You are on page 1of 11

REV. 01 DATE: 03.10.

2020

WRITE UP OF GENERATOR PRIMARY WATER


(PW) SYSTEM
BHEL DOC. NO. TGE-3668

1.0 INTRODUCTION:
INTRODUCTION: chemical and mechanical treatment
is also required while the generator
The trend towards higher and is in service.
higher generator ratings
necessitates intensive cooling of 2.0 DESIGN CRITERIA:
the conducting components. This is
achieved by the use of water as the 2.1 PRESSURE
cooling medium, because water has The primary water system for the
a particularly high heat removal generator is designed for a gauge
2
capacity and easy availability. The pressure of 10 kg/cm . In some
water used for direct cooling of the regions, however special pressure
current carrying parts of the conditions apply. In the stator
generator is referred to as
It must not be used directly or indirectly in any way detrimental to the interest of the company

winding, for example, the primary


The information on this document is the property of Bharat Heavy Electricals Limited.

generator primary water. water pressure must be less than


the pressure of the hydrogen in the
REFERENCE generator casing, i.e. less than 5
Process and instrumentation 2
COPYRIGHT AND CONFIDENTIAL

kg/cm gauge. In the primary water


diagram for PW System-
cooler, the primary water pressure
01530001137
must be greater than the pressure
of the secondary cooling water.
1.1 REQUIREMENTS AND
FUNCTIONS
2.2 TEMPERATURE
The generator primary water
The service temperature of the
system is required to cool the
overall primary water supply circuit
following generator components:
lies between 48 and 80 °C. The
(i) Stator winding
primary water circuit is cooled to
(ii) Phase connectors, including the
49°C with the aid of the primary
bushings.
water coolers. The cold end
Since primary water is in contact
primary water temperature is
with high voltage carrying parts
monitored and the mechanical
and in some regions is required to
generator protection circuitry trips
flow through extremely narrow
the turbine generator set if
hollow conductors, it requires
generator inlet temperature of
extremely intensive chemical and
primary water exceeds 59 °C.
mechanical treatment. The primary
water is ultra-high purity water
with very low conductivity approx.
1.8 micro siemens/cm. Continuous
Page 1 of 10
PROJECT NAME: 1X660 MW BHUSAWAL THERMAL POWER STATION, MAHARASHTRA
REV. 01 DATE: 03.10.2020

WRITE UP OF GENERATOR PRIMARY WATER


(PW) SYSTEM
BHEL DOC. NO. TGE-3668

2.3 FLOW RATE primary water conductivity remain


The flow rate is a decisive factor in between 1.0 to 2.5 micro
designing to ensure adequate siemens/cm in continuous service.
supply of primary water to the
stator winding, phase connectors 3.0 DESCRIPTION:
DESCRIPTION:
and bushings. These regions are
monitored section by section to 3.1 OVERALL SYSTEM
ensure that the required primary CONFIGURATION
water flow is present at all times. If The primary water required for
the primary water flow rate falls cooling is continuously circulated in
below a certain level (about 80 %), a closed loop by a separately
the mechanical generator installed pump. Two full load
protection circuitry trips the pumping units are provided to
It must not be used directly or indirectly in any way detrimental to the interest of the company
The information on this document is the property of Bharat Heavy Electricals Limited.

turbine generator set with a delay ensure trouble free operation of the
of 60sec. Operating value of generator. An automatic control
3
Primary water flow is 125m /hr. circuit ensures that if one of the
two pumps becomes unavailable,
COPYRIGHT AND CONFIDENTIAL

There will be pre trip alarm if flow


3 the second standby pump is ready
goes less than 112.5 m /hr and
to take over at any time. Each
trips the turbine generator set if
pump is driven by a dedicated
flow decreases to less than 100
3 electric motor. Only copper,
m /hr. Design is based on a stainless steels and similar
maximum primary water flow rate corrosion resistant materials are
3
of 150 m /hr. used throughout the system to rule
Operating value of flow for each out any possibility of corrosion.
3
bushing is 2.7 m /hr. There will be
pre trip alarm if flow goes less than The generator primary water
3 system essentially comprises the
2.26 m /hr and trips the turbine
following components:
generator set if flow decreases to
3 * Primary water tank (MKF01
less than 2.11 m /hr. BB001)
* Primary water pumps (MKF11
2.4 ANALYSIS AP001 & MKF12 AP001)
The primary water has to be * Primary water coolers (MKF21
treated since it comes into contact AC001 & MKF22 AC001)
with the high voltage carrying * Primary water filters (MKF27
stator winding conductor. AT001 & MKF28 AT001)
Continuous treatment ensures a * Fine mesh filter (MKF35 AT011)
Page 2 of 10
PROJECT NAME: 1X660 MW BHUSAWAL THERMAL POWER STATION, MAHARASHTRA
REV. 01 DATE: 03.10.2020

WRITE UP OF GENERATOR PRIMARY WATER


(PW) SYSTEM
BHEL DOC. NO. TGE-3668

* Ion Exchanger (MKF35 AT001) 3.2 INDIVIDUAL SYSTEM


SYSTEM
* NaOH dosing pump (MKF36 CONFIGURATION
AP001) 3.2.1 EXTERNAL COOLING
∗ NaOH Dosing tank (MKF36 CIRCUIT
BB001) The two primary water pumps
∗ CO2 Absorber (MKF36 AT001) (MKF11 AP001 and MKF12
∗ Motorized control valve (PGB33 AP001), only one of which is in
AA151) service at any time, the second
∗ Pipe and its fitting to connect the remaining on standby ready to take
system in closed loop over in the event of mechanical or
electrical failure of pump and motor
The primary water flowing to the set which is running, pump draw
pump from the primary water tank water from the primary water tank
It must not be used directly or indirectly in any way detrimental to the interest of the company
The information on this document is the property of Bharat Heavy Electricals Limited.

is passed via coolers and filters to (MKF01 BB001) and deliver the
the water ring manifold inside the water to (2 x 100 % duty) primary
generator and to the bushings. water cooler units (MKF21 AC001
When the water has fulfilled its & MKF22 AC001). In these Primary
COPYRIGHT AND CONFIDENTIAL

cooling function, it is returned from water coolers, the heat absorbed


the other end of the generator to by the primary water during
the primary water tank and from passage through the generator is
the bushings to the suction line of transferred to the secondary
the pumps. Any hydrogen present coolant. As a rule, only one PW
in P.W. Water is released into P.W. cooler is in service at a time, while
Tank. The primary water tank is to the other cooler remains standby.
be flushed with nitrogen before After passing through the PW
startup and after shutdown of the coolers, the primary water flows
primary water loop. The nitrogen is through the main primary water
supplied from a nitrogen cylinder. filter (MKF27 AT001 & MKF28
The Hydrogen gas in the P.W. Tank AT001).
is vented to atmosphere via a
safety relief valve in the waste gas The quality of the primary water
system. If gas pressure in the tank downstream of the main filter
2
increases from 0.3 kg/cm gauge (MKF27/MKF28 AT001) is
pressure then safety valve releases monitored by a conductivity meter
the gas to waste gas system. (MKF29 CQ011). An alarm is given
if the conductivity reaches greater
than 3 micro siemens/cm and if
conductivity value increase to
Page 3 of 10
PROJECT NAME: 1X660 MW BHUSAWAL THERMAL POWER STATION, MAHARASHTRA
REV. 01 DATE: 03.10.2020

WRITE UP OF GENERATOR PRIMARY WATER


(PW) SYSTEM
BHEL DOC. NO. TGE-3668

greater than 4 micro siemens/cm 3.2.2 INTERNAL COOLING


then flushing with DM water CIRCUIT
recommended. Upstream of the generator, the
cooling water flow is divided into
Downstream of this conductivity two part flows. Part flow (1) cools
meter a small fraction of the total the stator winding. This part flow is
primary coolant flow is first routed to a ring manifold at the
continuously branched off and terminal end of the generator and
passed through ion Exchanger from there via insulating teflon
(MKF35 AT001). The ion hoses to the bars of the stator
exchanger vessel is filled with winding. The cooling water flows
anion and cation exchanger resins through the hollow conductors of
to form a mixed bed. The water the winding bar to the other end of
It must not be used directly or indirectly in any way detrimental to the interest of the company
The information on this document is the property of Bharat Heavy Electricals Limited.

thus treated is then passed through the generator, where it is again


a fine filter (MKF35 AT011), which passed via teflon hoses to a ring
retains any abraded resin particles. manifold and from there back to the
P.W. tank. Since flow is in the same
COPYRIGHT AND CONFIDENTIAL

Downstream of this fine-mesh direction through all bars, the heat


filter, the quality coolant is up of the coolant, and therefore of
monitored by conductivity meter, the bars, is low. This prevents
and an alarm is given if the relative movement between the top
conductivity reaches below 1 micro and bottom bars as a result of
siemens/cm and above 3 micro different degrees of thermal
siemens/cm. Dosing pump will On expansion.
or OFF to maintain the conductivity
between 1-2.5 micro siemens/cm Part flow (2) cools the phase
The treated primary water is then connectors and the bushings. The
returned to the main primary water six bushings and the phase
flow at the suction of the primary connectors arrange so as to form a
water pumps. A dilute 1-2% NaOH ring around the stator end winding
is fed into the bypass circuit after are hydraulically connected in such
ion exchanger with the help of a a way that three parallel flow paths
short stroke diaphragm dosing are formed. The cooling water is
pump. By this a pH level of approx. delivered outside the generator
8.5 is maintained in the main circuit through three bushings and
so as to minimize corrosion effects removed via the other three
on copper. bushings. From there it is returned
to the suction line of the pumps. In
Page 4 of 10
PROJECT NAME: 1X660 MW BHUSAWAL THERMAL POWER STATION, MAHARASHTRA
REV. 01 DATE: 03.10.2020

WRITE UP OF GENERATOR PRIMARY WATER


(PW) SYSTEM
BHEL DOC. NO. TGE-3668

order to keep the temperature of


the primary water as steady as 3.3.1.1 WATER TREATMENT
possible regardless of generator PLANT
output and cold water temperature, The water treatment plant consists
the primary water temperature is of the ion exchanger vessel
automatically controlled by (MKF35 AT001), which is filled
variation of the secondary coolant with anion and cation exchanger
flow rate via motorized control resins to form a mixed bed. A
valve (PGB33 AA151). perforated plate in the lower part
of the exchanger vessel prevents
3.2.3 GAS CIRCUIT the resins from escaping from the
The primary water leaving the vessel into the piping system. A
generator is returned to the fine mesh filter (MKF35 AT011) is
It must not be used directly or indirectly in any way detrimental to the interest of the company
The information on this document is the property of Bharat Heavy Electricals Limited.

primary water tank (MKF01 BB001) provided downstream of the ion


where it is able to release any gas. exchanger vessel with the function
The hydrogen released in this of trapping abraded resin particles
degasification process is passed to entrapped in the primary water. A
COPYRIGHT AND CONFIDENTIAL

the exhaust via a pressure relief differential pressure switch


valve. During the filling and visualizes the degree of plugging of
draining of the primary water tank, the filter and generates an alarm if
nitrogen as an inert gas is used to the differential pressure across the
displace the hydrogen or air filter becomes greater than 0.9
2
present. During normal operation kg/cm . The flow of the water
also the primary water tank will be through the mixed bed is limited in
partially filled with nitrogen at 0.3 both the upward and the downward
2
Kg/cm . directions by the specific density of
the resins on one hand and the flow
3.3 DESCRIPTION OF THE velocity of the primary water
SYSTEM COMPONENTS through the resin bed on the other.
3.3.1 PRIMARY WATER PUMPS A flow meter measures the flow of
AND FILTER UNIT water through the mixed bed.
The primary water pump and filter Downstream of the filter, an orifice
unit comprises the following main plate deflects a part flow of the
components of the primary water water through a conductivity meter,
system: which monitors the effect of the
* Water treatment plant resins. If the conductivity of the
* Primary water pumps primary water exceeds a preset
* Primary water filter limit (greater than 3.0 micro S/Cm),
Page 5 of 10
PROJECT NAME: 1X660 MW BHUSAWAL THERMAL POWER STATION, MAHARASHTRA
REV. 01 DATE: 03.10.2020

WRITE UP OF GENERATOR PRIMARY WATER


(PW) SYSTEM
BHEL DOC. NO. TGE-3668

this conductivity meter generates 3.3.1.3 PRIMARY WATER FILTERS


an alarm. The mixed bed ion (MKF27 AT001 & MKF28
exchanger has a specific capacity AT001)
i.e. its capacity for absorbing the Primary water filter of nominal
ions to be exchanged is limited. bore NB150 and nominal pressure
2
When the resins are used up i.e. 10kg/cm is used for filtering the
when their absorption capacity has demineralised water. The mesh
been exhausted, the resin filling material and mesh size of the filter
must be replaced by new are SS316 and 150μm respectively.
regenerated resins. The resins can A differential pressure switch is
be replaced while the generator also provided across the filter to
remains in service since the measure the DP and give alarm
conductivity of the primary water
It must not be used directly or indirectly in any way detrimental to the interest of the company

when differential pressure greater


The information on this document is the property of Bharat Heavy Electricals Limited.

rises only very slowly even when 2


than 0.9 kg/cm .
the water treatment plant is out of
service.
COPYRIGHT AND CONFIDENTIAL

3.3.2 PRIMARY WATER COOLERS


3.3.1.2 PRIMARY WATER PUMPS
(MKF21 AC001 & MKF22
(MKF11 AP001 & MKF12
AC001)
AP001)
The heat absorbed by the primary
Two full load-pumping units are
water in the generator is
provided to ensure uninterrupted
transferred to the secondary
operation of the generator. Both
coolant in the primary water heat
pumps are of equal operating
exchangers. The primary water
priority and they are operated
heat exchanger consists of two
alternately. Changeover from one
units (2 x 100 % duty). When the
pump to the other is possible at any
plant is in normal full load
time without interrupting primary
operation, one unit is in service at
water circulation. The pump not in
a time while the other unit remains
service at any given time remains
as standby. The primary water heat
as standby, ready to start
exchanger is a counter flow plate
automatically if the pump in service
type heat exchanger.
fails. Manual selection of pumps
will be provided on HMI by BHEL
3.3.3 PRIMARY WATER TANK
EDN Bangalore.
(MKF01 BB001)
The primary water tank is mounted
on rubber metal vibration dampers

Page 6 of 10
PROJECT NAME: 1X660 MW BHUSAWAL THERMAL POWER STATION, MAHARASHTRA
REV. 01 DATE: 03.10.2020

WRITE UP OF GENERATOR PRIMARY WATER


(PW) SYSTEM
BHEL DOC. NO. TGE-3668

on the stator frame. It forms the primary water circuit, where it


point of highest elevation of the remains as dissolved, dissociated
entire primary water circuit. In this sodium hydroxide solution. OH ion
tank, the primary water leaving the concentration determines the pH
stator winding is able to release value. The ion exchanger remains
any gas. The water level in the in service continuously. This
primary water tank is indicated by removes all unwanted ions, e.g. CL
a magnetic type level gauge. (-) and HCO3 (-) from the water as
Capacitance type water level well as Na (+) ions from the
sensors are provided for sodium hydroxide solution. This
annunciation purposes, should the elimination of sodium that is
water level rise or drop to its proportional to the volumetric flow
allowable maximum or minimum
It must not be used directly or indirectly in any way detrimental to the interest of the company

rate of water through the Ion


The information on this document is the property of Bharat Heavy Electricals Limited.

level. Operating value of level in exchanger is compensated by


PW tank is between 240-300mm continuous feeding of dilute sodium
and alarm will be generated when hydroxide solution. The
tank level reaches less than 240mm
COPYRIGHT AND CONFIDENTIAL

conductivity of the water after


or greater than 300mm. injection provides a reference for
pH value as the pH and
3.3.4 ALKALYSER UNIT conductivity are related to each
The dependence of corrosion other by a curve.
mechanism on oxygen decreases Direct pH measurements using pH
with increasing alkalinity of water electrodes cannot be used since the
and becomes insignificant at pH instruments available have not
values of 8.5 to 9.0. Dilute alkali proven for continuous service in
(NaOH) is therefore introduced into low conductivity primary water
the bypass circuit after the Ion system. As such occasional checks
exchanger. The Alkalyser Unit are recommended.
contains mainly electronic A pH value of 8.5 to 9.0 is optimum
diaphragm dosing pump, NaOH to ensure minimum corrosion.
tank, CO2 absorber and junction
box. All status & control will be 3.3.4.2
3.3.4.2 MODE OF OPERATION
provided on HMI (Human Machine The dosing pump draws dilute
Interface). sodium hydroxide solution from the
tank and delivers it to the primary
3.3.4.1 ALKALISATION PROCESS water system after Ion exchanger
Dilute (1-2 %) NaOH solution is via a spring loaded feed valve. Low
injected into the low conductivity NaOH tank level is sensed with a
Page 7 of 10
PROJECT NAME: 1X660 MW BHUSAWAL THERMAL POWER STATION, MAHARASHTRA
REV. 01 DATE: 03.10.2020

WRITE UP OF GENERATOR PRIMARY WATER


(PW) SYSTEM
BHEL DOC. NO. TGE-3668

level detector. A CO2 absorber in After the pump has been stopped
the air supply line removes carbon on account of one of these
dioxide in the inlet air and prevents conditions, the conductivity of the
the formation of carbonates in the water promptly decreases by action
NaOH solution. The tank has a of the Ion exchanger. The
capacity to store sodium hydroxide Alkalyser Unit provides warning
solution required for a service alarms in the following events by
period of a few months. displaying them on HMI:

3.3.4.3 CONTROL AND * Low conductivity in the main


MONITORING circuit < 1.0 micro S/Cm.
The feed rate is controlled by * Low conductivity in treatment
circuit < 1.0 micro S/Cm
It must not be used directly or indirectly in any way detrimental to the interest of the company

changing stroking rate dependent


The information on this document is the property of Bharat Heavy Electricals Limited.

on conductivity in the treatment * Low level in NaOH tank (Until


circuit. For this purpose, a probe immersed in liquid, No
controller and an analog to digital alarm).
COPYRIGHT AND CONFIDENTIAL

convertor is provided in the control


system. Interlocks using the In these generator modes, the
volumetric flow rate in the primary water supply system
treatment circuit as a criterion remains in operation to preserve
prevent starting of the the purity of the primary water.
3.4 OPERATING MODES
Alkalyser Unit and NaOH feeding
into the circuit under no flow 3.4.1 STANDSTILL AND TURNING
condition. To avoid overfeeding GEAR OPERATION
due to fault or incorrect operation This continued operation of the
of the Alkalyser Unit, the dosing primary water system is kept even
pump is stopped as soon as: during prolonged periods of
generator standstill, because
* Conductivity in treatment circuit draining and refilling of the primary
is > 3.0 micro S/Cm. water system is very time
OR consuming and elaborate.
* Conductivity in the main circuit is 3.4.2 GENERATOR START-
START-UP
> 2.5 micro S/Cm. Before the generator can be started
OR up, the following conditions must
* Volumetric flow rate in treatment have been established as regards
circuit is low. the Primary Water System.

Page 8 of 10
PROJECT NAME: 1X660 MW BHUSAWAL THERMAL POWER STATION, MAHARASHTRA
REV. 01 DATE: 03.10.2020

WRITE UP OF GENERATOR PRIMARY WATER


(PW) SYSTEM
BHEL DOC. NO. TGE-3668

(i) Entire primary water circuit in such a way that the flow in the
3
filled. circuit doesn't fall below 100m /hr
(ii) All instrumentation, including (trip set point) from the time of
protection and alarm circuits, sensing set pressure till the pump
operative. accelerates to deliver flow above
(iii) Generator filled with hydrogen 3
100m /hr. The conductivity of the
to nominal pressure.
primary water rises when the
(iv) Primary water heat exchangers
resins of the ion exchanger are
filled and vented.
used up. To rectify this condition,
(v) Primary water cold end
the water treatment plant is to be
temperature at least 5 K higher
taken out of operation and the
than the temperature of the cold
resins replaced. The generator may
gas.
It must not be used directly or indirectly in any way detrimental to the interest of the company

continue in operation while the


The information on this document is the property of Bharat Heavy Electricals Limited.

resins are being replaced, because


3.4.3 NORMAL OPERATION
OPERATION
the conductivity of the water rises
Low oxygen and chemically pure
only very slowly even when the
distilled water or condensate can
COPYRIGHT AND CONFIDENTIAL

water treatment plant is not in


be used to fill the cooling circuit.
service. Any blockage in the
Demineralized water and
primary water system is detected
condensate may be used only if
by means of flow rate
they satisfy the specified quality
measurements performed in the
requirements. In no case the
individual section. The individual
generator is operated without
sections are the following:
primary water.
* Stator winding
3.4.4 FAULTS
* Bushings, three flow meter per
If the primary water pump, which is
phase
running, becomes unavailable,
whether due to a mechanical fault
If the flow rate measured at these
or loss of the supply voltage,
flow meters drops to about 80 %,
automatic changeover to the
the mechanical generator
standby pump is affected. The
protection circuitry trips the
criterion which causes changeover
turbine generator set with a delay
to be initiated is the reduction in
of 60sec.
water pressure on the discharge
side of the pump. The set point of
Leakage in the primary water
the discharge pressure when
system should be located as
changeover is initiated is selected
Page 9 of 10
PROJECT NAME: 1X660 MW BHUSAWAL THERMAL POWER STATION, MAHARASHTRA
REV. 01 DATE: 03.10.2020

WRITE UP OF GENERATOR PRIMARY WATER


(PW) SYSTEM
BHEL DOC. NO. TGE-3668

quickly as possible. Further loss of


primary water can then be
prevented by isolation of the
section in which the leak is located.
If this cannot be done without
interrupting cooling water
circulation, the turbine set is to be
shut down. The mechanical
generator protection circuitry,
likewise, trips the turbine
generator set if the primary water
temperature downstream of the
heat exchangers rises too high.
It must not be used directly or indirectly in any way detrimental to the interest of the company
The information on this document is the property of Bharat Heavy Electricals Limited.

This can occur if the heat


exchangers are not in good
condition. Overheating of the
primary water may in turn lead to
COPYRIGHT AND CONFIDENTIAL

overheating of the generator


winding.

3.4.5 TRIPS

A-Turbine generator set will trip


when primary water flow at the
outlet of stator winding reaches
3
less than 100 m /hr.

B- Turbine generator set will trip


when primary water flow bushing
3
reaches less than 2.11m /hr.
C- Turbine generator set will trip
when inlet temperature of primary
o
water reached greater than 59 C.

**********************************
Page 10 of 10
PROJECT NAME: 1X660 MW BHUSAWAL THERMAL POWER STATION, MAHARASHTRA