Qatar LNG GHG Management Strategy - Afzal Subedar - Qatargas - Laurent Fragu - RasGas
Qatar LNG GHG Management Strategy - Afzal Subedar - Qatargas - Laurent Fragu - RasGas
Strategy
Concluding Remarks
North Field
Qatargas &
RasGas
Doha
State of Qatar
- Assessing carbon
reduction opportunities
- Understanding climate change - Finalise GHG Policy / Strategy
and abatement
impacts - Develop action plan techniques via
- Emissions’ benchmark (LNG - Allocate resources: GHG sustainability assessment
industry) Specialist / GHG Team and engineering studies
- Regulatory assessment - Detailed annual reporting plan, - Inventory improvements:
- Best practices review for GHG quality manual, and GHG Scope 3, Life Cycle
Policy/Strategy measurement manual Assessment
- Initiate advanced emissions - GHG management procedures - ISO 14064 accreditation
inventory (QP/EU-ETS) and plans, cost-benefit - Energy efficiency audit,
- Capacity building analysis tools improvements
- Mitigation efforts focuses on - Benchmarking GHG - Collaboration with Global
Flare Reduction; efficiency/tonne of LNG, Methane Initiative
Corporate GHG KPIs
- and CO2 injection (RasGas) - Wider outreach and
alignment with the
existing GHG
management global
platform
QP Accounting and Reporting Determination of flow/composition for Fuel Gas systems: integrated/complex,
Guidelines (pilot in RLC for 2010-2012) each emission source multiple fuel sources/quality
Requirements based on EU ETS
Flow measurement uncertainty tiers:
Monitoring & Reporting Guidelines Metre classification/upgrade
activity-based compliance required
(CO2)
Use of IPCC Emission Factors for CH4 Laboratory and online measurement Flare streams measurement,
and N2O accreditation (ISO 17025). Sampling composition and uncertainty
/analysis frequency (weekly)
Operational control, direct emissions
Quality Plan addresseing QA/QC, Establish and document data flow /
only, include all offshore and onshore
calibration and maintenance data control systems
sources
requirements
Annual 3rd Party Verification (ISO 14064-3)
2010 Verification
Statement
Final A&R
QA/QC
Guidelines
2010 Waiver Plan Workshop
GHG Draft A&R End users develop 2010 GHG 2011 A&R 2011 GHG
Taskforce Guidelines initial A&R Plan Verification Plan Update Verification
Jetty Boil-off Gas (JBOG) Project jetty and tankage flaring. 2012 data is up to and
including month of August.
• The $1 billion Jetty Boil-Off Gas (JBOG) Recovery Project - largest environmental project of its kind in the world is
part of the Common Facilities Projects at Ras Laffan Industrial city (RLC)
• Will enable boil-off gas to be collected from RasGas and Qatargas LNG ships and compressed at a central facility.
• When fully operational, will recover approximately 29 billion standard cubic feet (BSCF) per year of gas that would
have been flared (90% recovery efficiency during normal operations).
• Enough natural gas to power more than 300,000 homes.
• Result in reducing Greenhouse Gas (GHG) emission reductions amounts to approximately 1.6 million tonnes of CO 2
per annum
Liquefaction AP-X Hybrid Liquefaction Technology: economies of scale with lower specific CO2
emissions (single vs. parallel train design)
Frame 9E Gas Turbines in LNG service: excess power generated for supply to plant grid
Tail Gas Flexsorb-SE + solvent for: increased SRU efficiency and reduced CO2 emissions from tail
Treatment gas incineration
LNG
Economies of scale with larger Submerged Combustion Vaporizers
Terminals
Monitoring
44
AKG2 Incinerator
mmscfd
Opportunity:
- Inject CO2 from other processing trains
- Recover H2S to produce Sulphur from all processing trains
Current Future Injection
operation
Early Project Development:
- Tie-in from Train 4, 5 & AKG-1 to latest Sulphur Recovery
Units (SRU Train 6, 7 & AKG-2)
- Capacity enhancement in receiving SRUs CO2 injected/year by RasGas, MT
- CO2 injection from Train 4,5,6,7 & AKG 1-2 trains 2.4
Start of
- Project utilises existing AGI compression capacity 2.5 CO2
- Project currently progressed in coordination with QP injection
from
Subsurface Group 2
Trains
- Projected Total CO2 Sequestration: 2.4 MTA 1.1 1.1 6/7/AKG2
Million Tonnes
1.5
0.5
Ongoing GHG Strategy Opportunity:
- Review of CCS Best Practices 0
2005 2014 2015
- CDM Feasibility Study
•ISO 14001-compliant • Major projects on-going to •Coral relocation & monitoring •Host training programmes
• Integrated Management maximise reuse of treated •Conservation of endangered locally on air quality and
System (QHSE) wastewater (based on reuse, hawksbill turtles climate change
•Implementing best practices recycle and reduce •Qatargas – pioneered new •Active in OGP, SPE, IPIECA
from leading multinational philosophy) pulse chlorination programme • Community awareness
shareholders. •Endemic tree planting and programmes: waste recycling,
biodiversity conservation energy consumption.
•QP Energy Efficiency Initiative •Minimisation / recycling of •Sustainability Report since •LEED certification for new
•Best Practices: GEMS, POEMS, industrial and domestic 2009 Palm Tower
ISO-50001 wastes •Dedicated Reporting •Green Office Policy covering
•Steam Loss Management •Best LNG industry recycling Committee energy and water efficiency,
Project performance (RasGas) •Adopted GRI and IPIECA waste recycling,
Guidelines transportation, etc.
Thank you!