150002D Work Inspection Request

This document is a Work Inspection Request for Gypsum Finishing work at Birla Vanya, Shahad, submitted by ZAHRA Interiors Pvt Ltd. The inspection is scheduled for December 15, 2022, at 10:30 AM for Tower F, covering specific areas like the Staircase and Lift Lobby. The request includes certification of coordination with subcontractors and outlines the inspection process and results.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views1 page

150002D Work Inspection Request

This document is a Work Inspection Request for Gypsum Finishing work at Birla Vanya, Shahad, submitted by ZAHRA Interiors Pvt Ltd. The inspection is scheduled for December 15, 2022, at 10:30 AM for Tower F, covering specific areas like the Staircase and Lift Lobby. The request includes certification of coordination with subcontractors and outlines the inspection process and results.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

WORK INSPECTION REQUEST

BIRLA VANYA,SHAHAD
DATE :

Package Title: Gypsum Finishing work Number: 190460 - ZAHRA - CV - WIR - 002
Package No: Date: 14-Dec-2022
Contractor: ZAHRA INTERIORS PVT LTD. Previous Request No.:
DESCRIPTION OF WORK INSPECTION (Input by The Contractor)
To: M/S TURNER PROJECT MANAGEMENT PVT LTD.
Inspection Level
Tower F Typical 1 Witness □ Inspection □

TYPE Works involve Gypsum Level pad & right to check


INSPECTION DATE
15-Dec-2022 INSPECTION TIME 10:30 AM
Drawing Ref.
Specs Staircase & Lift Lobby
Zone
Building Tower F
The following items are ready for your inspection with details as below:
No. Description Date Time MAT No. MIR No. ITP Ref.
Tower F TYP 1 Level pad inspection Staircase 190460-ZAHRA- 190460-ZAHRA-
1 2 & Typical 3 Lift Lobby 15-Dec-2022 10:30 AM CV-DSH-001 CV-MIR-001

We certify that the above items have been coordinated with the following Subcontractors and other relevant packages.
Electrical Mechanical Vert. Trans. Façade ID Others
DATE
Note: All requests must be submitted at least 24
hours prior to the required inspection or test
SAFETY ENGINEER QUALITY

INSPECTION RESULT (Input by Inspector)

Received Date: Time: Receiver's signature:


A - Approved B - Approved with comments C - Rejected & Resubmit
Comments:

SAFETY ENGINEER
TURNER
The Employer's Engineer/Consultant returns hereby this RFI. Approval by the Engineer/Consultant shall not be construed to imply acceptance of the inspected works by the Employer's Engineer/Consultant, not shall it release the
Contractor of its obligations and Liabilities under the Contract.

RECEIVED BY CONTRACTOR
Responses:

SIGNATURE DATE

150002D
January 2019
R00 PAGE | 1