Department E & PM Department JSA No.

SAFCO-HEBA-JS-01-13
Civil, Electrical & Structural Work For Fire Fightings At
JSA Title Page 1 of 1
SAFCO Buildings& Sub-Stations.
Minimum PPE’s “Safety Helmet, Safety Shoes, Safety Glass (clear glasses), Long sleeves shirt”
JOB SAFETY ANALYSIS Personal Protective Equipment Required & Ready to use / wear working gloves, Face shield, ear plug, dust mask,

√ Revised JSA
Check One New JSA Date; 08.09.2013
Revision#: 0
BASIC JOB STEPS POTENTIAL HAZARDS RECOMMENDATIONS RESPONSIBILITY
1.1 Physical injury.
Use appropriate personnel protective equipments such as safety helmet,
1.2 Tripping, slipping, falling and sliding hazard.
Area occupation, barricading and place sign boards goggles, safety shoes,gloves.Inspect all tools and equipments before starting of
1.3 Toxic
jobs.Work in safe manner.
gases.
2.1 Physical injury.
Use appropriate personnel protective equipments such as safety helmet,
Mobilisation of tools and equipment and materials for the 2.2 Tripping, slipping, falling and sliding hazard.
goggles,safety shoes,gloves.Inspect all tools and equipments before starting of
specific job 2.3
jobs.Work in safe manner.
Toxic gases.
Use appropriate personnel protective equipments such as safety helmet,
3.1 Hand injury.
Preparing tools and equipment goggles,safety shoes,gloves.Inspect all tools and equipments before starting of
3.2 Struck by/caught between,being trapped.
jobs.Work in safe manner.
4.1 Physical injuiry. 4.1 Using all basic PPE's.
4.2 Dust hazard. 4.2 Dust mask.
Asphalt cutting, breaking and disposal 4.3 Noise hazard. 4.3 Ear plug.
4.4 Electrical shock,fire & burns. 4.4 Inspected electric jack hammer,electrical extension
cable(leak proof/insulated),updated FE,assign appropriate personnel.
5.1 Hand injuiry 5.1 Hand glooves with baisc PPE's.
Excavation mannually for direct burried cable, const of duct bank,
5.2 Slip.trip & falls. 5.2 Barricade excavation area with warning sign.
foundation of cylinder.
5.3 Dust hazard. 5.3 Dust musk.
6.1 Hand injuiry. 6.1 Working glooves with basic PPE's.
6.2 Slip,trip,falls. 6.2 Mobile scaffolding with full body harness for working at height certified by
Backfilling, compaction for direct burried cable, const of duct bank, 6.3 Noise hazard. scaffolding inspector. CONTRACTOR
foundation of cylinder. 6.4 Health hazard. 6.3 Ear plug.
6.4 Dust musk will use to prevent associated hazards.
Supply of PE Sheet, full RCC of duct bank, cylinder 7.1 Hand injuiry. 7.1 Using all basic PPE's.
foundation,grade slab, ramp & cirb wall including form work, re-bar 7.2 Health hazard 7.2 Dust musk,ear plug,safety googles
(epoxy coated) and concrete pouring with curing.
8.1 Hand injuiry. 8.1 Using all basic PPE's.
Supply & installation of joint sealant, filler board and primer at 8.2 Dust hazard. 8.2 Using dust Musk.
contruction joint at concrete surface. 8.3 Health hazard. 8.3 Using dust Musk with full cover all for avoiding chemical to
9.1 Physical injuiry. skin contact.
9.1 Using all basic PPE's.
Providing fabrication, installating framed steel structure for cylinder 9.2 Dust hazard. 9.2 Dust mask.
rooms - generator rooms & substation as per drawing including 9.3 Noise hazard. 9.3 Ear plug.
columns, beams, channels & accessoreis. 9.4 Electrical shock,fire & burns. 9.4 Inspected welding machines,electrical extension
cable(leak proof/insulated),updated FE,assign appropriate personnel.
10.1 Physical injuiry. 10.1 Using all basic PPE's.
10.2 Dust hazard. 10.2 Dust mask.
Providing & installing flourecent lamps including internal wiring, 10.3 Noise hazard. 10.3 Ear plug.
cabling, switches box/outlet, RGS conduits & fittings as blast proof. 10.4 Electrical shock,fire & burns. 10.4 Inspected electric drill,electrical extension cable(leak
proof/insulated),updated FE,assign appropriate personnel.
Prepared by: HEBA Date:
08.09.2013
Checked by : Date: