Jml Titik Kebutuhan Panj. Panj. Panj. Panj. Panj. Panj. Panj. Panj. Panj. Panj.
No Lokasi Item Pek. Gambar Potongan Lokasi (m) (m) (m) (m) (m) (12m) (12m) (12m) (12m) (12m) Keterangan
Pekerjaan Panj.
Jml
(m) D10 D13 D16 D19 D22 D10 D13 D16 D19 D22
1 Pile Cap PC.1 Tulangan Utama Atas (x,y) 50 cm
1 Besi D10 3 1.1 30 33.0 2.75
30 cm
Total kebutuhan
Tulangan Utama Bawah (x,y) 30 cm Besi D10
2 Besi D13 3 1.1 30 33.0 2.75 2.75
50 cm Besi D13
3.5
Tulangan Samping 50 cm
3 Besi D13 50 cm 3 1.5 6 9.0 0.75
2 Pile Cap PC.2A Tulangan Utama Atas (x) 140 cm 2 2.2 8 17.6 1.467
1 Besi D13
40 cm
Tulangan Utama Bawah (x)
2 Besi D13 40 cm 2 2.2 8 17.6 1.467 Total kebutuhan
Besi D13
140 cm 10.67
107 cm
Tulangan Utama Atas (y) 81 cm
7 Besi D13 2 1.61 4 6.4 0.537
40 cm
Tulangan Utama Bawah (y)
8 Besi D13 40 cm 2 1.61 4 6.4 0.537
81 cm
60 cm
145 cm
66 cm
235 cm
Tulangan Samping
5 Besi D13 240 cm 2 7.3 12 87.6 7.3
65 cm
120 cm