1.0 INTRODUCTION:
INTRODUCTION: chemical and mechanical treatment
is also required while the generator
The trend towards higher and is in service.
higher generator ratings
necessitates intensive cooling of 2.0 DESIGN CRITERIA:
the conducting components. This is
achieved by the use of water as the 2.1 PRESSURE
cooling medium, because water has The primary water system for the
a particularly high heat removal generator is designed for a gauge
2
capacity and easy availability. The pressure of 10 kg/cm . In some
water used for direct cooling of the regions, however special pressure
current carrying parts of the conditions apply. In the stator
generator is referred to as
It must not be used directly or indirectly in any way detrimental to the interest of the company
turbine generator set with a delay ensure trouble free operation of the
of 60sec. Operating value of generator. An automatic control
3
Primary water flow is 125m /hr. circuit ensures that if one of the
two pumps becomes unavailable,
COPYRIGHT AND CONFIDENTIAL
is passed via coolers and filters to (MKF01 BB001) and deliver the
the water ring manifold inside the water to (2 x 100 % duty) primary
generator and to the bushings. water cooler units (MKF21 AC001
When the water has fulfilled its & MKF22 AC001). In these Primary
COPYRIGHT AND CONFIDENTIAL
Page 6 of 10
PROJECT NAME: 1X660 MW BHUSAWAL THERMAL POWER STATION, MAHARASHTRA
REV. 01 DATE: 03.10.2020
level detector. A CO2 absorber in After the pump has been stopped
the air supply line removes carbon on account of one of these
dioxide in the inlet air and prevents conditions, the conductivity of the
the formation of carbonates in the water promptly decreases by action
NaOH solution. The tank has a of the Ion exchanger. The
capacity to store sodium hydroxide Alkalyser Unit provides warning
solution required for a service alarms in the following events by
period of a few months. displaying them on HMI:
Page 8 of 10
PROJECT NAME: 1X660 MW BHUSAWAL THERMAL POWER STATION, MAHARASHTRA
REV. 01 DATE: 03.10.2020
(i) Entire primary water circuit in such a way that the flow in the
3
filled. circuit doesn't fall below 100m /hr
(ii) All instrumentation, including (trip set point) from the time of
protection and alarm circuits, sensing set pressure till the pump
operative. accelerates to deliver flow above
(iii) Generator filled with hydrogen 3
100m /hr. The conductivity of the
to nominal pressure.
primary water rises when the
(iv) Primary water heat exchangers
resins of the ion exchanger are
filled and vented.
used up. To rectify this condition,
(v) Primary water cold end
the water treatment plant is to be
temperature at least 5 K higher
taken out of operation and the
than the temperature of the cold
resins replaced. The generator may
gas.
It must not be used directly or indirectly in any way detrimental to the interest of the company
3.4.5 TRIPS
**********************************
Page 10 of 10
PROJECT NAME: 1X660 MW BHUSAWAL THERMAL POWER STATION, MAHARASHTRA