DAVR External

PRE-COMMISSIONING Services
&
COMMISSIONING

1
GENERAL CHECKS

 Ensure proper earthing of panel body and electronic


earthing
 Electronic earthing should be separate earth pit
 Earth pit resistance should be less than 0.5 Ohm
 Physical tight of all components and terminations in
Panel uncharged condition
 Ensure tightness of system cable at the back end of
swing frame and pulse cables
 Screen cables should be grounded at only one end
 Ensure proper phase sequence and magnitude for AC
power supply feeders and polarity of DC supplies

2
CHECKING SETTING

 Check all the switch & jumper setting as per test


report

3
UN0661 INTERRUPT GENERATOR MODULE

4
CHANNEL CONFIGURATION

 SINGLE AUTO-SINGLE MANUAL


 DUAL AUTO-SINGLE MANUAL
 DUAL AUTO-INBUILT MANUAL (etc.)
 AT OPAL
 DUAL AUTO-INBUILT MANUAL
 MAX-DNA H/W CONFIGURATION
 REDUNDANT DPUs
 NO REDUNDANT HARDWARE
 THYRISTOR BRIDGE
 FULLY REDUNDANT
5
SWING FRAME

6
BACK PLANE OF REGULATION
AUTO CHANNEL RACK

First Half of the rack is reserved


for Data bus, Address bus &
AA Rack
Power supply bus.

69 65 61 57 53 49 ……37 ……. 1

Second Half of the rack is


reserved for Input & Outputs
extended using system cables
usually (9 pin , 21 pin connector)

7
65
C B A
1 1 1
2 2 2
3 An example of a system
3 3
. cable connector is
. .
. AA-X65 -2a26
. .
. . .
Complete view
of Back plane
connector PIN
NO.

. . . MODULE NO. FOR


CONNECTOR
. . . RACK LOCATION
. . . NO.
26 26 26
. . .
. . .
. . .
. . .
31 31 31
32 32 32
8
ACTUAL VIEW OF THE BACK SIDE
OF RACK

9
FRONT VIEW OF RACK

10
PANEL CHARGING

Note: Don’t Energize the panel without checking for


short circuit, loose connections, voltage level, polarity
of signal and phase sequence etc.
 Charge feeders one by one and measure voltage
level at every test socket and input output of the
device
 Single phase AC feeder
 DC feeder
 Three phase AC feeder
 UPS feeder

11
CONTD..

 Prior to charging of swing frame and Max rack


isolate all the modules other than power supply
modules, these modules to be inserted back once it’s
ensured that the voltage level at test sockets is with
acceptable limits
 It’s a good practice to tabulate all the values for
future records

12
PRE-COMMISSIONING

 Establish PC/Laptop communication with DPU’s


 Ensure Max I/O cards healthiness with a continuously
LED glowing green at the bottom of the card named
Active.
 If any card is found blinking check the card address with
the software
 Check software setting as per test report in micro-
terminal
 Enter the address in test report and press RET to check
the values
 For any changing any of the value
 Use <-> cursor to move the pointer to the setting value
(cursor will blink) enter the new value Press SHIFT -
>WRITE->RET

13
MICRO-TERMINAL

14
PRE-COMMISSIONING

 Simulation of fault Indications


 To be done by simulation / actual operation
 Confirms the correctness, tightness of internal wiring /
External field wiring (ANNUNCIATION FACIA / UCD)
 Correctness of DTAG assigned to LED in indications page in
HMI
 Simulation of GRP /GOVERNOR POTENTIAL FREE CONTACTS
(PT FUSE FAIL, ULR (86) SET, ULR RESET, GCB ON / OFF &
Speed > 90%)
 Make through the permissive for field breaker closing
 In case of Retrofitting / R&M jobs it is good practice to
check the FB on command by connecting a lamp in place of
FB closing coil. This will ensure no continuous commands is
persisting at Closing coil, which is not desired.

15
CONTD..

 Switch S20 in Test Position


 Ensure Excitation ON permit is Green on the
Excitation Command Block
 Make Excitation ON and Check for Firing pulse at
Digital firing module (UN0663), pulse Final stage
module and record the magnitude and pulse width
 Ensure double firing pulses at every socket.
 Expected width of pulse 180-200µSec.
 Check for all the tripping logics(COMMON ALARM
STAGE 3) as per scheme

16
17
18
19
DOUBLE FIRING PULSE

20
SHAPE OF THE PULSE AT PULSE
FINAL STAGE

21
PULSE SEQUENCE
24V 1R+
0V 0° 60° 360°
2T-
60° 120°
3S+
120° 180°
4R-

180° 240°
5T+
240° 300°
6S-

300° 360° / 0°
DOUBLE PULSES ARE REQUIRED FOR SIMULTANEOUS FIRING OF
ONE POSITIVE ARM AND ONE NEGATIVE ARM OF THYRISTOR BRIDGE
22
INPUT AND OUTPUT WAVE FORM
FOR FIRING ANGLE = 0 DEGREES 23
SECONDARY INJECTION

 Inject Rated Secondary Generator Current & Voltage observe


the values in micro-terminal
 Igac should be 100%, if huge variation is there burden resistor
in UNC4660 V & I measuring module requires calibration.
 Ugac should be 100%, it can be adjusted by using Ur,Us,Ut POT
in UN0661 module
 Interrupt generator Module test Points
 Adjust U1 such that at rated voltage it is 1.4 VDC
 Adjust U2 such that at rated voltage it is 0.7 VDC
 Record the values of P, Q and Cos(phi)
 Vary the Phase angle and check the correctness of the values
as per values injected
 Field current calibration using rated secondary injection
 Ifac should be 100%, if huge variation is there burden resistor
in UNC4660 V & I measuring module requires calibration.
NOTE:- During injection obser ve the values recorded in HMI and do correction
if necessar y
24
SIGNAL FLOW OF AUTO CHANNEL UP TO THY GATE

UN0809/UN0097
UN0661

UN0610
UNC4660

UNO663

UN0096
CENTRAL PROCESSING
UNIT
R+
U G R,S,T 110VAC 22V AC 4.37V AC

ANALOG SIGNALS

AUTO CHANNEL PARAMETERS


& 7V DC

UC
T-

INTERRUPT GENERATOR
Usync R,S,T 110VAC 22V AC

PULSE INTERM STAGE


S+

GATE CONTROL UNIT


ANALOG I/P MODULE

PULSE FNL STAGE


IG R,S,T 3V AC 5V AC
R-

BINARY SIGNALS
A/D CONVERTER
& 7V DC

HIER 452555 R2
I f from CT 3V DC 3V DC T+
AT RATED

xxxx KDVR
S-

EMPTY

RAM
CHNL BLOCK

UNO662
BRIDGE BLOCK

R+ PULSE
DEVICE TRANS-
FORMER
FROM/TO
UN0662 OF PLC FUNCTION
DIGITAL INPUT/OUTPUT

25
LIGHT LOAD TEST

 SELECT SWITCH S865/1 to position 1 in UN0663


module, LED 4 glows
 Connect Load Across AVR output terminal eg:- bulb
load, heater load or rheostat
 Incase of SEE charge excitation transformer with
auxiliary supply
 Ensure correct phase sequence of input supply
connected at PMG terminals, the magnitude of input
supply should not be more than rated PMG voltage
 Ensure Usync LED is not glowing and measure Ur,Us,
Ut socket voltage at UN0663 modules
 Switch ON FB and Excitation from LOCAL
26
CONTD…

 Vary the firing angle of selected channel by using


HIGHER/LOWER push button on respective UN0663
modules
 Tabulate the Uc, AVR output and If at shunt, micro-
terminal and HMI
 Observe the AVR output waveform using an oscilloscope
 Incase of non-availability of oscilloscope, the correctness
of the output can be assessed using a Multimeter in
Frequency Mode. Healthy bridge output will read 300 Hz
with 50 Hz test supply.
 Incase of Pulse missing or non conduction of thyristor,
the frequency will be read <300 Hz.
27
MRPL
S

+260
FV(CH1)[V]

CH1
FV (CH1) [V]
-740

0s 2.5ms 5ms 7.5ms 10ms 12.5ms 15ms 17.5ms 20ms 22.5ms

28
MRPL_GTG#1
S

+186
R(CH1)[V]

CH1
R (CH1) [V]
-14

0s 5ms 10ms 15ms 20ms 25ms 30ms 35ms 40ms 45ms

FAULTY AVR OUTPUT DURING LIGHT LOAD TEST DUE TO G-K


INTERCHANGE AT THY-1 IN THE BRIDGE 29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
LIGHT LOAD TEST

 Ensure the reading of If, Field Voltage in control


room during light load
 Check all the control room operation and any system
interlocks

44
M/C AT RATED SPEED

 Check phase sequence of PMG supply at DVR end


 It’s good practice to do light load test with PMG
supply also
 Disconnect the load and connect exciter terminals
and vary excitation as per requirement for SCC and
OCC test of Generator
 During SCC and OCC record the reading at TBs,micro-
terminal, HMI and meters and cross check the values
with GRP reading
N OTE : - Inca s e o f S EE , a load to b e conn ected in pa ra ll e l wi t h t h e Ro to r fo r
e n a b l i n g l a t c h i ng o f t h e T hy ri s tor s

45
VOLTAGE BUILT-UP & PID
TUNING
 Normalize the modifications carried out during SCC and
OCC
 Change S865/1 to position 0 in UN0663 modules
 Incase of SEE normalize Field flashing, Excitation
Transformer connections also
 Excitation ON can be done in manual channel
 Ensure follow-up and null balance at zero, change over to
auto
 Conduct step-test and fine tune the PID parameters if
necessary
 Voltage build-up to be done in all the channels
 Change over to should be bump less

46
RUPPL-DAHEJ(GT#5)
S
+10
+4.65
+8.1
+7.5
Uref(CH1)[V]
Uact(CH2)[V]
Ifac(CH3)[V]
CH1 Uc(CH4)[V]
CH2

CH4
Uact (CH2) [V]
Uref (CH1) [V]
Ifac (CH3) [V]
Uc (CH4) [V]

CH3
-350m

+2.5
-1.9
-10

0s 2s 4s 6s 8s 10s 12s 14s 16s 18s 20s 22s

VOLTAGE BUILDUP IN AUTO CHANNEL-1 WITH OLD PID VALUES


Vo=70 P.U; Vp1=10 P.U; Vp2=15 P.U; V∞=15 P.U; Ta= 1.0 Sec; Tb=0.2 Sec; Pl+=6.8 P.U 47
RUPPL-DAHEJ(GT#5)
S S
+10
+2.275
+7.75
+7.2
Uref(CH1)[V]
Uact(CH2)[V]
Ifac(CH3)[V]
Uc(CH4)[V]

CH1

CH2
Uact (CH2) [V]
Uref (CH1) [V]
Ifac (CH3) [V]
Uc (CH4) [V]

CH3

CH4
-225m
+2.75
+2.2
0

0s 2s 4s 6s 8s 10s 12s 14s 16s 18s 20s 22s

±10% Uref step from 95% to 105% IN AUTO CHANNEL-1 WITH OLD PID VALUES
Vo=70 P.U; Vp1=10 P.U; Vp2=15 P.U; V∞=15 P.U; Ta= 1.0 Sec; Tb=0.2 Sec; Pl+=6.8 P.U 48
RUPPL-DAHEJ(GT#5)
S S
+3.35
+17.8

+9.2
+7.6
Uref(CH1)[V]
Uact(CH2)[V]
Ifac(CH3)[V]
Uc(CH4)[V]
CH1

CH2
Uact (CH2) [V]
Uref (CH1) [V]
Ifac (CH3) [V]
Uc (CH4) [V]

CH3

CH4
-800m
-1.65
-2.2

-2.4

0s 2s 4s 6s 8s 10s 12s 14s 16s 18s 20s 22s

±10% Uref step from 95% to 105% IN AUTO CHANNEL-1 WITH FINAL PID VALUES
Vo=200 P.U; Vp1=6 P.U;Vp2=6 P.U;V∞=25 P.U; Ta= 2 Sec; Tb=0.6 Sec; Pl+=7.5 P.U 49
RUPPL-DAHEJ(GT#5)
S
+15.4
+3.1
+8.8
+8
Uref(CH1)[V]
Uact(CH2)[V]
Ifac(CH3)[V]
CH1 Uc(CH4)[V]

CH2
Uact (CH2) [V]
Uref (CH1) [V]
Ifac (CH3) [V]
Uc (CH4) [V]

CH3

CH4
-4.6
-1.9
-1.2
-2

0s 2s 4s 6s 8s 10s 12s 14s 16s 18s 20s 22s

VOLTAGE BUILDUP IN AUTO CHANNEL-1 WITH NEW / FINAL PID VALUES


Vo=200 P.U; Vp1=6 P.U;Vp2=6 P.U;V∞=25 P.U; Ta= 2 Sec; Tb=0.6 Sec; Pl+=7.5 P.U 50
V/HZ LIMITER

 Record
 Uref = ______%
 Uact = ______%
 Frequency at address F8B0 =_____ Hz
 So present V/F ratio is: ________
 Now call address F280 and change it from 115 % to
100 or 95%.
 Check the performance and operation of limiter

51
SYNCHRONIZING

 Synchronize the machine


 Ensure GCB close F/B is ON and GCB OFF F/B is OFF
 Observe the values of P, Q & cos(phi) in micro-
terminal, HMI and compare with GRP values
NOTE:- P should be positive in sign
 Operating Modes
 Voltage controller- droop on reactive current
 PF regulator
 MVAR regulator

52
GENERATOR CAPABILITY CURVE

53
GENERATOR CAPABILITY CURVE

54
LIMITERS

OVER EXCITATION LIMITERS (OEL)


FIELD CURRENT LIMITER
GENERATOR CURRENT INDUCTIVE LIMITER

UNDER EXCITATION LIMITERS (UEL)


GENERATOR CURRENT CAPACITIVE LIMITER
LOAD ANGLE LIMITER

 V/Hz LIMITER

55
FIELD CURRENT LIMITER

56
FIELD CURRENT LIMITER (OEL)

57
PSS EXPLAINED…

 A synchronous generator (or motor) working with grid is


susceptible to oscillation
 The magnetic field of rotor and stator form angle called
load angle.
 In steady state condition it is constant and has a value
ensuring balance between mechanical driving torque and
electrical o/p torque. Enables synchronous operation or
provides synchronising torque
 If any disturbance displaces load angle the the electrical
torque changes and brings the load angle for equilibrium
position of machine.

58
PSS CONTD …

 Due to inertia of the machine this can take place


aperiodically in the form of more or less well damped
oscillations
 To damp the oscillations damping torque is required.
 The damping torque has to be proportional to difference
between actual and synchronous speed i.e., slip.
 The damper windings provide this torque.
 PSS provides supplementary signal

59
P-DELTA CURVE

60
ONLINE CHECKS OF PSS-OFF

61
ONLINE CHECKS OF PSS-ON

62
DETAILED VIEW OF PSS O/P

63
TROUBLE SHOOTING

 The alarms can be traced back by alarm indication page logic


by double click on the LED indication, it’ll be routed to a
trouble-shooting guidelines page
 If any module fails fail LED(RED in color) glows
 Change the module from spares and ensure all jumper setting
as same as old module or test report
 If CPU module Change the IC at location A735,A736,A738 and
A739 from old module to new module
 Check the software parameters as per test report
 While changing UNC4660 module the old resistance values
need to be retained in new modules

NOTE:- The IC at location A735 and A736 are specific for a project
and module location (the location will be marked on the IC)

64