Professional Documents
Culture Documents
PRE-COMMISSIONING Services
&
COMMISSIONING
1
GENERAL CHECKS
2
CHECKING SETTING
3
UN0661 INTERRUPT GENERATOR MODULE
4
CHANNEL CONFIGURATION
6
BACK PLANE OF REGULATION
AUTO CHANNEL RACK
69 65 61 57 53 49 ……37 ……. 1
7
65
C B A
1 1 1
2 2 2
3 An example of a system
3 3
. cable connector is
. .
. AA-X65 -2a26
. .
. . .
Complete view
of Back plane
connector PIN
NO.
9
FRONT VIEW OF RACK
10
PANEL CHARGING
11
CONTD..
12
PRE-COMMISSIONING
13
MICRO-TERMINAL
14
PRE-COMMISSIONING
15
CONTD..
16
17
18
19
DOUBLE FIRING PULSE
20
SHAPE OF THE PULSE AT PULSE
FINAL STAGE
21
PULSE SEQUENCE
24V 1R+
0V 0° 60° 360°
2T-
60° 120°
3S+
120° 180°
4R-
180° 240°
5T+
240° 300°
6S-
300° 360° / 0°
DOUBLE PULSES ARE REQUIRED FOR SIMULTANEOUS FIRING OF
ONE POSITIVE ARM AND ONE NEGATIVE ARM OF THYRISTOR BRIDGE
22
INPUT AND OUTPUT WAVE FORM
FOR FIRING ANGLE = 0 DEGREES 23
SECONDARY INJECTION
UN0809/UN0097
UN0661
UN0610
UNC4660
UNO663
UN0096
CENTRAL PROCESSING
UNIT
R+
U G R,S,T 110VAC 22V AC 4.37V AC
ANALOG SIGNALS
UC
T-
INTERRUPT GENERATOR
Usync R,S,T 110VAC 22V AC
BINARY SIGNALS
A/D CONVERTER
& 7V DC
HIER 452555 R2
I f from CT 3V DC 3V DC T+
AT RATED
xxxx KDVR
S-
EMPTY
RAM
CHNL BLOCK
UNO662
BRIDGE BLOCK
R+ PULSE
DEVICE TRANS-
FORMER
FROM/TO
UN0662 OF PLC FUNCTION
DIGITAL INPUT/OUTPUT
25
LIGHT LOAD TEST
+260
FV(CH1)[V]
CH1
FV (CH1) [V]
-740
28
MRPL_GTG#1
S
+186
R(CH1)[V]
CH1
R (CH1) [V]
-14
44
M/C AT RATED SPEED
45
VOLTAGE BUILT-UP & PID
TUNING
Normalize the modifications carried out during SCC and
OCC
Change S865/1 to position 0 in UN0663 modules
Incase of SEE normalize Field flashing, Excitation
Transformer connections also
Excitation ON can be done in manual channel
Ensure follow-up and null balance at zero, change over to
auto
Conduct step-test and fine tune the PID parameters if
necessary
Voltage build-up to be done in all the channels
Change over to should be bump less
46
RUPPL-DAHEJ(GT#5)
S
+10
+4.65
+8.1
+7.5
Uref(CH1)[V]
Uact(CH2)[V]
Ifac(CH3)[V]
CH1 Uc(CH4)[V]
CH2
CH4
Uact (CH2) [V]
Uref (CH1) [V]
Ifac (CH3) [V]
Uc (CH4) [V]
CH3
-350m
+2.5
-1.9
-10
CH1
CH2
Uact (CH2) [V]
Uref (CH1) [V]
Ifac (CH3) [V]
Uc (CH4) [V]
CH3
CH4
-225m
+2.75
+2.2
0
±10% Uref step from 95% to 105% IN AUTO CHANNEL-1 WITH OLD PID VALUES
Vo=70 P.U; Vp1=10 P.U; Vp2=15 P.U; V∞=15 P.U; Ta= 1.0 Sec; Tb=0.2 Sec; Pl+=6.8 P.U 48
RUPPL-DAHEJ(GT#5)
S S
+3.35
+17.8
+9.2
+7.6
Uref(CH1)[V]
Uact(CH2)[V]
Ifac(CH3)[V]
Uc(CH4)[V]
CH1
CH2
Uact (CH2) [V]
Uref (CH1) [V]
Ifac (CH3) [V]
Uc (CH4) [V]
CH3
CH4
-800m
-1.65
-2.2
-2.4
±10% Uref step from 95% to 105% IN AUTO CHANNEL-1 WITH FINAL PID VALUES
Vo=200 P.U; Vp1=6 P.U;Vp2=6 P.U;V∞=25 P.U; Ta= 2 Sec; Tb=0.6 Sec; Pl+=7.5 P.U 49
RUPPL-DAHEJ(GT#5)
S
+15.4
+3.1
+8.8
+8
Uref(CH1)[V]
Uact(CH2)[V]
Ifac(CH3)[V]
CH1 Uc(CH4)[V]
CH2
Uact (CH2) [V]
Uref (CH1) [V]
Ifac (CH3) [V]
Uc (CH4) [V]
CH3
CH4
-4.6
-1.9
-1.2
-2
Record
Uref = ______%
Uact = ______%
Frequency at address F8B0 =_____ Hz
So present V/F ratio is: ________
Now call address F280 and change it from 115 % to
100 or 95%.
Check the performance and operation of limiter
51
SYNCHRONIZING
52
GENERATOR CAPABILITY CURVE
53
GENERATOR CAPABILITY CURVE
54
LIMITERS
V/Hz LIMITER
55
FIELD CURRENT LIMITER
56
FIELD CURRENT LIMITER (OEL)
57
PSS EXPLAINED…
58
PSS CONTD …
59
P-DELTA CURVE
60
ONLINE CHECKS OF PSS-OFF
61
ONLINE CHECKS OF PSS-ON
62
DETAILED VIEW OF PSS O/P
63
TROUBLE SHOOTING
NOTE:- The IC at location A735 and A736 are specific for a project
and module location (the location will be marked on the IC)
64
65