METRO PROPOSED SAFARI MALL Document ID

Revision No.
OHSE-CL-12
00
BUILDING
CONTRACTING
G+M+1+R
Machinery Checklist
General Information
Company Name: AL BARAQ STEEL WORK Project Name: PROPOSED SAFARI MALL

Conducted By: EMMANUEL KUSIMO Date & Time: 08/03/2023


Machinery Type: MOBILE CRANE
()
Model: JCB, 25 TONS Plate Number: 55096 DUBAI
Location: NAKHEEL , RAK Operator Name:
Poor: Absence of major control measures (high risk), work to be stopped and risk assessment to be
reviewed immediately.
Fair: Some minor controls are missing (medium risk), additional control measures to be implemented.
Good: All required controls are in place (low risk),only monitoring is required.

Description

Item Evaluation Remarks


Good Fair Poor N/A (insert your observation
,and proposed corrective
action plan)
COMPLIANCE:
Operator has valid 3rd party competence
certificate
Has a valid 3rd party test certificate
Valid 3rd party test certificate for bucket
Lifting eye? (if any)
Fitted with working Audible alarm system
(Reverse alarm ,overload indication)
Fitted with working rotating/flashing
beacon
Has appropriate Fire Extinguisher
MAINTENANCE&OPERATION:
Tracks/Gears – Any evidence of cracks/
damage
Is Noise generating from them Machine at
An acceptable level?
All moving parts greased?
Wheels/Tires in good condition
All hydraulic Rams/Cylinders in good
condition
All hydraulic Hoses/Seals in good
condition
METRO PROPOSED SAFARI MALL Document ID
Revision No.
OHSE-CL-12
00
BUILDING
CONTRACTING
G+M+1+R
Machinery Checklist
Any evidence of Oil ,hydraulic fluid leaks
Bucket/Teeth in good condition
Bucket(s)secured with correct lock pins
Brakes fully operational(foot & hand)
All lights and indicators in working
condition
Mirrors/Cameras(if installed)/Horn in
Working condition
Seatbelt(where installed)in working
condition
Wind screen clean/no curtains blocking
vision
Wind screen wipers in working condition
All gauges& warning systems in working
order
Outriggers are in good condition/suitable
Load pads are available
Overall cabin condition(Seat, cabin
cleaning, Gauges, meters, AC etc.)

` Accepted Not Accepted


Approved by: Name Date Signature
Construction/Plant Team 08/03/2023
Representative
HSE Representative EMMANUEL KUSIMO 08/03/2023