reposisi hose output
lubang 31 Dec 22 04:23 31 Dec 22 04:23 -12.4 RFU SCM WS BINTANG 9190
bowo
HM4003R mounting-REST Cek bottom
trunion brakeguard
rear# pumpT/Mwirring
reposisi n E/G
brake harness#
Pak eko tanto, Pak jhoi, Pak
21 P DT1666 KP424691 1686.5 1686.5 30 Dec 22 20:39 OIL BRAKE LEAK
- Replace
reposisi bracket -TIMEReplace
Checkhoseflexible
mounting stering
hosetube
valve 5pcs
differential front# install
30 Dec 22 22:00 31 Dec 22 06:10 9.5 RFU USM
bowo
HARTAB 7200
- bolt
re-oring conector
- Replace hose brake pumpRest
demand balvetime-cleaning
5pcs Conti Pak eko tanto, Pak jhoi, Pak
22 P HM4003R DT1626 00806977 38552 27 Dec 22 08:45 PS 02 OVH DIFF FRONT & TM mounting trunion rearrest time# install bolt 31 Dec 22 18:00 ### SCM W/S BINTANG 9185
buttom
- Levelling guar
oli T/M E/G & HYD nue bowo
mounting differential feont# order bolt mounting Conti Pak eko tanto, Pak jhoi, Pak
23 P HM4003R DT1696 SAFTY 17921 27 Dec 22 07:00 VESSEL REBAH - -replace
Adjust vclereance
Remove belt ac
differential # retorque bolt mounting trunion rear#hoist
& lamp (1pcs)
alternator 28 Dec 22 00:00 ### ICM TSSP KUTUKAMBING 6500
nue bowo
install - greasing
bolt mounting - Cleaning manual
braket Unit
trunionall pin front frame
rh & lh & Conti Pak eko tanto, Pak jhoi, Pak
24 P HM4002 DT1613 WO PLANT 47369 29 Dec 22 09:30 REPAIR CHASIS Welding chasis
-repair frame,
hose WeldingGrease chasis
rear 29 Dec 22 23:00 ### SCM WS BINTANG 6500
retorque bolt # -retorque
Cleaning boltarea mounting trunion nue bowo
- Cleaning unit Conti Pak eko tanto, Pak jhoi, Pak SIMPANG
25 P HM4002FT DT1590 WO PLANT 44302 30 Dec 22 14:40 OIL TRANSMISI LEAK front# retorqueReplace bolt mounting brake pump differential front rh 30 Dec 22 16:40 ### USM 3000
nue bowo FLAMINGGO
& lh# cleaning -tool Cleaning
# housekeping area area kerja Conti Pak eko tanto, Pak jhoi, Pak
26 P HM4003R DT1627 KP424685 36728 31 Dec 22 03:15 OIL HYD LEAK - Administrasi
Replace coupling and Reporting h/y 31 Dec 22 06:00 ### USM WS PEDAYAK 7600
nue bowo
Conti Pak eko tanto, Pak jhoi, Pak
27 P HM4003R DT1667 00807265 17836 31 Dec 22 04:47 PS 03 move to ws bintang ,-washingP5M unit, job panding 31 Dec 22 14:30 ### SCM WS BINTANG 9190
nue bowo
- Krida area workshop Conti Pak eko tanto, Pak jhoi, Pak
28 P HM4003R DT1755 00808939 1027 31 Dec 22 04:36 PS 01 move to ws bintang , washing unit, job panding 31 Dec 22 16:00 ### SCM WS BINTANG 919
- Creat JSA nue bowo
- Prepare, washing
tool andunit,
part job panding Conti Pak eko tanto, Pak jhoi, Pak
29 P HM4003 DT1747 00807562 10057 31 Dec 22 04:44 PS 04 move to ws bintang 31 Dec 22 16:00 ### SCM WS BINTANG 9180
- prepare Bolot PAP-Take data PPM E/G nue bowo
Conti Pak eko tanto, Pak jhoi, Pak
29 P HM4002 DT1610 WO CCR 50329 31 Dec 22 05:56 ERROR 03 -Take sample PAP 31 Dec 22 09:00 ### USM K-WEST 7000
nue bowo
-Action PS I (250) - WINARNO
-Retorgue bolt GR,WLterminal bateray - SUTOMO
1 P GD825A2 GR507 00807565 40011 40011 29 Dec 22 09:31 PS 04 -Repair lampu kombinasi LH 29 Dec 22 21:31 30 Dec 22 17:25 31.9 RFU SCM - DIMAS S WS BINTANG 9175
-Adjust tension fan belt E/G - RHOFIQ
2 P GD825A2 GR477 00806464 31356 31356 29 Dec 22 23:50 PS 01 -Leveling oil tandemREST TIME-Retorque bolt lock 30 Dec 22 09:50 30 Dec 22 15:47 15.9 RFU SCM pak pak wahyu
- EKOadi, pak aris W/S BINTANG 9190
3 P GD825A2 GR507 WO PLANT 40013 40013 30 Dec 22 06:00 PS04 # Ground test center
trouble# pinRemove
front axlecover transmisi# 30 Dec 22 16:00 30 Dec 22 09:38 3.6 RFU SCM pak pak wahyu adi, pak aris W/S BINTANG 9190
-Reposisi
add oil cover lock
t/m# Washing pin knuckle
selenoid RH/LHarea#
c/v transmisi
4 P GD825A2 GR380 WO PLANT 68417 68417 30 Dec 22 07:30 ADD OIL TRANSMISI -Install
Remove selenoid tutup cover
CleaningacAC
valve fw#pressureValve selenoid valve 30 Dec 22 09:30 30 Dec 22 10:11 2.7 RFU USM pak pak wahyu adi, pak aris WS PEDAYAK 9175
-pengecekan
-Repairt/m#
fw# check pressure motor Grease tank
MTsadd
ac oil hyd# Ground test#
5 P CAT14M3 GR566 WO PLANT 11020 11020 30 Dec 22 09:45 REPAIR AC # Ground-Cabut boltCompleted
test trouble#
Repair
lockadd
wiring
plate upper
grease
to compressor
LH add oil
tank#
ac
30 Dec 22 11:45 30 Dec 22 11:36 1.9 RFU SCM pak pak wahyu adi, pak aris WS BINTANG 8000
-Install guide blade upper GL:Pak Budiyanto MECH:Faidhil
hyd# adjust v Replace
belt ac#filter
install nutRH/LH
fuel and wahser
6 P GD825A2 GR513 WO PLANT 47259 47259 30 Dec 22 15:10 ADD OIL HYDROLIC 30 Dec 22 17:00 30 Dec 22 16:35 1.4 RFU USM - tri WS PEDAYAK 3000
mounting- Welding
compressor lockac#
plate upperfuel
replace RH/LH
pro# add oil
-Cleaning radiator - ishaq
Pak eko tanto, Pak jhoi, Pak
7 P GD825A2 GR536 WO PLANT 29349 29349 30 Dec 22 21:24 REPLACE CUTTING EDGE t/m# Ground test# Completed 31 Dec 22 02:26 31 Dec 22 02:26 5.0 RFU SCM W/S BINTANG 6000
-Cleaning unit bowo
Conti Pak eko tanto, Pak jhoi, Pak
8 P GD825A2 GR513 WO PLANT 47280 31 Dec 22 01:15 PS 01 -Cleaning area ??? ### SCM W/S BINTANG 9190
nue bowo
Conti Pak eko tanto, Pak jhoi, Pak
9 P GD825A2 GR418 WO PLANT 65534 30 Dec 22 15:00 PS 500 ??? ### SCM WS BINTANG 9185
nue bowo

Page 3
31

31 December 2022 SHIFT I: HENDRI


p5m dan bagi job, -P5M
-prepare tools
SHIFT II: BUDI
-membuat JSA
EQ. -unit turun dari lowboy B/D COM
B/D
CA EGI C/N WO NUMBER HM B/D HM RFU DATE TIME IN DESC. OF TROUBLE TODAY -washing ACTIVITIES
unit ESTIMASI RFU DATE TIME OUT Be STAT PIC REMARK P
TYPE
T -pasang hangar boogey US CODE
-remove track roller P5M RH & LH no.6
TRACK Prepare
-remove DOZER
toollink
track
Prepare part
-disconnect track link
1 P D375A6R DZ547 00807035 41797 41797 29 Dec 22 04:30 PS 03 + REPLACE TRACK LINK Membuat JSAE/G 31 Dec 22 05:00 31 Dec 22 05:00 48.5 RFU SCM Pak wiwik, Pak sutrisno W/S BINTANG 9185
move to unit, -remove
sholat isa,filter demarkaso area, cek
Krida WorkshopEscord -Rest time DZ1116 to Pattimura
2 P D85ESS2 DZ144 WO PLANT 1841 1841 30 Dec 22 15:20 REPAIR ENGINE radiator, cek keboxran-move to oilunit
engine, grountest, 31 Dec 22 05:00 31 Dec 22 05:00 13.7 RFU SCM Pak wiwik, Pak sutrisno GERDAS 1000
Rest
-sholat TimeWaiting
jumat-remove Water Tank
filter fuel
restime, contineu,
-reposisi track grountest,
link AHMAD YANI
3 P D155A6R DZ1216 KP424732 28348 28348 31 Dec 22 07:35 TRACK LOSE Washing
-sampling all oil Unit 31 Dec 22 09:00 31 Dec 22 09:00 1.4 RFU USM Pak slamet,
Pak wiwik,Pak
Pakyasir, David
sutrisno 6000
-reposisi
Congkel2
p5m dan Area carrier roller
Undercarriage Doni BIDADARI
-drain oilbagi job,- P5M
E/G,F/D,T/M,
4 P D375A6R DZ571 WO PLANT 28759 28759 31 Dec 22 09:42 PIN LIFT CYL LOOSE -repair- Prepare
CGBSholat shaft carrier
asharContinuetool roller CGB 30 Dec 22 18:03 31 Dec 22 18:03 8.3 RFU USM Pak wiwik, Pak sutrisno
Herman DISP KENARI 8000
-replace filter- FUEL,OIL,T/M,HIDROLIK
parkir unit
- -isi Cleaning
BuatoliJSA -instal
-connectiontanahpin bekas
lift
trackcyllink
Dozer rh dan lh Wahyu
5 P D155A6R DZ1116 WO PLANT 69311 69311 31 Dec 22 01:00 REPAIR UNDERCARRIAGE F/D,E/G,- - ceklasTrobel
drain plug Steering 01 Jan 23 03:27 01 Jan 23 03:27 26.5 RFU SCM PATIMURA 6000
-torque dan -ground
Reposisi
tambaharea test masterlink
Unit
drajat , Pak Sutrisno
- Cleaning
- Install Muffler kerja
6 P D375A6R DZ522 WO PLANT 52060 52060 31 Dec 22 16:07 REPAIR ENGINE Disconnect
-remove -rfu
Track
stand Link
unit LH 31 Dec 22 23:00 31 Dec 22 23:00 6.9 RFU SCM Pak Wiwik
Pak slamet, Pak yasir DISP 3 JARI 1000
- -Welding
Remove
-instal
cleaning
idler
cover+
tools
Muffler
CabinlhLH
pivot Pak Misgiyarto, -pras
7 P D155A6R DZ1147 WO PLANT 64516 64516 31 Dec 22 19:59 TRACK LOSE - Grondtes
Cleaning
-leveling tool
oil hydraulik 31 Dec 22 21:55 31 Dec 22 21:55 1.9 RFU USM Pak slamet,
-ajibPak yasir WS PEDAYAK 6000
Cleaning
-isi oil - RFUrh
pivot Baysdan lh
8 P D155A6R DZ1106 00803953 64746 64746 27 Dec 22 13:00 OVERHAUL UNDERCARRIAGE 01 Jan 23 05:36 01 Jan 23 05:36 112.6 RFU SCM Pak slamet, Pak yasir W/S BINTANG 6000
-prepare area untuk Pending Job Rest time - Rest
instal blade-
- Parkir unit
9 P D85ESS2 DZ142 WO PLANT 25320 25320 31 Dec 22 11:15 REPAIR HYD time -replace hose -tilt Reporting
Cek di Trobel
straigh frame dan trunion 01 Jan 23 06:00 01 Jan 23 06:00 18.8 RFU SCM Pak slamet, Pak yasir WS BINTANG 7600
-instal
- Cekstraighcompresor frame
10 P D155A6R DZ1216 WO PLANT 28438 28438 31 Dec 22 09:00 REPAIR ELETRIK SYSTEM move to unit,cylinder
-instal clening
- Replace track
lift bladeframe
relay rh ,dan
adjus
lh track , 01 Jan 23 05:36 01 Jan 23 05:36 20.6 RFU SCM Pak slamet, Pak yasir BIDADARI 7000
grountest, evakuasi
- Replace filter AC job panding
- area
krida amana,
area
11 P D155A6R DZ1157 KP424807 43682 43682 01 Jan 23 03:09 AC HOT 01 Jan 23 06:00 01 Jan 23 06:00 2.9 RFU USM Pak slamet, Pak yasir SINAI 8500
- cleaning
- Install termostat tanahmanual
12 P D155A6R DZ1217 KP424809 28875 28875 01 Jan 23 04:20 HOSE TILT LEAK - cleaning-p5m tool
- Grondte 01 Jan 23 06:00 01 Jan 23 06:00 1.7 RFU SCM Pak slamet, Pak yasir WS PEDAYAK 8500
- cleaning
-prepare partarea
- RFU & tool
TRACK ✓ Travel
-buang✓waste- EXCAVATOR
to unit
menujuunit lokasi
✓ Travel
Reposisi to unit
1 P PC8508R1 EX2361 WO PLANT 26925 26925 27 Dec 22 09:27 REPAIR TRACK ✓ Reposisi -unit
buatdijasa tempat aman 31 Dec 22 12:00 31 Dec 22 12:00 98.5 RFU SCM Pak triyono, Pak hartoyo PEDAYAK WEST 6000
✓ Cek low power
✓ Cek - sosialisasi
error jasa
✓ Cek fuellow power
sistem
2 P PC1250SP8 EX1128 WO PLANT 27044 27044 31 Dec 22 10:30 REPAIR HYD + LOW POWER - Repaire hosesistemGrease 31 Dec 22 13:00 31 Dec 22 11:50 1.3 RFU USM Pak woyo, Pak haryadi PCB 7600
✓✓Replace
Cek fuel barel pcv Pak Woyo, Pak Riski, Pak
- greassing
✓ Repair wairing all attachment
3 P PC1250SP8 EX1170 WO PLANT 23762 23762 31 Dec 22 13:20 REPAIR HYD ✓ Cleaning connector (wiring
connector RPS pcv putus)
31 Dec 22 15:45 31 Dec 22 15:45 2.4 RFU USM Haryadi, MP : Ketut, Ari p, KARTINI 7600
✓- washing unit
✓ Replace
Groundtest RPS
Khanifan
4 P PC1250SP8 EX1105 WO PLANT 56201 56201 31 Dec 22 14:40 OIL HYD LEAK - adjust
✓ Replace track LH
fuel pro 31 Dec 22 16:25 31 Dec 22 16:25 1.7 RFU USM Pak woyo, Pak haryadi JL CENDRWASIH 7600
✓ RFU
- Ground
✓ Cleaning watertestsaparator
unit
5 P PC1250SP8 EX1161 00808335 25905 25905 31 Dec 22 06:05 PS 04 - RfuREST
✓ Groundtest TIME-p5m 01 Jan 23 05:16 01 Jan 23 05:16 23.2 RFU SCM Pak triyono, Pak hartoyo KUTILANG 9180
traveling timereplacement
-prepare filter,air cleanerrepair
✓ part
RFU & tool
6 P PC8508R1 EX2402 WO PLANT 771 771 31 Dec 22 14:15 PS 03 autolube,cleaing
-buang strainer
waste-viewwashing
menuju lokasi unit,cleaning 01 Jan 23 01:20 01 Jan 23 01:20 11.1 RFU SCM Pak woyo, Pak haryadi TS PEDAYAK 9190
under carriage Rest -timefinal buat jasa check,gound test rfu
7 P EX12006 EX1304 WO PLANT 18193.3 18193.3 01 Jan 23 01:00 REPAIR TRACK 01 Jan 23 05:00 01 Jan 23 05:16 4.3 RFU SCM Pak triyono, Pak hartoyo KARAKUM 6000
- sosialisasi jasa
8 P PC400LC-8 EX292 KP424802 5280 5280 01 Jan 23 01:25 CANT START - Repaire hose Grease 01 Jan 23 05:42 01 Jan 23 05:42 4.3 RFU USM Pak triyono, Pak hartoyo PERSIB 1000
- greassing all attachment Conti
9 P PC400LC-8 EX291 WO PLANT 4656 25 Dec 22 09:00 REPAIR FINAL DRIVE - washing unit ??? ### SCM Pak triyono, Pak hartoyo PDY WEST 6000
nue
- adjust track LH Conti
10 P PC400LC-8 EX292 00808021 5280 01 Jan 23 05:41 PS 1 ??? ### SCM Pak triyono, Pak hartoyo PERSIB 9190
- Ground test unit nue
Conti
11 P PC1250SP8 EX1168 WO CCR 23433 01 Jan 23 05:55 ERROR 03 - RfuRest time ??? ### USM Pak triyono, Pak hartoyo BANGAU 7000
nue

Page 4
Naikin DZ 1215 ke Lowboy
01
Turunin DZ1215 di pelangi
01 January 2023 SHIFT I:waiting
MEMET DZ 1090 dari pelangi SHIFT II: BUDI
Naikin DZ 1090 ke Lowboy
Escort dari Bintang ke Pedayak
EQ. B/D COM
Tukar unit DZ 1090 ke DZ 1118 B/D
CA EGI C/N WO NUMBER HM B/D HM RFU DATE TIME IN DESC. OF TROUBLE TODAY ACTIVITIES ESTIMASI RFU DATE TIME OUT Be STAT PIC REMARK P
move to pedayak ke bintangREST TIME,Congkel TYPE
T US CODE
manual -move undercarriage
to unit
-remove washing cover unit tilt cyl
TRACK QA
P5M 1 DOZER
-Move -replace to pedayak hose tiltselatan
cyl
Prepare PPM tool -pras
1 P D155A6R DZ1217 KP424827 28901 28901 01 Jan 23 08:14 OIL CYL LEAK -instal
- replacearea cover
lubricatorcylLH
P5M tilt 01 Jan 23 11:00 01 Jan 23 09:23 1.1 RFU USM PEDAYAK SELATAN 7600
cleanning Prepare kerja~ part P5M oli,ground -ajib
move lokasi,cek -ground
Prepare
kebocoran
- adjustrack test
tool
oliLHtm,add -pras
2 P D375A6R DZ519 WO PLANT 18890 18890 01 Jan 23 09:00 REAPIR TRACK ROLLER -rfureposisi ~ Prepare Pembuatan
unitreposisi Preparepart, tools
pin
part dan Jsa
jsaarmwelding pin 01 Jan 23 12:00 01 Jan 23 18:23 9.4 RFU SCM DISP K WEST 1000
- cek oli test
EG-TM-Hyd -ajib
~ Sholat
armrestwelding - parkir
isya~
sosialisasi
Move unit
reposisi
pintoarmwelding JSA
lokasi unit pin arm
3 P D375A6R DZ500 WO PLANT 62697 62697 01 Jan 23 17:47 REPAIR ENGINE SYSTEM -Pembuatan
tambah
~ - cek
action oli
Trobel ps
jsa
hyd
2 02 Jan 23 04:31 02 Jan 23 04:31 10.7 RFU USM Pak slamet, Pak yasir SINAI LUMPR 1000
Prepare Check saranaTravel
sosialisasiwiring egJSAstop to unit
- Remove~ - cekDrain airGrill
oilradiatorradiator
engine
4 P D85ESS2 DZ143 WO PLANT 16252 16252 01 Jan 23 20:51 REPAIR ENGINE SYSTEM Travel
Prepare unit
Check ke
fuel
saranaTravel tempat
sistem aman
to unit 02 Jan 23 00:31 02 Jan 23 00:31 3.7 RFU SCM Pak slamet, Pak yasir PCB 1000
Travel ~Repair --unit
Cek
resample grontest
Reposisi
Parkir kebocoran
switch
ke oil unit
unit
unit
tempat eg engine
stopaman
D375A6R -Reposisi - RFU
5 P DZ566 KP424887 28190 28190 02 Jan 23 02:20 RADIATOR LEAK ~ replace -Replace
Cek
Grond main
QA1 Trobel hose
test fuel filter
unit 02 Jan 23 04:31 02 Jan 23 04:31 2.2 RFU USM Pak slamet, Pak yasir DISP DISRUP 1000
~ Check
replace - -move
Cek - voltage
Grondtes
filter
E/G to oil
QA1speed
unit engine
battery Man Power
6 P D375A6R DZ571 KP424899 28794 28794 02 Jan 23 04:37 LOW POWER -cek
- Install oileror Grill 02 Jan 23 05:28 02 Jan 23 05:28 0.9 RFU USM Pak slamet, Pak yasir J3 1000
Check Check -~pressure
Cek refil Air
voltage engine
grease
cleaner battery pump Sujanto
-replace
~ replace -pressure
leveling
Check air
filter
- Grondtes cleaner
oiltransmisi
vbelt hyd pump
7 P D375A6R DZ519 KP424898 48906 48906 02 Jan 23 04:30 LOW POWER Check grease 02 Jan 23 06:15 02 Jan 23 06:15 1.7 RFU USM Pak slamet,
AdityaPak yasir KWEST 1000
~ -cek cekGreasing oli
all -
Check vbelt
+ coolent
RFU
level oil
All F/D
-ground test rfu Conti Dodik
8 P D155A6R DZ1118 00808020 65481 01 Jan 23 10:34 PS 02 ~ resampleTake oil F/D~ sample
Greasing remove All operator seat
engine ??? ### SCM W/S BINTANG 9185
nue Riski
~ remove TakeAction cover
sampleevaporator
psengine1 ac
TRACK EXCAVATOR Budi, : yanu
~ disconect Replace Action ps 1 line
fuel hose
pro ac
Suryadi
reposisi Remove~unitreposisi
removeReplace cover pin armwelding
evaporator
bawah
fuel proengine ac pin
1 P PC1250SP8 EX1105 WO PLANT 56203 56203 01 Jan 23 10:00 WELDING PIN ARM 01 Jan 23 15:00 01 Jan 23 15:40 5.7 RFU SCM Pak haryadi, Pak woyo
A. Iwan FLAMINGGO 8000
armrestwelding
Remove~ remove
Remove pincover
cover
cover armwelding
control
bawah baterai valve
engine pin arm
2 P PC400LC-8 EX292 00808021 5280 5280 01 Jan 23 05:41 PS 1 ~ Remove
Reoring remove plug cover
punggung
cover watter
control sparator
cv 5
valve spool 01 Jan 23 12:00 01 Jan 23 11:52 6.2 RFU SCM Pak triyono, Pak hartoyo PERSIB 9190
reposisi unit QA1 Check voltage battery Check
Repair
Reoring ~plug
kebocora remove - plug
P5m
punggung fuelcover tankcv line filter All
5 Greasing
spool
3 P PC1250SP8 EX1170 00808017 23773 23773 01 Jan 23 09:18 PS 03 pressure grease - pump
Otw wsCheckpedayak vbelt 02 Jan 23 04:35 02 Jan 23 04:35 19.3 RFU SCM Pak haryadi, Pak woyo KARTINI 9185
~ Repair
removekebocora Ecmv Add - SteeringRest
drum
Prepare plug grease
JSA
cover time~ install
line filter
Take sample - -prepare engine Action
administrasi ps &1 Replace
sparebox partfuel pro
Cleaning
Prepare Add evaporator filtergrease
spareparts
drum ac ac&dalamtool
4 P PC8508R1 EX2361 WO PLANT 26943 26943 01 Jan 23 09:27 REPAIR TRACK Remove cover bawah - Krida engine workshop Remove cover control 02 Jan 23 03:55 02 Jan 23 03:55 18.5 RFU SCM Pak haryadi, Pak woyo GARUDA PEDAYAK 6000
~ completed
Replace Cleaning filter
- punggung
Action cover
ac luarRest
filter cover
FUIdalam
ac evap
Time
valve Reoring plug -dropWaiting unit cv 5 spool Repair
5 P EX12006 EX1304 KP424875 18205 18205 01 Jan 23 21:10 TRACK ABNORMAL Replace ~-install
replace
Replace Cek hose filter 2x
sensor Ecmv
discharge
ac main
voltage
luarReststeering
fan
pump
batt pump
Time 01 Jan 23 22:00 01 Jan 23 22:00 0.8 RFU USM Pak karim, Pak hartoyo K27 6000
kebocora plug REST cover
TIME, line
-Action filter Ps Add 250 drum grease
waiting ~ ppm
replace
final Cleaning -pressure
drivewaiting Sampling
teeth -bawah
P5M steering
bucketRest oilengine
final all brake
Time
drivewaiting final Conti
6 P PC400LC-8 EX291 WO PLANT 4656 25 Dec 22 09:00 REPAIR FINAL DRIVE Cleaning filter ac dalam
-Action Replace
FUItools filter ac luar ??? ### SCM Pak triyono, Pak hartoyo PDY WEST 6000
~ replace
Replace - Prepare
Cleaning
-hosecek pilot jsa
boom
pressure
discharge
drive filter
& steering
food
ACfan pump nue
- Prepare- Cleaning spare
Manual ~ install
Replace part - Ppm
greasing
- P5mfuel
- Waiting
hose tank
pcv
All shaft ebs pump
ARTICULATED bawah engine
DT,WT,FT
-Check
~ install Replace-- Check-cover
Remove hole fuel
Prepare water
drain filter
watter
ebs JSA rackor
sparator
pump
hole Ibnu
Cleaning boom food
--Sampling
Prepare~-completed oil- all
- spareparts
Cleaning
Check Instal
P5M
hydraulic
ebs fuel
cabin &tank
pump
lightning & engine
tool box Tri SIMPANG
1 P HM4002FT DT1590 WO PLANT 44302 44302 30 Dec 22 14:40 OIL TRANSMISI LEAK Replace
- Prepare hose Tools pcv 30 Dec 22 17:40 30 Dec 22 17:40 3.0 RFU USM - Apip F (C) 3000
- -Adjust ~
Adjust
Add
Check replace
-Cleaning V-belt
relief
Oilautolube fuel
hydraulic Altenator
pro
hydraulic
Unit line Agung FLAMINGGO
Check
- Prepare hole
JSA- water
ACTION pump service - Wahyu Budi
2 P HM4002FT DT1546 KP424805 52662 52662 01 Jan 23 02:30 PENGISIAN FUEL LAMBAT - cek ~ -replace -Cleaning
bottom Replace
Washing shank
- Action guardV-belt
area protector
Unit T/M
FUIfuel AC
flowrate & eng 01 Jan 23 15:12 01 Jan 23 15:12 12.7 RFU USM Wantu
Adi RB W/S BINTANG 1000
Cleaning
--replace cabin
filter - Farhan
REST ~Completed
vacum&
TIME,-
Check Adjust Leveling
flexibleV-belt
adjust
Cover oil AC
freon ac
hydaulic
Cover
muffler - Restu
3 P HM4003R DT1711 WO PLANT 19527 19527 01 Jan 23 03:26 REPAIR STARTING SYSTEM - -Cleaning
Cek Adddrop Oil voltage
hydraulic
bottom batt
guard 01 Jan 23 17:29 01 Jan 23 17:29 14.1 RFU SCM W/S BINTANG 7000
- Repair --~-add
Cleaning Cleaning
Cekkatcher
claim
Washing -allDo PS
work
greas
Radiator
radiator
piping
Tools II&
Unit
tanklamp transfer
area - Adi P
4 P HM4003R DT1630 KP424811 22175 22175 01 Jan 23 04:55 PROPELLER SHAFT WEAR
remove propeller - ~-shaft,
cleaning
Completed
Greasing
remove
--PPM Add
Groundtest replace
box
grease
lampu
engine
Cover
manual spidewr
lotto
cabin
Cover joint & bolt
01 Jan 23 15:41 01 Jan 23 15:41 10.8 RFU USM - wahyudi hs CADAS 8000
- cleaning
- Replace air cleaner
Accumulator
joint, dan filter3 pcsac
-greasingREST Cleaning -~-Samplingsholat
Cleaning
install RFU subuh
bendera
Tools
TIME,ACTION
unit
oil
& all area baklog Wahyu S
5 P HM4002 DT1559 WO PLANT 55780 55780 01 Jan 23 05:19 PS 03 - Retorque
-- ~ cleaning
replace
Manual - TravelMounting
-Groundtest
Create
Cleaning
hose- P5M
greasing area
kwest JSA rubber
area
accumulator bays
All shaft spring 01 Jan 23 17:00 01 Jan 23 17:00 11.7 RFU SCM -raharjo
- Hanif W/S BINTANG 9190
-replace hose ~o-ring stering
- cleaning
Cleaning tools Valve Unit
&
tools dan flow am
Part
- Administrasi
- replace - -PrepareCheck Reporting and
administrasi
hose
all
RFU reporting
accumulator
lightning -vikri
- Nurhayat
6 P HM4003R DT1637 00808479 23561 23561 01 Jan 23 05:19 PS 02 -adjus ~Travel V-Belt
-pending
Jack Kabincomp
job. ac 01 Jan 23 17:00 01 Jan 23 16:09 10.8 RFU SCM W/S BINTANG 9185
- Prepare Spare
- -replace
-Leveling
Check paartAction
spider
autolube
kwest front PSLH1 250 hm
line - Cairil
- Eka A
- Pengecekan oil transmisi
kebocoran
7 P HM4003R DT1725 WO PLANT 14935 14935 01 Jan 23 08:12 OIL T/M LEAK Action - cek fuiREST -bottom
replace TIME,-
Reporting bolt
guard ReplaceT/M &V.belt
spider eng AC 01 Jan 23 12:00 01 Jan 23 16:58 8.8 RFU SCM - Tarnos
- Wantu WS PEDAYAK 3000
- -adjus
Replace Prepare V-Belt
hose jsa& alternator
block tool
transmisi Irvan
- Check flexible - -Adjustinstall
mufflerREST belt
nipple Alternator
spider
TIME,- replace oring - -Agung
-adjus -bolt cek fire
Turun supresion
trouble
Kabin Diki
8 P HM4003R DT1719 00808953 18254 18254 01 Jan 23 08:14 PS 01 - replace-hoseReplace B/C bulp
bottom
bawah Tanki guard
vessel LH Tm 01 Jan 23 18:14 01 Jan 23 16:07 7.9 RFU SCM WS BINTANG 9190
-- Add - cek - -Create
Completted
pressure
oil
JSAAC
transmission - Asad
Eka
-Final Adjust
- replace -Check Accumulator
leveling v-belt oil ac
9 P HM4003R DT1676 WO PLANT 21230 21230 01 Jan 23 09:38 AC BNORMAL - -Ground -Prepare
adjust
-cleaning
- -cleaningtest & tools
-P5M &&final
add unit
&
Washing
unitfreonPart
check 01 Jan 23 12:00 01 Jan 23 11:12 1.6 RFU USM - Aldi
wantu WS PEDAYAK 8500
-Replace
- -Prepare
Pengecekan Reporting
Create grill
tool JSA Ac
trouble
&damage
JSA
- replace --cleaning bendera
cleaning w/s
area Agung
- Galih
10 P HM4002 DT1610 WO PLANT 50349 50349 01 Jan 23 11:05 REAPIR AC & HYD -- retoque
-Prepare
Add oil spider
-QA1* Hydraulic
tools
P5m &frontPart 01 Jan 23 17:00 01 Jan 23 17:44 6.7 RFU SCM TS K WEST 8500
-completed -ceklist
- final -P5M
reporting check
sevice & laporan - Rosyid
- replace
- Repaire kebocoran- Add hose oil
Cuci brake
transmission
unit
conetor bawah
JSA filter vesellbrake - Wahyudi
HM4003R HOSE OIL T/M LEAK -- groundtest
Create
TSSP Q KENARI
11 P DT1718 KP424837 18571 18571 01 Jan 23 13:40 - Ground
- Prepare - Leveling --Prepare
-cleaning
Action test&
Create
spareparts oliPsJSAtool
unit
final
500 & check
tranmisi tool box
01 Jan 23 16:00 01 Jan 23 15:00 1.3 RFU USM
- Rivaldi
3000
-✓ Prepare
-prepare
cleaning JSA
jsa
area
-
- -Waiting
Grond Prepare Action
test
unit- tools FUI
&Washing
Final & Part
check unit - Wahyudi
12 P HM4003R DT1730 KP424855 16111 16111 01 Jan 23 15:00 ERROR 03 adjust
-replace dump
✓ Prepare
-spider body
reporting joint posisioner,
tool front rh 01 Jan 23 15:00 01 Jan 23 15:00 0.0 RFU USM RASAMALA 3000
-✓ Cek -drop Instal saft
- voltage
PPM f/dbattery - Rivaldi
Prepare -jackPAP oli
cabin 4 derigen
13 P HM4003R DT1678 WO PLANT 21016 21016 01 Jan 23 05:48 PROPELLER LOOSE ✓- assembly
Move ws pedaya spide - QA1 tomini propellertomotor saft
ts kenari 01 Jan 23 21:20 01 Jan 23 21:20 15.5 RFU USM Pak eko tanto, Pak bowo WS PEDAYAK 8000
-replace
-instal hose fan cac
- Cek - Action FUI lh
propeller
pressure saft
AC
14 P HM4003R DT1698 00808478 22548 22548 01 Jan 23 10:33 PS 02 RestAdjust - Check -add accumulator
oil
drain f/dhole 02 Jan 23 04:51 02 Jan 23 04:51 18.3 RFU SCM Pak eko tanto, Pak bowo W/S BINTANG 9185
✓ pengecekan - Cek drop voltage
kebocoran batt
dan eror
--✓ Adjust
Check -grountes suspensi
all lighting
15 P HM4003R DT1632 KP424866 23646 23646 01 Jan 23 18:46 OIL TRANSMISI LEAK Sampling
remove oil all
hose 01 Jan 23 21:41 01 Jan 23 21:41 2.9 RFU USM Pak eko tanto, Pak bowo TS KENARI 3000
-✓Check Leveling autolube all oil line
- reoring
cek pressure conectorunit AC
16 P HM4003R DT1705 00808950 20537 20537 01 Jan 23 19:33 PS 02 Sholat
-instal
Cek bottom subuhCleaning guard T/M npump
E/G 02 Jan 23 04:54 02 Jan 23 04:54 9.3 RFU SCM Pak eko tanto, Pak bowo W/S BINTANG 9185
# P5M#✓PREPARE - Manual hose greasing
TOOLS output #bays All KELENGKAPAN
brake
CEK shaft
-✓ Check Cleaning flexible mufler
PART REHOSE# - Check
ORDERadd oil drain
3 derigen
HOSE hole
HYDRAULIC PUMP#
17 P HM4003 DT1744 WO PLANT 11541 11541 01 Jan 23 20:29 PS 02 -Greasing manualREST Reporting TIME- Replace oring 02 Jan 23 04:45 02 Jan 23 04:45 8.3 RFU SCM Pak eko tanto, Pak bowo W/S BINTANG 9185
✓ - Check
groundtest
INSTALL HOSE HYDRAULIC PUMP # PREPARE all lightning
running
18 P HM4003R DT1623 KP424877 38906 38906 01 Jan 23 22:15 DUMP ABNORMAL INSTALL adjust TM✓TO conector
-cleaning
Check
UNIT#autolube
dump filter
tool
body
ADJUST andbrake line
area RANTAI#
posisioner,
SLING 01 Jan 23 23:14 01 Jan 23 23:14 1.0 RFU USM Pak eko tanto, Pak bowo WS PEDAYAK 8000
- cek
INSTALL TM TO UNIT - Replace
bottom ✓ RFUseal
guard pintu
T/M
# REPOSISI LUBANG LH
& eng
19 P HM4002 DT1584 KP424880 37258 37258 01 Jan 23 23:24 SUSPENSI LH BROKEN MOUNTING TRUNION --reapir Replace
Check boogie, bladeready
flexible
REAR# wiper
muffler
REPOSISI WIRRING 02 Jan 23 05:45 02 Jan 23 05:45 6.3 RFU USM Pak eko tanto, Pak bowo REHAP MOD 8000
HARNESS# -REPOSISI
Replace - Dooin PSlock
BRACKET II S/T MOUNTING Conti
20 P HM4003R DT1670 WO PLANT 18545 02 Jan 23 03:52 PS 02 move to ws -bontang Levelling , washing
oli T/M & unit,
HYD job panding 02 Jan 23 17:00 ### SCM Pak eko tanto, Pak bowo W/S BINTANG 9185
DIFFERENTIAL FRONT# INSTALL BOLT MOUNTING Rest time nue
- Adjust - Adjust v belt ac & #
accumulator alternator Conti
21 P HM4003R DT1626 00806977 38552 27 Dec 22 08:45 PS 02 OVH DIFF FRONT & TM TRUNION REARREST TIME INSTALL BOLT ??? ### SCM Pak eko tanto, Pak bowo W/S BINTANG 9185
- Replace - Repair hose hose filterFEONT#grease
brake toORDER acv BOLT nue
MOUNTING DIFFERENTIAL Conti
22 P HM4003R DT1696 SAFTY 17921 27 Dec 22 07:00 VESSEL REBAH MOUNTING DIFFERENTIAL Cleaning
- cleaning - P5M unit Unit
# RETORQUE BOLT ??? ### ICM Pak eko tanto, Pak bowo TSSP KUTUKAMBING 6500
nue
MOUNTING TRUNION - Cleaning
- -cleaning
-krida
Create base
REAR# area
JSA INSTALL BOLT Conti
23 P HM4002 DT1613 WO PLANT 47369 29 Dec 22 09:30 REPAIR CHASIS repair -P5M chasis, ??? ### SCM Pak eko tanto, Pak bowo WS BINTANG 6500
MOUNTING BRAKET - Prepare --Create
reporting
TRUNION tools JSA &FRONTPart RH & LH & nue
Conti
24 P HM4003R DT1678 WO PLANT 21021.5 02 Jan 23 05:30 PS 04 RETORQUE
move to wsBOLT -- Prepare
bontang Drain# RETORQUE ,-krida
Oil tool & part
hydraulic
washing BOLT
unit, job MOUNTING
panding 02 Jan 23 17:00 ### SCM Pak eko tanto, Pak bowo W/S BINTANG 9180
- -Create
cleaning p5mjsa
- cover unit nue
TRUNION FRONT# - Remove RETORQUE airBOLTtank MOUNTING Conti
25 P HM4003R DT1700 WO PLANT 21766 02 Jan 23 05:10 PS 03 move to ws bontang
DIFFERENTIAL -Remove
-FRONT prepare
reposisi - create
RH tool
, washing
unit
& LH#
cover jsa &
in part
unit,
bays
CLEANING
baterai job panding
TOOL # 02 Jan 23 17:00 ### SCM Pak eko tanto, Pak bowo W/S BINTANG 9190
nue
- Replace -HOUSEKEPING
travel
- Remove tube - time
Action brake unit
filterPS tandem
AREA 1000
dri pedayak
transmissi KERJARH depan
GR,WL - Sutomo
--Replace
Action
- prepare
- Remove pompa transmissi strip
take wear
sample
tool & shoe
part PAP - Agus
-Replace
- congkel" - flushing
- Remove cylwashing
& ripper
airfuel tankpta unit
1 P GD825A2 GR425 00807549 67566 67566 31 Dec 22 21:27 PS 02 01 Jan 23 08:30 01 Jan 23 14:34 17.1 RFU SCM - Daeng- RikiRonal W/S BINTANG 9185
-Replace-oring rEST
Remove - proker elbow
TIME- hose input
autolube
action hydraulicfilter
QA1 transmisi -Rico BA
- -Sagita
Agus S
2 P CAT14M3 GR566 00808012 11052 11052 01 Jan 23 04:18 PS 04 -Replace replace
- Remove - selenoid
action rotary ppm
Hydraulic parking
lamp all blue
pump brake 01 Jan 23 16:18 01 Jan 23 17:58 13.7 RFU SCM W/S BINTANG 9180
- Create JSA - Cru
- crew mm
magang
- Riki
REST .TIME,-Leveling - -add action grease PSand oil
tank
500 HYd&T/M
3 P GD825A2 GR477 KP424831 31389 31389 01 Jan 23 07:00 OIL ENGINE LEAK -Prepare
Prepare tool
tools & partPart 01 Jan 23 12:00 02 Jan 23 05:32 22.5 RFU USM - Sutomo
BANDARA PERSIB
1000
. Replace -tube - -Adjust
retorque
output - action parking
bolt papyoke brake
all lift cyl(Ex
replace bulbHydraulic lamp sign pump front LHHydraulic - Crew MM
PELIKAN
4 P GD825A2 GR430 WO PLANT 65655 65655 01 Jan 23 19:01
REPAIR ATTACHMENT & HYDRAULIC - retorque -waiting bolt-cleaning circle -pump bottom
action
part
radiator
PTA)
dari (part kurang)REST
FUIbintang 01 Jan 23 21:41 01 Jan 23 21:41 2.7 RFU SCM Pak eko tanto, WS PEDAYAK 8000
ELECTRIC . Install TIME,- -cleaning
. greasing
Hydraulic continue unit
manual
pump PS
-instal pin - Create
support JSA Bladeassy RH
5 P GD825A2 GR512 00808014 31544 31544 01 Jan 23 19:50 PS 01 .- Completed
cleaning . cek
- Prepare -Groundline
drop hose washer
tools test
voltage
and& Part wipper
wiring 02 Jan 23 04:45 02 Jan 23 04:45 8.9 RFU SCM Pak eko tanto, W/S BINTANG 9190
-add oil hyd
- pengecekan kebocoran -. Ground
. cek adjust
-grountes freon
articulated
area test c/v hyd .lift cylinder
6 P WA6003(AR) WL436 KP424889 24647 24647 02 Jan 23 02:40 OIL HYDRAULIC LOW - replace - adjust guide fire suppresion
blade lower 1 pcs 02 Jan 23 04:10 02 Jan 23 04:10 1.5 RFU USM Pak eko tanto, Pak bowo BANDARA THAMRIN 7600
. PPM -addHydraulic Grease
- replace
. PPM Transmission - -addcleaning
lampu (Adjust
oil hyd unitmain
rotari biru pressure)
- install -
. Install final
bolt
-grountes check
cover
air tank tangga5
Page
-safety talk
-P5M 02
-Membuat JSA
02 January 2023 SHIFT I: MEMET -Prepare tool SHIFT II: BUDI
-repair box loto
EQ. -replace oil transmisi B/D COM
Perjalanan bintang
-instal –ACTIVITIES
KwestDemarkasi area B/D
CA EGI C/N WO NUMBER HM B/D HM RFU DATE TIME IN DESC. OF TROUBLE TODAYcover battery ESTIMASI RFU DATE TIME OUT Be STAT PIC REMARK P
Cek-flushing
kebocoran fuelfuel TYPE
T US Man Power CODE
Remove
-checkengine
kebocoran oil filter & main
piping fuelLH
Lift cyl filter
Remove hose breather Sujanto
-Remove
TRACKcover radiator
DOZER
Remove cover -remove cover & piping clamp2Lift (kendala bolt slack) Aditya
cyl
Remove braket oil engine Dodik
1 P D155A6R DZ1118 00808020 65481 65481 01 Jan 23 10:34 PS 02 -welding piping Lift cylfilter 02 Jan 23 17:42 02 Jan 23 17:42 31.1 RFU SCM W/S BINTANG 9185
Riski
TravlingRemove unit, piping
ke -reoring chckpiping injektor
presure no. 2 freon
Liftac,adjust
cyl
Budi, : yanu
2 P D155A6R DZ1205 WO PLANT 31023 31023 02 Jan 23 08:30 AC HOT Install
-instalpipingpipinginjector
Lift cyl 02 Jan 23 10:00 02 Jan 23 11:50 3.3 RFU SCM Pak sutrisno, Pak mis PSE 8500
Install braket engine Suryadi
3 P D375A6R DZ519 WO PLANT 48906 48906 02 Jan 23 10:30 REPAIR TRACK ROLLER -instaloil filterradiator
cover REST TIME,Complated
02 Jan 23 14:00 02 Jan 23 15:30 5.0 RFU SCM Pak sutrisno, Pak mis K WEST 6000
piping main fuel A. Iwan
-connec hose liftfilter
cyl
cehck trouble, replace Install elemnt
covergril fuel pro, replace fuel
cover
4 P D375A6R DZ510 KP424936 51757 51757 02 Jan 23 13:20 LOW POWER -remove 02 Jan 23 15:20 02 Jan 23 14:23 1.1 RFU USM Pak sutrisno, Pak mis PCB 1000
filtere, ground
Complated clamp test, rfu
wiring harnes
cehck trouble, replace -kacher elemntradiatorfuel pro, replace fuel
5 P D155A6R DZ1217 KP424948 28932 28932 02 Jan 23 19:04 LOW POWER Cleaning
-move air cleaner
tohose
unit 02 Jan 23 21:00 02 Jan 23 20:45 1.7 RFU USM Pak latif, Pak wiwik WS PEDAYAK 1000
traveling -cleaning
filtere,
time, check cover
ground
trouble, test, trunion
rfu presure ac,
check
Install
-cleaning -cekoilkebocoran
engine hosefilter
6 P D155A6R DZ1216 KP424949 28485 28485 02 Jan 23 21:14 AC HOT replace relay blowercover ac, ground tilt
test,cylwakid crew 02 Jan 23 22:00 02 Jan 23 22:15 1.0 RFU USM Pak latif, Pak wiwik KUTILANG 8500
Replace
-remove
-refill oil hydraulic-Isoma main
piping
-safety fuel cyl
-repair
talk filter
lifthose grease
check trouble, replace Bleeding
-waiting air crane
cleaner,
fuel adjust linkage
7 P D85ESS2 DZ144 WO PLANT 1855 1855 02 Jan 23 09:00 REPAIR ENGINE p5m bagi job, jsa, -prepare -greasing
check part &crew
trouble, toolreposisi lock out 02 Jan 23 09:00 03 Jan 23 05:40 20.7 RFU SCM Pak latif, Pak wiwik GERDAS BAWAH 3000
Ground fuel
-instal dial,
test, cek
piping yusuf
kebocoran
hose cyl liftfuel test, yusuf
switch, repair wiring lock -tambah
-buat freon
outjsaacc, ground
8 P D155A6R DZ1147 WO PLANT 54548 54548 02 Jan 23 16:00 REPAIR RADIATOR COOLING SYSTEM -remove Rfu cap cylunit 02 Jan 23 21:00 03 Jan 23 05:40 13.7 RFU USM Pak latif, Pak wiwik BANGAU 1000
-travel tomounting
unit-penarikan
crew lift
-travel unit -replace
tempat cylaman
lift lh(malaga) Conti
9 P D375A6R DZ522 WO PLANT 52116 02 Jan 23 23:00 REPAIR HYD 02 Jan 23 13:00 ### SCM Pak latif, Pak wiwik KENARI JARI 3 8000
-instal cover cap
-reposisi unitcyl lift nue
TRACK -washing
-cek circle, dropunit
EXCAVATOR voltage
-add oli hyd + cek-washing all oli + coolenttraveling time,
- repair hose unit Grease
1 P EX12006 EX1308 WO PLANT 16980 16980 27 Mar 23 08:13 CYL BUCKET LEAK akses area hujan deras, -actionLV cari 1tempat aman smabil
ps grease 27 Mar 23 11:00 27 Mar 23 10:40 2.4 RFU SCM Pak karim, Pak woyo FLAMINGGO 8000
- install nipple
nunggu reda, trouble -repair shooting
hose greasehydraulic lift blade
2 P PC1250SP8 EX1128 WO PLANT 27084 27084 02 Jan 23 11:30 REPAIR TRACK & HYD replace
tidak mau hose boom
naik, wakid crew 02 Jan 23 15:00 02 Jan 23 16:25 4.9 RFU USM Pak karim, Pak woyo MALAGA 7600
-cek-remove
travel cover2
fungtion
3 P PC1250SP8 EX1155 00808018 26817 26817 02 Jan 23 09:00 PS 03 -cek-replace travel under fuel pro no load 02 Jan 23 19:00 02 Jan 23 17:23 8.4 RFU SCM Pak karim, Pak woyo MALAGA 9185
-cleaning water sparator-resttime-repace-cek rating fd lh rh air cleaner
4 P PC1250SP8 EX1161 KP424933 25917 25917 02 Jan 23 14:20 TRACK JAMMED -repair wiring 02 Jan 23 16:00 02 Jan 23 14:50 0.5 RFU USM Pak karim, Pak woyo KARTINI 6000
-cek fdselenoid oil levelgrease lh rh pump
5 P PC1250SP8 EX1105 KP424934 64548 64548 02 Jan 23 14:00 CANT START -cek -repair
kebocoran
REPAIR WEARING LOCK OUT wiring work
floating lamp
seal lh rh 02 Jan 23 18:00 02 Jan 23 15:00 1.0 RFU USM Pak karim, Pak woyo BANGAU 1000
-repair
-cek travel wiring rotari
fungtion
6 P PC1250SP8 EX1168 WO PLANT 23459 23459 02 Jan 23 20:10 REPAIR ENGINE & HYDRAULIC pengecekan -cleaning
-cek travel kebocoranarea underbawah noengine
cylinder loadarmRFU 02 Jan 23 21:10 02 Jan 23 21:10 1.0 RFU SCM Pak haryadi, Pak hartoyo JLN BAGAU 1000
-replace -cek rating safety fd valvelh rh1pcs
7 P PC1250SP8 EX1161 KP424952 25926 25926 02 Jan 23 18:00 TRACK JAMMED -kawasima hose area 02 Jan 23 21:30 02 Jan 23 21:30 3.5 RFU USM Pak haryadi, Pak hartoyo KARTINI 6000
-cek fd1.oilP5M level lh rh pump
main
-cek -replacekebocoran 2. -Reposisi
Safety
pressure
Prepare - P5m
floating Unit
talkswitch
JSA seal 2pcs
lh rh
8 P PC1250SP8 EX1150 WO PLANT 28181 28181 02 Jan 23 18:42 REPAIR TRACK & HYDRAULIC 02 Jan 23 23:00 03 Jan 23 04:50 10.1 RFU SCM Pak haryadi, Pak hartoyo WS PEDAYAK 6000
-Adjust - Prepare
-
-grountest
3. Prepare Part Track
P5M JSA LH
9 P EX12006 EX1311 KP424950 16118.6 16118.6 02 Jan 23 19:36 OIL ENGINE LOW - Prepare
4. daily
Krida - Prepare check
workshop spareparts
-install +administrasi
cover2
add 1.oli &engine
Action tool FUI:
box 03 Jan 23 00:00 03 Jan 23 05:20 9.7 RFU USM Pak haryadi, Pak hartoyo SINAI 1000
- Prepare
- Replace -Cleaning --QA7
P5m
Spare
element Unit parts
fuel pro Conti
10 P EX12006 EX1308 SAFETY 16969 02 Jan 23 15:00 BURNING - Flushing--fuel investigasi
Prepare
Action and FUI
QA1 JSAhydraulic
oil ??? ### ICM Pak karim, Pak woyo FLAMINGGO ??
nue
replace- final Prepare - Cek drive - spareparts
droplh,masih
Action
Drop voltage
voltage & tool
FUIwaiting batt boxfinal drive Conti
11 P PC400LC-8 EX291 WO PLANT 4656 25 Dec 22 09:00 REPAIR FINAL DRIVE -Pressure
Action FUI ??? ### SCM Pak haryadi, Pak hartoyo PDY WEST 6000
replace final - Cek drive
- Cek -drop lh,masih
all work
voltage waiting
AClamp batt final drive nue
- Cek Action
- Sampling drop1. P5M voltage
ps 500
oil all batt
ARTICULATED - Drain
- Sampling
hole DT,WT,FT
waterpump
oil E/G HYD
---cek2.Sampling
Cek pressure
Prepare
bottom oil
JSA
guardACall
1 P HM4003R DT1670 WO PLANT 18545 18545 02 Jan 23 03:52 PS 02 -- Manual
Manual - PAP 3. Prepare greasing
greasing
all component Part All shaft
All shaft 02 Jan 23 17:00 02 Jan 23 20:22 16.5 RFU SCM Pak ama, Pak jhoni W/S BINTANG 9185
- Cleaning 4. Krida bottom
- -pengecekan
-Check
Check
workshop guardREST
all
drain lightning
1.
Cyl hole
Action
&TIME, - Check all
FD FUI:
2 P HM4003R DT1678 WO PLANT 21021.5 21021.5 02 Jan 23 05:30 PS 04 - Check-Revers
autolube - Replace - fan Check lightning
lineRest Time-
all lightning
element fuel Addpro grease tank 02 Jan 23 17:00 02 Jan 23 20:22 14.9 RFU SCM Pak ama,
- AdiPak
R.Bjhoni W/S BINTANG 9180
motor dan after cooler
-Adjust
- Flushing - -
v-belt
Check
2. Action Service 1000Rest time- Continue action addfuel air
Ac
autolube
and battery
dan oil alternator
line
hydraulic - wahyudi hs
3 P HM4003R DT1700 WO PLANT 21766 21766 02 Jan 23 05:10 PS 03 02 Jan 23 17:00 02 Jan 23 18:00 12.8 RFU SCM W/S BINTANG 9190
- -Cek Replace
- retoquebottom - Drop guard spider
guard
service suspension
voltage frontn E/G
T/M - As'ad
4 P HM4002 DT1552 WO PLANT 52799 52799 02 Jan 23 08:42 PS 03 -Replace
Replace
--Cleaning - Rubber spider
prepare
bottom
Check - Pressure propeller
tools&JSA
guard
flexible
Torque AC E/G
tube
Rod shaft
dan artic
LH&RHT/M 02 Jan 23 18:42 02 Jan 23 20:22 11.7 RFU SCM - Adi
Pak ama, P jhoni
Pak W/S BINTANG 9185
-Painting - -Drain -Replace
-DO - hole
no
Adjust Cek
ps Bolt
lambung
250 Error
vbelt Spider
hours
waterpump acbelakang
5 P HM4003R DT1760 KP424930 21335 21335 02 Jan 23 09:48 OPT SEAT OBLACK -repair
-adjust prepare opr tools&JSA
seat , rfu 02 Jan 23 12:00 02 Jan 23 11:00 1.2 RFU USM Pak ama, Pak jhoni PS PDY 6500
--Cek -Retorque -wiring
Replace
- cek bottom cleaning
vbeltErrorbolt
brake
v-belt spider
unit
guard
Alternator sensor
AC
- Cek
6 P HM4002WT DT1551 KP424928 51528 51528 02 Jan 23 09:45 ERROR 03
- Repair ----Replace repair
- cleaning
PAP
Leveling allhose
wiring greasebrake
component
OIL grease
area
HYD sensor
tank 02 Jan 23 11:30 02 Jan 23 11:30 1.8 RFU USM
- Amrin
TURNAN KANCIL 3000
- Cek wiring vbrake sensor
- Replace
- Repair
- pengecekan -- Leveling
adjust
--bulb
Groundtest
reporting
wiring
belt
lampu
OILCylTM
brake
ac
&kota FD LH
sensor
- Padjrian
7 P HM4003R DT1730 KP424931 16125 16125 02 Jan 23 14:40 ERROR 03 Resttime-
-ReversReplace - -Cleaning
fan add
--motor
Final
Safety grease
rubbercheck
dan
talk
toolstorq
after rod rear LH
cooler 02 Jan 23 17:00 02 Jan 23 20:22 5.7 RFU USM Pak ama, Pak jhoni TS RASAMLA 7000
2. Action Service -- Cleaning
Change
-cleaning
-500Rest
Replace ----P5M
P5M
Groundtest rfu
P5Moil
area unit
engine
time-
R/D kerja Continue action Pak aris, Pak bowo, Pak eko
8 P HM4003R DT1704 KP424946 21754 21754 02 Jan 23 19:27 AC HOT - PREPARE
-- Prepare -
--Replace Final
cleaning PART check
administrasi&
area TOOLS 02 Jan 23 20:35 02 Jan 23 20:35 1.1 RFU USM WS PEDAYAK 8500
- INSTALL -
Prepare Adjust service
Cleaning
RUBBER filter
administrasi
freon unit oil
SPRING tanto
- rfu partsQA1
9 P #N/A DT1767 KP424940 175 175 02 Jan 23 16:45 DUDUKAN BOLT TABUNG FIRE welding
- INSTALL ----Replace
Prepare
Prepare
Administrasi - Cutting
dudukan
MOUNTING
Spare
- reporting
hose
Spare & filter
brake
firepartsQA1
Reporting
COVER pump
supresion BOOGIE, 02 Jan 23 22:14 02 Jan 23 22:14 5.5 RFU USM
Pak aris, Pak eko tanto, Pak
K WEST 8500
- Cleaning - Repair Action
Action FUI
muffler
evaporator
FUI wahyu
- Cek - HUJAN
drop voltage batt Pak aris, Pak eko tanto, Pak
10 P HM4002FT DT1576 00808337 43642 43642 02 Jan 23 11:25 PS 02 - --Repair
INSTALL Cek-drop handle
Drain
REAR freon
voltage pintu
SUSPENSION LH
batt 02 Jan 23 21:25 03 Jan 23 02:25 15.0 RFU SCM W/S BINTANG 9185
-- Sampling oil engine dan wahyu
REPLACE Sampling
SPIDER
- LEVELING - Cek - JOINT end
Adjust
OIL oilREAR play
freon
engine
PROPELLER engineacdan hyd
SUSPENSION hyd
SHAFT REAR Pak aris, Pak eko tanto, Pak
11 P HM4002 DT1586 WO PLANT 38706 38706 02 Jan 23 17:32 INER AXEL LEPAS - -Repair -- Cek
- Cleaning
Cek pressure
fleksibel
pressure unit AC
muffler
AC 03 Jan 23 04:00 03 Jan 23 04:56 11.4 RFU USM KENARI 4000
ADJUST SUSPENSION wahyu
-- Manual
Manual - -
Leveling greasing
Cleaning
greasing OIL areaAll
HYD
All shaftshaft Pak aris, Pak eko tanto, Pak
12 P HM4002 DT1584 WO PLANT 37259 37259 02 Jan 23 09:08 REPAIR HYD --- Check - REST drainTIME hole 03 Jan 23 04:56 03 Jan 23 04:56 19.8 RFU SCM W/S BINTANG 7600
- Administrasi Leveling
Check and
drain
- all
P5M OILReporting
TM
hole wahyu
- WAITING --TYRE Check HANDLE INSTALL TYRE & Pak aris, Pak eko tanto, Pak
13 P HM4003R DT1739 00809198 2286 2286 02 Jan 23 19:41 PS 01 - Cleaning
Check - KRIDA
MOUNTING all lightning
tools
lightning 03 Jan 23 07:00 03 Jan 23 04:54 9.2 RFU SCM W/S BINTANG 9190
--- Check autolube line wahyu
-
- ADJUST Cleaning
Check
Prepare area
autolube
administrasi
PRESSURE kerja
line
TYRE Pak aris, Pak eko tanto, Pak
14 P HM4003 DT1748 00809185 9794.8 9794.8 02 Jan 23 19:44 PS 03 -- Cek
Cek- bottom bottom - Cleaning guard
guard unitT/M
T/M n E/G
n E/GT/M, ADD 03 Jan 23 07:00 03 Jan 23 04:55 9.2 RFU SCM W/S BINTANG 9190
- REMOVE STAND- Prepare LEVELING Spare parts
OIL HYD, wahyu
-- Check flexible tube
15 P HM4003R DT1704 KP424945 21755 21755 02 Jan 23 21:32 AC HOT - Administrasi Check -Replace
Waiting
GREASEflexible R/D
& Reportingp5m
Unit tube 02 Jan 23 23:00 03 Jan 23 02:25 4.9 RFU USM
Pak aris, Pak eko tanto, Pak
WS PEDAYAK 8500
-- DO DO ps
ps 250
Adjust
Prepare 250 freon hours
part
hours wahyu
- CLEANING -AREA Waiting & bays
CLEANING TOOLS Pak aris, Pak eko tanto, Pak
16 P HM4003R DT1627 KP424960 36756 36756 03 Jan 23 02:30 KEBOCORAN OIL HYD - Washing repair --- Prepare
Add
Add
unitRest
REPORTING
grease
grease
keboran jsa hyd PPM
Time- 03 Jan 23 05:46 03 Jan 23 05:46 3.3 RFU USM K-WST 7600
-- Replace wahyu
Replace bulb bulb lampu lampu -Sholat
PAP
kota
kota ALL
LHCRest
isa
LH Resttime- time Replace
Retorq Conti Pak aris, Pak eko tanto, Pak
17 P HM4003R DT1696 SAFETY 17921 27 Dec 22 07:00 VESSEL REBAH Replace spider rdfront
AC RH tm ??? ### ICM TSSP KUTUKAMBING 6500
monting bottomQA 1 system
guard nue wahyu
- Replace Vacuum - hose Cleaning filter
ACFUI brake to acv
system
unit Conti Pak aris, Pak eko tanto, Pak
18 P HM4003R DT1626 00806977 38552 27 Dec 22 08:45 PS 02 OVH DIFF FRONT & TM welding bruket Action batrey , instal hyd 03 Jan 23 17:00 ### SCM W/S BINTANG 9185
- Replace adjust -hose freon
Cleaning hydAC pumpsystem
area to block nue wahyu
- Check drop voltage Conti Pak aris, Pak eko tanto, Pak
19 P HM4002 DT1613 WO PLANT 47369 29 Dec 22 09:30 REPAIR CHASIS Repair- & --Replace
retorq
Administrasi weldinghose and
kebocoran filter
chasis transmisi
oli
Reporting& fuel transfer ??? ### SCM WS BINTANG 6500
Cleaning drain hole water pump nue wahyu
-Leveling
Cleaningallunit oil
- Cleaning - Cleaning outputarea air comp Conti Pak aris, Pak eko tanto, Pak
20 P HM4002 DT1611 00805013 48594.4 03 Jan 23 03:30 PS 03 move to ws bintang , -washing
P5mtest unit, job panding 03 Dec 23 13:30 ### SCM W/S BINTANG 9190
- Ground
Flushing fuel nue wahyu
- Administrasi - Prepare andJSA Reporting Conti Pak aris, Pak eko tanto, Pak
21 P HM4003R DT1742 00809208 1777.5 03 Jan 23 04:15 PS 03 move to ws-bintang Cleaning bolt join
, washing tankjob panding
unit, 03 Jan 23 12:15 ### SCM W/S BINTANG 9190
--Cleaning
Prepare spareparts strainer transmissi & Tool nue
Conti
wahyu
Pak aris, Pak eko tanto, Pak
22 P HM4003R DT1627 00809178 36756 03 Jan 23 05:47 PS 03 move to ws bintang -
- Greasing Action, washing PAP
manual all
unit, job panding 03 Jan 23 17:30 ### SCM W/S BINTANG 9190
nue wahyu
- -Cek Action PPM
Replace AirTMdryer
ALL
- Replace -* ACTION errorSERVICE
GR,WL (D3)II
* Replace bulb breather
- Cleaning indicator area
transmissi
- parking
p5m brake
Action PSoilIVhyd 2000 Pak aris, Pak eko tanto, Pak
1 P GD825A2 GR507 KP424943 40084 40084 02 Jan 23 18:44 LEVER TRANSMISI ERROR * -Addcreate jsa 02 Jan 23 20:36 02 Jan 23 20:36 1.9 RFU USM WS PEDAYAK 3000
- *Cleaning area wahyu
- prepare Addtool oil TM & part Pak aris, Pak eko tanto, Pak
2 P GD825A2 GR427 00808944 66035 66035 02 Jan 23 10:20 PS 01 - Cleaning 1.testP5M Tool 03 Jan 23 05:00 03 Jan 23 04:55 18.6 RFU SCM WS BINTANG 9190
-* action
- Administrasi
Ground
*Prepare
2. backlog
Prepare
jsaunit
& Reporting. &_RFU
&tool QA1P5M wahyu
3 P GD825A2 GR380 00809101 68484 68484 02 Jan 23 11:45 PS 01 . replace #gasketcheck allJSA
tandem oil rh & lh 03 Jan 23 03:00 03 Jan 23 02:41 14.9 RFU SCM
Pak aris, Pak eko tanto, Pak
W/S BINTANG 9190
. Prepare 3. Prepare oiltoolhydand Partpart wahyu
. cek*Add 4.strainer
. CRVC
Krida tmEngine
workshop +10 isiltr oli tm Pak aris, Pak eko tanto, Pak
4 P GD825A2 GR498 WO PLANT 34913 34913 03 Jan 23 01:55 REPAIR HYDRAULIC ENGINE & ELECTRIC *Retorque .. Take
install Mounting
bolt tangga lever3pcs transmisi 03 Jan 23 04:00 03 Jan 23 04:53 3.0 RFU USM WS PEDAYAK 7600
5. sampleWAITING Tandem
UNIT oil wahyu
*Reposisi. install-dowel bolt cap
cover lift
tm cylinder Conti Pak aris, Pak eko tanto, Pak
5 P GD825A2 GR446 WO PLANT 66788 02 Jan 23 07:40 PS 03 . Change
*Check tandem
washing
kebocoran oil
unit RH4pcs & Lh 03 Jan 23 15:00 ### SCM ANGGREK DISP 9185
-. .replace
Refill
remove elbow
Transmission
BladeRest airoil dryer hyd
oil
time
nue wahyu
. replace # Ground
guide blade test
. Refill
Prepare Final
tools danupper
Drive jsa lh
oil
. repair. Refill lever-.reposisi selector
hydraulic unitfroil & RrPagetm 6
03

03 January 2023 SHIFT I: MEMET SHIFT II: BUDI


EQ. B/D COM
B/D
CA EGI C/N WO NUMBER HM B/D HM RFU DATE TIME IN DESC. OF TROUBLE TODAYP5M ACTIVITIES ESTIMASI RFU DATE TIME OUT Be STAT PIC REMARK P
membuat JSA TYPE
T US CODE
prepare tool
TRACK move to DOZER unit
- parkir unit
reposisi unit
1 P D375A6R DZ510 WO PLANT 51771 51771 03 Jan 23 07:25 OIL HYD LOW - cek trobel
check all oil 03 Jan 23 09:25 03 Jan 23 09:48 2.4 RFU USM Pak sutrisno PCB 7600
remove - replace cover fuel control pro valve
2 P D155A6R DZ1217 KP424994 28943 28943 03 Jan 23 10:30 OIL ENGINE LOW / E03 check - grondtes
kebocoran 03 Jan 23 12:00 03 Jan 23 12:10 1.7 RFU USM Pak sutrisno PEDAYAK WEST 1000
3 P D155A6R DZ1116 WO PLANT 69344 69344 03 Jan 23 10:56 REPAIR UNDERCARRIAGE
rest time travelingadd ke- cek oil- hydraulic
unit rfu
yg
trobel breakdownrepair track
03 Jan 23 15:00 03 Jan 23 15:42 4.8 RFU SCM Pak sutrisno DISP ANGGREK 6000
addtraveling ke unitreplace
roller,
oil transmisitraveling
- add
yg breakdowncheck,
carrier
ke unit yg roiller add oil
breakdownadd
p5m dan bagicoolent
engine, jobtraveling
ground
radiator
test ke unit yg
4 P D155A6R DZ1205 KP425024 31051 31051 03 Jan 23 18:47 CANT RUNNING hydraulic -oil, test kebocoran
grontes 03 Jan 23 20:01 03 Jan 23 20:01 1.2 RFU USM Pak latif, Pak wiwik PSE 1000
breakdownreplace terminal battery
- rfu
5 P D375A6R DZ522 WO PLANT 52116 52116 02 Jan 23 23:00 REPAIR HYD √Check connector 03 Jan 23 23:00 04 Jan 23 01:00 26.0 RFU SCM Pak latif, Pak wiwik KENARI JARI 3 8000
p5m dan bagiP12 epc selenoid
jobtraveling ke unitfrontyg& rear
√Repair
breakdownreplace balde liftke
traveling ke unittraveling wiring selenoid unitcheck
cylinder epclh rh, trouble
replace
6 P D155A6R DZ1090 WO PLANT 65590 65590 03 Jan 23 17:20 ADD FREON 03 Jan 23 23:00 03 Jan 23 23:00 5.7 RFU SCM Pak latif, Pak wiwik FR DUBAI 8500
strainer √check
actual, recharging
hydraulicflushing resistantfreonrest epc selenoid
oil timeground
hydraulicground test
7 P D375A6R DZ510 WO PLANT 51781 51781 03 Jan 23 17:40 LAS BRUCKET COUPLER FUEL p5m√checkdan
p5mbagi resistant
dan jobtraveling
bagi wiring
testrest
jobtraveling A11
ke
time unit pinkeyg no
unit 5.6.7,8
breakdown
yg 03 Jan 23 23:00 03 Jan 23 22:28 4.8 RFU SCM Pak latif, Pak wiwik PCB 6500
√Check P5M
connector S25
breakdownremove rh straigh frameinstall new Conti
8 P D375A6R DZ571 WO PLANT 28821 03 Jan 23 14:17 REPAIR BLADE RH √Check Prepare tools 03 Jan 23 23:00 ### SCM Pak latif, Pak wiwik DISP KENARI 8000
straigh connector
framecompleted CP 02 pin 96,104.115,117,120
all boltrest timeHujan nue
√repair Prepare parts
9 P D155A6R DZ1261 00808344 3021 04 Jan 23 04:05 PS04 + BACKLOG derasprolix full area switch
04 Jan 23 21:00 ###
Conti
SCM Pak latif, Pak wiwik W/S BINTANG 9180
Prepare
√Rep dioda sarana 01 nue
√check Travel connectorto unit P28
TRACK Buat
EXCAVATOR
& sosialisasi JSA
√Check wiring P27
Prepare area kerja Pak karim, Pak woyo, -Andy R
1 P PC8508R1 EX2350 KP424997 22389 22389 03 Jan 23 06:30 LOW POWER √Check connector CP 01 03 Jan 23 09:00 03 Jan 23 09:10 2.7 RFU USM TS KENARI JARI 4 1000
Cleaning tanah area hose travel motor -Hendra
√Re wiring-Retorq kabel connectordari connector Hose Fuel A11 fastpinfillno3 ke
2 P PC1250SP8 EX1168 WO PLANT 23449 23449 03 Jan 23 07:50 REPAIR ENGINE &HYD Change-Retorq oil engine , coupling , swing front 03 Jan 23 11:00 03 Jan 23 10:15 2.4 RFU SCM Pak karim, Pak woyo FLAMINGGO 1000
hose J27 pengisian
input Fuel ,swing
√Install cover rearbawah kabin
3 P PC1250SP8 EX1150 WO PLANT 28189 28189 03 Jan 23 11:40 HOSE MOTOR TRAVEL LEAK 03 Jan 23 15:00 03 Jan 23 14:45 3.1 RFU SCM Pak karim, Pak woyo PDY ATAS 4000
Adjust √Kawasima oil final Drive LH and RH
wirirng
4 P EX12006 EX1304 KP424996 18231 18231 03 Jan 23 11:45 TRACK KIRI LEMOT RestIsi
√Ground time-install
greasing
testPending track job:
tank RH 03 Jan 23 15:00 03 Jan 23 14:55 3.2 RFU USM Pak karim, Pak woyo DISP KENARI 6000
- Reposisi Greasing-adjust
pin-bucket track
attachment RH
sisi battom
PC8508R1 P5m
5 P EX2356 WO PLANT 26356 26356 03 Jan 23 11:45 REPAIR TRACK SYSTEM - install lock-retorq pin bucket, Sampelmounting
- -grountest all
lock oil
Prepare JSA bolt muonting
injector
pin+ 03 Jan 23 18:00 03 Jan 23 18:00 6.2 RFU SCM Pak karim, Pak woyo
Pak karim, Pak woyo, Mp : Agus,
CENDRAWASIH 6000
- Prepare Cleaning infofilter
spareparts GL & ACtool box
6 P PC8508R1 EX2385 WO PLANT 19032 19032 03 Jan 23 06:00 PS 04 03 Jan 23 18:00 03 Jan 23 18:00 12.0 RFU SCM Ricky ,Alif ,Yonathan ,Bagas ,Arfi HYDROS 9180
Repair -Bawahose
-Cleaning di greas
hammer e di link
5kg
Repair-Leveling
kebocoran P5m Unittube Rest time -
detecting
yan ,Faizal
7 P PC8508R1 EX2350 WO PLANT 22389 22389 03 Jan 23 09:10 REPAIR HYD&ELECTRIC Oli-oli - PPM JSA coolant
+ water 04 Jan 23 04:30 04 Jan 23 04:30 19.3 RFU SCM Pak karim, Pak woyo TS KENARI JARI 4 7600
Cleaning -tanah - Prepare area
- Preparecontroller Action
spareparts FUIhose t/m Conti
8 P EX12006 EX1304 WO PLANT 18231 03 Jan 23 14:55 7REPAIR TRACK & HYD -Replace - Cek-Cleaning drop voltage fire&suprission
tool box
batt
??? ###
nue
SCM Pak haryadi, Pak hartoyo SELENA KUTILANG 7600
-Cek hole Unit
w/p Conti
9 P EX12006 EX1308 SAFETY 16969 02 Jan 23 15:00 BURNING - Cek all work
- wipper
Action FUI lamp ??? ### ICM Pak haryadi, Pak hartoyo FLAMINGGO ??
-add air ps & coolant nue
-replace - CekAction hosedropinput voltage750
ventbatt pump Conti
10 P PC400LC-8 EX291 WO PLANT 4656 25 Dec 22 09:00 REPAIR FINAL DRIVE -cek -drain Cek hole
all work water lamp pump ??? ### SCM Pak haryadi, Pak hartoyo PDY WEST 6000
-repair cover bawah nue
- Sampling Actionoil ps E/g
750 &m/p H/d Conti
11 P EX12006 EX1311 WO CCR 16131 04 Jan 23 05:20 CANT START -replace fuel pro ??? ### USM Pak haryadi, Pak hartoyo SINAI 1000
- Manual
-cek drain greasing hole
- P5m water Allpump shaft nue
- * APIP *
ARTICULATED - -washing
Check
- Sampling - Prepare
radiator
autolube
oil E/g DT,WT,FT
JSA &lineH/d
-washing unit - AMRIN
- Prepare- sparepartsManual- Adjust v-
greasing belt
toolAll
&cover" AC
boxshaft - Action FUI
-instal - belt
P5M - RAHARJO
1 P HM4002 DT1611 00805013 48594.4 48594.4 03 Jan 23 03:30 PS 03 - -Adjust
-CekCheck v-
drop all Alternator
lightning
voltage batt 03 Jan 23 13:30 03 Jan 23 17:10 13.7 RFU SCM W/S BINTANG 9190
- Adjust V- belt -groundtest
- KRIDA
E/GrEST, Add grease --ADI
RESTU
R. B
- Check - autolube
Sampling lineRest
oil all Time tank
2 P HM4003R DT1742 00809208 1777.5 1777.5 03 Jan 23 04:15 PS 03 - Prepare
- retoque -QA7
P5Madministrasi 03 Jan 23 12:15 03 Jan 23 16:22 12.1 RFU SCM -- Aldi
DEDIP W/S BINTANG 9190
cekmunting
--Adjust
Add grease
pressure
fan Pum
tie
tankACrood - Tarno
3 P HM4002 DT1610 WO PLANT 50368 50368 03 Jan 23 07:35 OIL HYD LOW
Pengecekan -- Prepare
-Cleaning Prepare
- -Waitting
Manual
kebocoran
-Adjust bottom
--Create
Create
Spare
administrasi
v-belt
greasing JSA
JSA
parts
demand
guardAc shaft
All T/MValve 03 Jan 23 10:35 03 Jan 23 09:17 1.7 RFU SCM Pak ama, Pak jhoni PS PDY 7600
unitREST,QA1
- Replace - Prepare -Add
Prepare
- retoque
Preparehose
Check oilSpare hyd
tools
spider
tools npump
drainpartsQA1
pilot &
& TM Partto EPC
front
hole Part
4 P HM4003R DT1701 KP424992 21982 21982 03 Jan 23 08:20 ROTARY MATI,SUSPENSI -Replace
-Cleaning lampu
--Pengecekan
bottom
Check -Action
Jack allguardFUI
clearench
kabin trouble
lightning E/GRH dan & T/MLH 03 Jan 23 10:20 03 Jan 23 09:13 0.9 RFU USM Pak ama, Pak jhoni PS PDY 7400
-Painting - Cek
---Replace drop
no lambung voltage
fuse trouble
lampu autolub
rotary
front batt rear
5 P HM4003R DT1759 WO PLANT 16775 16775 03 Jan 23 08:52 ERROR BRAKE
Pengecekan
Check autolube line& STP CADAS
----cek
Sampling
Sampling
- Repair
-Replace
Ground
- bottom
Prepare
-Replace oil
oil
hose
test&
hose
Engine
engine
tools
guard
guard wiper
final
&
tyre
accumulator
T/M
dan
dan
tank
check
Part
L/H hyd
hyd
& eng
03 Jan 23 10:52 03 Jan 23 17:55 9.0 RFU SCM Pak ama, Pak jhoni 7200
- Cek -PPM pressureUNIT AC brake
6 P HM4003R DT1668 WO PLANT 18847 18847 03 Jan 23 08:57 ADD GREASE -- addReplace
-Check
Replace Pengecekan
--Replace
grease, O-Ring
hose hose
flexibledemand
Grountest filter
trouble
grease
muffler ,valve
rfu 03 Jan 23 11:00 03 Jan 23 10:20 1.4 RFU SCM Pak ama, Pak jhoni PS PDY 8500
--Manual
- -Adjust
remove
-Replace Cek greasing
pressure
accumulator
hose
nipple All
(crimping)ACshaft
grease
- Add - Do Oil
PS T/M
III
7 P HM4002WT DT1551 WO PLANT 51600 51600 03 Jan 23 16:07 REPAIR T/M -repair- remove -- Ground
nomor --leveling
Manual Check
-hose
lambung greasing
install
testepc
drain
engine
&hose
hole
samping
final
to All
fan shaft
oil
check kiri/vessel
motor 04 Jan 23 01:55 04 Jan 23 01:55 9.8 RFU SCM Pak wahyu, Pak eko tanto WS KELADI 3000
--CheckCheck -hose
- cleaning all
add lightning
drain oilunithole
8 P HM4003R DT1634 00808952 24034 24034 03 Jan 23 11:17 PS 01 - remove
--Check autolube brake pedal
line 04 Jan 23 04:26 04 Jan 23 04:26 17.1 RFU SCM Pak wahyu, Pak eko tanto PS PDY 9190
- remove - Ground
hose Check
- test
cleaning
brake all& lightning
pump final
area tocheck
filter brake
- Cek-- Preparebottom
Check- hose
Cleaning toolstool
guard
autolube
- reporting
&T/M Part
linen E/G
9 P HM4003R DT1712 00809194 19541 19541 03 Jan 23 16:43 PS 02 - remove --bottom
Pengecekan
Check return
flexible brake
trouble
tuben E/G tank 04 Jan 23 02:43 04 Jan 23 04:28 11.7 RFU SCM Pak wahyu, Pak eko tanto W/S BINTANG 9185
--Cek remove -hose guard
reporting flow T/M
amplifier
- replace
--Prepare
Check - DOflexible ps relay
tools 4000 &tubeacPart
10 P HM4003R DT1761 KP425023 13739 13739 03 Jan 23 19:23 AC HOT - replace o-ring hosefreon steering/hoist pump 03 Jan 23 21:47 03 Jan 23 21:47 2.4 RFU USM Pak wahyu, Pak eko tanto WS PEDAYAK 8500
-DO-adjust
- -Pengecekan Continue
ps 500 hours PSac
trouble
11 P HM4003R DT1691 KP425019 21015 21015 03 Jan 23 21:12 LOCK PIN ARTIC LOOSE - Ground - -Replace
- repair
cleaning
test
-cleaning lock
Add grease & unit check
final
Battery
bar artic 03 Jan 23 21:26 03 Jan 23 21:26 0.2 RFU USM Pak wahyu, Pak eko tanto WS PEDAYAK 8000
- area
- Replace --Repair
bulb Replace
lampu braketsign lampu
kerja glass
rh T/M
tyre Replace
Resttime- Pak wahyu, Pak eko tanto, Pak
12 P HM4002FT DT1590 KP425030 44321 44321 03 Jan 23 23:34 ROTARI LAMP OFF - repair
reportingPendingwiring
- Cleaning lamp job
rotary
unit to shift
, rfu II 04 Jan 23 01:56 04 Jan 23 01:56 2.4 RFU USM W/S BINTANG 7000
-hose
Ground input test & final
filter transmisi check aris
- replace - o-ring
Cleaning hose
area epc PARKIRAN FUEL
13 P HM4002FT DT1591 KP425031 40975 40975 04 Jan 23 02:04 CANT RUNNING repair -Replace
- replace wiring o-ringhose hose
starting, fireGrountest
supression
brake pedal , rfu 04 Jan 23 03:30 04 Jan 23 04:27 2.4 RFU USM Pak wahyu, Pak eko tanto 1000
- Administrasi
-adjust o-ring v belt and Reporting
alternator PEDAYAK
- replace - Adjust hose return
Valve
14 P HM4003R DT1627 00809178 36756 36756 03 Jan 23 05:47 PS 03 -leveling air-P5M tambah battre 04 Jan 23 04:27 04 Jan 23 04:27 22.7 RFU SCM Pak wahyu, Pak eko tanto W/S BINTANG 9190
- retorque
- Greasing bolt mounting
all propeller acv
Shaft valve
REPLACE - Cleaning
-creat
STEERING JSA unitVALVE Conti
15 P HM4003R DT1696 SAFETY 17921 27 Dec 22 07:00 VESSEL REBAH - Replace hosepressure radiatorAc & adjust ??? ### ICM Pak wahyu, Pak eko tanto TSSP KUTUKAMBING 6500
-prepare
RE-ORING tool &-part-cek
CONECTOR Cleaning area
STEERING VALVE mts nue
replace hose hyd,
-INSTALL
Administrasi reapair wiring
and lamp
Reporting mundur, Conti
16 P HM4003R DT1626 00806977 38552 27 Dec 22 08:45 PS 02 OVH DIFF FRONT & TM Pressure
HOSE BRAKE AC VALVEbatrey, 04 Jan 23 12:00 ### SCM Pak wahyu, Pak eko tanto W/S BINTANG 9185
lamp reverse lamp, repair brucket nue
INSTALL -remove HOSE FLOW CylinderAMPLIFIER BSS VALVE Conti
17 P HM4002 DT1613 WO PLANT 47369 29 Dec 22 09:30 REPAIR CHASIS -install Bushing welding - P5M chasis,
support blade 08 Jan 23 18:00 ### SCM Pak wahyu, Pak eko tanto WS BINTANG 6500
INSTALL HOSE FAN MOTOR CAC nue
- Rest
INSTALL Krida areaDISCHARGE
time-install
HOSE work shop- support create
BRAKE blade jsa
PUMP Conti
18 P HM4003R DT1680 WO PLANT 20410 03 Jan 23 13:30 ASAP PUTIH ABNORMAL - Prepare mts engine,tool and part 04 Jan 23 18:00 ### SCM Pak wahyu, Pak eko tanto DISP TSSP L 1000
INSTALL - install HOSE CylinderRETURN BSSACV nue
- prepare RETORQ botol- completed
sample PAPrest hosetimeCleaning unit-
BOLT GR,WL MOUNTING
takeeror-install
PPM E/G Blade
BSS ACV
- MTSLEVELING horn ALL OIL Pak aris, Pak eko tanto, Pak
1 P GD825A2 GR425 KP424963 67596 67596 03 Jan 23 05:46 WORK LAMP OFF --CLEANING
repair take
install wiring sample
guide lamp
CABIN PAP
blade , rfu 03 Jan 23 09:00 03 Jan 23 09:00 3.2 RFU USM
wahyu
REHAB NAPOLI 7000
- completedGROUND hose-TEST
QA 1UNIT -P5M
lubrication grease Pak aris, Pak eko tanto, Pak
2 P GD825A2 GR446 WO PLANT 66788 66788 02 Jan 23 07:40 PS 03 - action
*Prepare jsaPS&tool IVValve 04 Jan 23 00:10 03 Jan 23 21:58 38.3 RFU SCM ANGGREK DISP 9185
- add
-Replace oil hydraulic
steering wahyu
- Re oring # - flushing
check
-Cleaning fuel
trouble
Area Pak aris, Pak eko tanto, Pak
3 P GD825A2 GR532 WO PLANT 29516 29516 03 Jan 23 15:12 CYL STERING LEAK replace stutconector bolt lh , steering grountest, Valverfu 04 Jan 23 00:10 03 Jan 23 23:00 7.8 RFU USM CS CIKEAS 5000
- greasing
*Remove . p5m Drivemanual Shaft wahyu
--install
Cek Kanibal hose brake oliValve Pak aris, Pak eko tanto, Pak
4 P GD825A2 GR418 WO PLANT 65590 65590 03 Jan 23 17:30 REPAIR T/M SYSTEM *Otw bintang
- install hose -kebocoran
. add
create
flow grease
Drive
jsa Shaft
amplifier
hyd GR 476
Valve 04 Jan 23 00:10 04 Jan 23 01:55 8.4 RFU USM TANJAKAN SAMRAT 3000
--retorque (Cyl artic
bolttool RH
cover leak) knuckle wahyu
*Otw samrat
. prepare
install instal Drive & Shaft
part cacAssy Pak aris, Pak eko tanto, Pak
5 P CAT24H GR407 KP425017 64734 64734 03 Jan 23 18:49 REPAIR ENGINE HYDRAULIC & BLADE - replace -hoseAdd
terminal
dan
oil hydmotor
batery LH 03 Jan 23 21:18 03 Jan 23 21:18 2.5 RFU USM WS PEDAYAK 8000
. install
- install rod hose & *Final
lock
discharge check
plate guide
brakeblade pumpall wahyu
- check and - cleaning
#Add Ground oil engine
strainer
test transmisi Conti Pak aris, Pak eko tanto, Pak
6 P GD825A2 GR394 00809187 55017 03 Jan 23 14:10 PS 01 . welding
- install nut hose lockreturn guideacv blade 04 Jan 23 10:00 ### SCM W/S BINTANG 9190
-- ground
add pin test
oil hyd nue wahyu
- Retorque. bolt welding mounting lock shanktime-
acvrest ripperLeveling all
. reposisi - repair
bulb panel hose grease &
oilcompleted front axle mounting
- install clamp hose motorPage circle7bagian depan
04

04 January 2023 BOMBER : PAK KARIM


EQ. B/D COM
B/D
CA EGI C/N WO NUMBER HM B/D DATE TIME IN DESC. OF TROUBLE ESTIMASI RFU DATE TIME OUT Be STAT PIC REMARK P
TYPE
T US CODE

TRACK DOZER
Conti
1 P D375A6R DZ571 WO PLANT 28821 03 Jan 23 14:17 REPAIR BLADE RH 04 Jan 23 12:00 ### SCM DISP KENARI 8000
nue
Conti
2 P D155A6R DZ1261 00808344 3021 04 Jan 23 04:05 PS04 + BACKLOG 04 Jan 23 18:00 ### SCM W/S BINTANG 9180
nue
Conti
3 P #N/A 0.0 USM
nue
TRACK EXCAVATOR
Conti
1 P EX12006 EX1304 WO PLANT 18231 03 Jan 23 14:55 7REPAIR TRACK & HYD 04 Jan 23 15:00 ### SCM SELENA KUTILANG 7600
nue
Conti
2 P EX12006 EX1308 SAFETY 16969 02 Jan 23 15:00 BURNING (INVESTIGASI) ??? ### ICM FLAMINGGO ??
nue
Conti
3 P PC400LC-8 EX291 WO PLANT 4656 25 Dec 22 09:00 REPAIR FINAL DRIVE ( WAITING FD ) ??? ### SCM PDY WEST 6000
nue
Conti
5 P EX12006 EX1187 00809013 19756 04 Jan 23 07:10 PS 03 04 Jan 23 18:00 ### SCM FRONT KUTILANG 9185
nue
Conti
6 P PC8508R1 EX2361 WO PLANT 26965 04 Jan 23 07:27 REPAIR TRACK &HYD 04 Jan 23 12:00 ### SCM PEDAYAK WEST 6000
nue
Conti
7 P EX12006 EX1311 WO PLANT 16131 04 Jan 23 07:40 REPAIR TRACK & HYD 04 Jan 23 12:00 ### SCM SINAI 7600
nue
Conti
8 P #N/A 0.0 USM
nue
ARTICULATED DT,WT,FT
Conti
1 P HM4003R DT1696 SAFETY 17921 27 Dec 22 07:00 VESSEL REBAH WAIT RFU DT1613 ??? ### ICM TSSP KUTUKAMBING 6500
nue
Conti
2 P HM4003R DT1626 00806977 38552 27 Dec 22 08:45 PS 02 OVH DIFF FRONT & TM 04 Jan 23 15:00 ### SCM W/S BINTANG 9185
nue
Conti
3 P HM4002 DT1613 WO PLANT 47369 29 Dec 22 09:30 REPAIR CHASIS 08 Jan 23 18:00 ### SCM WS BINTANG 6500
nue
Conti
4 P HM4003R DT1680 WO PLANT 20410 03 Jan 23 13:30 ASAP PUTIH ABNORMAL WAITING TURBO 04 Jan 23 18:00 ### SCM DISP TSSP L 1000
nue
Conti
5 P #N/A 0.0 USM
nue
GR,WL
Conti
0 P WA8003(AR) WL525 00809403 20506 03 Jan 23 16:00 PS 02 05 Jan 23 06:00 ### SCM W/S BINTANG 9185
nue
Conti
0 P #N/A 0.0 USM
nue

Page 8

You might also like