You are on page 1of 1

± 0.

00

Balok Sloof 20/25 Mutu Beton K.250


- 0.10
- 0.10 Rabat Lantai Tebal 10cm Mutu Beton K.250

Urugan Tanah Sirtu Di Padatkan

- 0.60 Pas. Bata Merah Rollag Camp 1Pc:4Ps

Pondasi Batu Kali 1Pc:4Ps

- 1.05 Batu Kosong/ Aanstamping

Tulangan Pokok 3-D13


Tulangan Pokok 2-D13

Tulangan Sengkang Ø8-150

Tulangan Pokok 3-D13

- 2.00
Foot plat 100.100.30cm Mutu Beton K.250

- 2.30 Tulangan Arah X D13-150 Tulangan Arah Y D13-150


- 2.35

10.0000 30.0000 35.0000 30.0000 30.0000

20.0000 27.5000

DETAIL PONDASI BATU ROLLAG (PR)


Skala Gambar 1:30
Satuan Dimensi Cm

You might also like