Professional Documents
Culture Documents
Ceb4 Co DWG Pac 00 Lucf PLF 002 WB01 002
Ceb4 Co DWG Pac 00 Lucf PLF 002 WB01 002
Kilometraj
road passage
existing
level crossing
design line
Designed overpass
S60-760-1:14
Ax halta / HALT Axis
SUPRAINALTARE / CANT
Schimbator de cale ferata / Railway turnout
Trecere la nivel dezafectata /
Pasaj rutier existent / Existing
RACORDARE VERTICALA
621+400
621400.00 -0.96 217.67 216.71
SPRE CLUJ
621460.00 -0.63 217.12 216.49
01
Spre Cluj
621480.00 -1.84 218.26 216.42
EL
TV
BV
RV
DG
KM
LVC
621+500
621500.00 -1.26 217.60 216.34
RV3
Km 621+510
02
621520.00 -0.07 216.36 216.29
1.85‰
0.000
0.000
0.000
0.000
216.310
621508.435
03
621580.00 0.04 216.14 216.18
FIR
FIR
I
II
621+600
621600.00 216.14 216.14
04
621620.00 0.29 215.81 216.10
NSS proiectat
Designed Top of Rail
621640.00 0.25 215.82 216.07
05
621680.00 0.37 215.62 215.99
621+700
621700.00 -0.36 216.32 215.96
P=-1.85‰
06
621720.00 0.37 215.55 215.92
D=-0.740 L=400.000
1
3
5
0.19 215.67 215.86
7
9
11
621760.00 0.04 215.80 215.84
07
Km 621+769
4
5
7
8
II
6
III
STATIA
0.24
TILEAGD
621780.00 215.57 215.81
14
12
6
8
621+800
621800.00 0.11 215.66 215.77
4
2
621820.00 0.26 215.47 215.73
08
621840.00 0.18 215.52 215.70
09
TV
BV
RV
DG
KM
LVC
621+900
11
FIR
622+000
-0.62
I
+622+147
0.33 215.10 215.43
BRIDGE
POD
622160.00 1.00 214.42 215.42 km pr.622+158
km ex. 622+224
214.61
+622+170
3
622+200
9
11
II
III
STATIA
18
16
OSORHEI
16
-1.17
LONGITUDINAL DRAINS / DRENURI LONGITUDINALE
SEMNAL INTRARE
622340.00 -0.05 215.36 215.31 HOME SIGNAL
18
km pr. 622+350
Km 622+350
FIR
FIR
5
37
41
39
8
9
10
4
5
7
6
III
II
1
19
622+400
10
8
6
4
20
2
STATIA / STATION PO TETCHEA
5
FIR
622+500
0.59
FIR
Km 622+500
I
II
9
11
km pr. 622+500
13
SEMNAL INTRARE
27
19
HOME SIGNAL
17
km 622+518
km ex. 622+579
1B
2B
7A
6A
VA
43
-0.53
IIIA
64
STATIA
213.44
ORADEA
50
22
81
42
76
14
48
6024
12
10
2
23
622+600
FIR
I
II
0.08
24
215.05 215.13
3
Designed Top of Rail
5
9
0.07
11
19
17 21
49
27
III
IV
-0.15
2
215.22 215.07
26
9
14
10
12
13
7
11
STATIA
EPISCOPIA BIHOR
40
24
32
14
4
2
622+800
0.02
27
EL= 214.921
EL
TV
BV
RV
DG
KM
KM= 622+990.685
LVC
623+000
KM= 623+026.185
L= 5208.64
623+100
Verificat
Proiectat
Codificare plansa
Manager de proiect
623+200
1:1000/100
DENUMIRE DESEN:
623+300
Prima editie
EL
TV
BV
RV
DG
KM
LVC
COMENTARII
Railway Concrete ditch
623+400
/ Șanț de b
62340