0% found this document useful (0 votes)
89 views1 page

Azizi Pearl Work Inspection Request

Uploaded by

Moataz Mohamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views1 page

Azizi Pearl Work Inspection Request

Uploaded by

Moataz Mohamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

WORK

INSPECTION
REQUEST G.I.T. LLC

Client : Azizi/Nakheel Consultant : M/s. 360 Degrees

Project : Azizi pearl at Al Furjan Sub-


Contractor : G.I.T. LLC

Contractor : M/S. Gardinia contracting LLC

Date requested prepared: - - 2023 Insp. Request reference: Rev.No.


Work to be inspected:
Location:
Drawing/photos attached This inspection requires the following disciplines:

Spec. Ref: Architect Inspector

Structural Eng. QA/QC

BOQ Ref. (if available): Mechanical Engineer Surveyor

Date / time required: - -2023, AM/PM Electrical Engineer --------------------


Details of work done:

Contractors Comments:

Status:
A Reviewed B Reviewed with comments C Revised and resubmit D Rejected

Project Manager: Date: Engineer: Date

You might also like