JOB SAFETY ANALYSIS

Date: Rev: 0 Task Analysis, Form A - Task Description Page 1 of


Prepared by:
Plant: Department: Section: Reviewed By: Review Date:
Job Description:

Job Function Description


# of people involved in Operating Environment When is task Where is the task Personal protective
task Performed? performed? equipment in addition to
normal issue?
Extreme Temperatures? Indoor? Describe:
High winds? Day Only? Outdoor?
High vibration? 24 hours shift?
Poor lighting?
High noise?
Communication Frequency Vision
Verbal Hourly - Yearly - Need to View Controls and/or Displays? Yes - No
Radio Daily - As Needed - Describe:
None - Monthly -
Who with?
Rescue:

Review Checklist
Review Item [Insert sketch, drawing or model of area (attach drawings if applicable)]
1. Job Package.

Need Analysis (Highlights) YES NO


JOB SAFETY ANALYSIS

Date: Rev: 0 Task Analysis, Form B - Results Analysis Page 2 of 2


Prepared by: Rev 2 Date:
Plant: Department: Section: Reviewed By: Review Date:
Job Description: (Installation of Fire alarm) Electrical Activities
Activity Error Possibility and Consequences Ergonomic / Human Potential Solution / Mitigation Resp.
Factors concern
 Electric shock / electrocution  Ensure equipment is properly isolated; circuit isolating
 Hand injury due to sharp edges / objects device and local/remote control switch are lock-out / tag
Installation of cable out.
 Wear hand gloves.

Disconnect /re-connect  Expose to stored pressure  Ensure lines are properly isolated & tagged.
instruments by using Hand  Hand & body injury due to improper use  Use hand gloves and avoid pinch point.
tools. of tools; incorrect position.  Use the right and correct size of tools;
 Caught in between established/correct position and good footing.
 Contact with sharp edges / surfaces.

 Ensure and double check the right equipment to be


isolated; Install individual lock and Tag; fill out lockout &
Isolated power supply for Fir  Isolation failure tag out log sheet.
Alarm system  Always consider electric equipment as LIVE until
 Electric shock/electrocution established that it is DEENERGIZED.
 Use suitable insulated rubber gloves while operating the
 Hand Injury switch gear; use grounding stick.
 Only authorized electrical personnel to isolate the
equipment.
 Avoid pinch point.
 Wear appropriate hand protection.
 Use the right and correct size of tools; correct position
and good footing.

Termination of cables Exposure of workers to various hazard like Ensure workers are complying with the min. PPE req. Safety
hand injury, dust, eye injury. shoes, helmet, safety glass, dust mask,
JOB SAFETY ANALYSIS

Unauthorized tools used. Prior to mobilize the tools must be inspected and colour
ceded.

Unskilled and unindicted personnel Ensure that toolbox meeting was regularly conducted and
starting the job. people are aware of the job and the hazard enclosed in the
job they are performing.
Wear rubber gloves.
Use of Power Tools Electric Shock
All power tools should be inspected before use.

Tools should have dead man switch.

Should be double isolated.


Use of Hand tools Hand Injury  Only tools that are in good condition shall be used.
 Use correct size of tools
 Wear hand gloves
 Correct position should be observed to have a good footing.

 Avoid pinch points.


 Using cheater bar (extension bar/pipe) is prohibited

 Use non-sparking tools


 If could not be avoided to use sparking tools, secure Hot
work permit.

Aft
Demobilization After completion the job, area must be cleaned and tidy.
Poor housekeeping