You are on page 1of 1

METRO BUILDING Document ID OHSE/CL/06

PROPOSED SAFARI MALL Revision No. 00


CONTRACTING
Welfare Facilities Checklist

General Information
Company Name: AL BARAQ STEEL WORKS LLC Project Name: PROPOSED G+m+1 SAFARI MALL

Conducted By: EMMANUEL KUSIMO Date &Time: 16/05/2023


Location: NAKHEEL ,RAK- UAE
Poor: Absence of major control measures (high risk), work to be stopped and risk assessment to be reviewed immediately.
Fair: Some minor controls are missing (medium risk), additional control measures to be implemented.
Good: All required controls are in place (low risk), only monitoring is required.

Description

Item Evaluation Remarks


Good Fair Poor N/A (Insert your observation, and
proposed corrective action plan)
Adequate ablutions / toilets / washing Adequate toilets facilities
facilities.
Is the toilet regularly inspected / cleaned? Toilet is regularly inspected and
(Toilet roll / soap available?) cleaned

General condition and evidence of leaks Good condition and no leaks


inside toilets.
Adequate water supply (For toilets/rest Sufficient water supply
area)
Appropriate clean & cool rest area with Available
clean & cold drinking water.
Is chiller inspected and in good condition? Chiller inspected and in good condition
(e.g. filters kept clean)
Food storage facility. NA
Changing rooms with facility for keeping Available
protective clothing used at work (locker).
Prayer area clearly identified & kept clean NA
all the time
Safe access & egress to and from the facility Safe access and egress to and from
Welfare facilities are in clean good hygienic Welfare facilities are in clean good
condition. hygienic condition

Designated smoking area with proper Available


firefighting equipment
Is a shaded rest area with seating provided? Available

Approved By:
Position Name Date Signature
SITE Representative 16/05/2023

You might also like