The Lokichar to Lamu Crude Oil Pipeline (LLCOP) is being developed by a consortium of the
Government of Kenya and international oil companies developing the oil resources in the South
Lokichar basin in Turkana.
The LLCOP will transport crude oil from South Lokichar to the coast at Lamu for export. The
pipeline will be buried to minimise disruption to land users and wildlife.
The LLCOP will be built within the LAPSSET Corridor. Land within the LAPSSET corridor will be
acquired by the Ministry of Land and National Land Commission on behalf of the LCDA.
The Crude Oil Pipeline Pre-Front End Engineering Design (FEED) studies were completed in 2015
and a Joint Development Agreement (JDA) signed in 2017 between the Government of Kenya and
Upstream Investors (Tullow Oil Company, Africa Oil and Total). The Front-End Engineering Designs
https://www.lapsset.go.ke/index.php/projects/crude-oil-pipeline/ 1/4
03/07/2023, 10:54 Crude Oil Pipeline – LAPSSET Corridor Development Authority
(FEED) and the Environmental and Social Impact Assessment (ESIA) studies were also completed
English
in 2019.
Stakeholder Engagement
The LLCOP project management team is committed to engaging with potentially affected
communities and other stakeholders.
Copies of the reports from recent stakeholder engagement meetings held as part of the scoping
process for the ESIA can be found below:
The Pipeline Project Management Team can be contacted at the following email address:
llcop@lapsset.go.ke (mailto:llcop@lapsset.go.ke)
The PPMT and the ESIA consultant will respond to all comments received provided that contact
details are provided.
(https://www.lapsset.go.ke/)
The LAPSSET Corridor Program is part of the Kenya Vision 2030 Strategy which is the national long-term
development policy that aims to transform Kenya into a newly industrializing, middle-income country
providing a high quality of life to all its citizens by 2030 in a clean and secure environment. The Vision
comprises of three key pillars: Economic; Social; and Political. The Economic Pillar aims to achieve an
average economic growth rate of 10 per cent per annum and sustaining the same beyond 2030.
First Name
First Name
Last Name
https://www.lapsset.go.ke/index.php/projects/crude-oil-pipeline/ 3/4
03/07/2023, 10:54 Crude Oil Pipeline – LAPSSET Corridor Development Authority
English
Last Name
Email address:
Sign up
https://www.lapsset.go.ke/index.php/projects/crude-oil-pipeline/ 4/4