In this mode, all current between the AC source and ground (through
น้
ที่
:
CX) is measured by the bridge ( FIG. 5b). The LV lead(s) may be
connected to the test circuit guard. Any current present on the LV
lead(s) during the test are bypassed directly to the AC source return,
and are eliminated from the measurement. GST-G mode is used to
isolate an individual section of insulation and test it without
measuring other connected insulation.
FIG. 5 Test circuit modes of the PF test set (typical). (a) GST; (b)
น้
ที่
:
GST-G connection; and (c) UST connection.
The PF test set should be located where the operator will have an
unobstructed view of the apparatus under test and of various
personnel assisting in the tests. Consideration should also be taken
to place the equipment such that proper clearance is maintained
between the test set and apparatus; in particular, it should be
recognized that damaged or defective apparatus may fail during test.
Before proceeding with a test, the operator should discuss with his
assistants the general plan for conducting the tests, voltages
applied, precautions to be observed, and proper use of the safety
devices.
PF field test sets are equipped with ground-relay that prevents test
voltage being applied until the following preliminary conditions have
been established:
2. The test case has been grounded through the 120 V supply cord.
After the test set is properly grounded, the remaining test leads and
HV test cable are plugged into their receptacles. Do not connect test
leads to the apparatus terminals unless the leads are already
connected to the PF test set.
น้
ที่
:
The PF test set require two-person operation, and therefore two
safety switches (deadman switches) are provided with the test set.
These switches are of the spring-release type for quick action. With
either switch off, all volt age to the HV test cable is removed. The
test person operating the PF test set has one of the safety switch,
known as the local operator switch; the safety supervisor or the
person assisting in PF testing should hold the second safety switch,
known as the extension safety switch. The safety supervisor or the
assisting person should be in position to observe all terminals of the
apparatus under test. If this is not possible, then the out-of-sight
terminals should be roped off with caution labels appropriately
placed, and a person posted in the vicinity to ensure safety.
Each time the test equipment is set up, prior to making the first test
both safety switch operators should jointly verify the correct
operation of both switches.
Both safety switches must be used at all times. Never short circuit
them and do not use fixed mechanical locking means for depressing
the switch button. The switch must be manually operated at all
times.
The test set operator and assistant should follow a uniform system of
visual and oral signals in order to prevent confusion when
conducting the tests.
After the tests are completed all test leads should be removed from
the equipment terminals and brought down to the ground before
they are disconnected from the test set. The heavy-duty test set
ground is the last lead to be removed from the test set. "Remember,
safety, first, last, always."