Professional Documents
Culture Documents
ARIM RoadMap Aug 7 2023
ARIM RoadMap Aug 7 2023
>Catalogue Profiles
>Unification of Notification/workorder Types and workflows
>Notification Screen Layout / mandatory fields
> SAP PM KPI Dashboards
>Failure Notification Processing
SAP PM Capabilities > Work center catalogue optimizations
Utilization > SAP PM Tasklists & Measuring Points incorporation
> All Assets Integration with SAP PM
> Linking of BOM
> ICs spares in SAP
SAP Transactional/Master Data stewardship
>ARIM Policy
>Asset Integrity Policy
>Maintenance Management System
>Maintenance Strategy
>> Static Equipment Maint. Strategy
>> Rotating Euipment Maint. Strategy
>> Electrical Maint. Strategy
>> Instrument Main Strategy
>> Ex Equipment Mnagament Procedure
>Spare Parts Management
>Work Management KPIs /PM Evaluation
>Backlog Management
>Preventive Maintenance Process
>Corrective Maintenance Process
>Condition Based Maintenance Process
> Asset Life Assessement / Obsolesence Plans
> Bad Actor Management
> Anomaly Management System
> Maintenance Work Priorities
> FMEA/RCM Procedure
ARIM Manual > Maintenance Budgeting Process
> Control of overrides
> Management of SBT
> Managemeny of flexible hose asemblies
> Management of temporary repairs
> Management of contractor services
> Asset Management Philosophy
> Data Collection Processes
Common Processes
>Document Management
>Competency Management
>Risk Management
>Management of Change (MOC)
>Work Management
>Shutdown Management
>Turnaround Management
>Technical Authorities
>Planning & Scheduling
>Incident Management
>Deferral Procedure
The bold characters in responsibilites column are those with lead of action
* Review and facilitation by ARIM
ARIM System Road Map
Responsibility / Action
Study
Responsibility / Action / Data Target
Doc Trng SAP PSM
Collec Date
tion
A1 A2 A3 A4
ARIM 3Q'23
Maint E&I 1Q'24
ARIM 4Q'23
ARIM O 1Q'25
L&DC O 1Q'25
HSE O 1Q'25
HSE O 2Q'25
P&S O O 2Q'25
P&S O 2Q'25
P&S O 2Q'25
ARIM O 2Q'25
P&S O 3Q'25
ARIM O O 3Q'25
P&S O
ARIM O 3Q'24