Daily Report

Date Name Site Company Name

2023.04.10 Victor Stefan Voievodeni Ostenwerg


2023.04.11 Victor Stefan Voievodeni Ostenwerg
2023.04.12 Victor Stefan Voievodeni Ostenwerg
Pacureni Energobit
2023.04.13 Bogdan Puscas Voievodeni Ostenwerg
Bogdan Puscas Voievodeni Ostenwerg
Bogdan Puscas Voievodeni Ostenwerg
Bogdan Puscas Voievodeni Ostenwerg
Bogdan Puscas Voievodeni Ostenwerg
2023.04.13 Bogdan Puscas Pacureni Energobit
2023.04.18 Bogdan Puscas Voievodeni Ostenwerg
Bogdan Puscas Voievodeni Ostenwerg
Bogdan Puscas Voievodeni Ostenwerg
Bogdan Puscas Pacureni Energobit
2023.04.19 Bogdan Puscas Voievodeni Ostenwerg
Bogdan Puscas Voievodeni Ostenwerg
Bogdan Puscas Voievodeni Ostenwerg
2023.04.19 Bogdan Puscas Pacureni Energobit
Bogdan Puscas Pacureni Energobit
Bogdan Puscas Pacureni Energobit
2023.04.20 Bogdan Puscas Voievodeni Ostenwerg
Bogdan Puscas Voievodeni Ostenwerg
2023.04.20 Bogdan Puscas Pacureni Energobit
2023.04.21 Bogdan Puscas Voievodeni Ostenwerg
Bogdan Puscas Voievodeni Ostenwerg
Bogdan Puscas Voievodeni Ostenwerg
2023.04.21 Bogdan Puscas Pacureni Energobit
2023.04.21 Bogdan Puscas Glodeni Ostenwerg
2023.04.24 Bogdan Puscas Pacureni Energobit
Bogdan Puscas Pacureni Energobit
2023.04.24

2023.04.24 Bogdan Puscas Voievodeni Ostenwerg

2023.04.24 Bogdan Puscas Voievodeni Ostenwerg

2023.04.25 Bogdan Puscas Pacureni Energobit


2023.04.25 Bogdan Puscas Pacureni Energobit
2023.04.25 Bogdan Puscas Pacureni Energobit
2023.04.25 Bogdan Puscas Voievodeni Ostenwerg
2023.04.25 Bogdan Puscas Voievodeni Ostenwerg
2023.04.25 Bogdan Puscas Voievodeni Ostenwerg
2023.04.25 Bogdan Puscas Glodeni Ostenwerg
2023.04.26 Bogdan Puscas Pacureni Energobit
2023.04.26 Bogdan Puscas Voievodeni Ostenwerg

2023.04.27 Bogdan Puscas Pacureni Energobit


2023.04.27 Bogdan Puscas Voievodeni Ostenwerg
2023.04.27 Bogdan Puscas Voievodeni Ostenwerg
2023.04.27 Bogdan Puscas Voievodeni Ostenwerg
2023.05.02 Victor Stefan Voievodeni Ostenwerg
2023.05.03 Victor Stefan Voievodeni Ostenwerg
2023.05.04 Victor Stefan Voievodeni Ostenwerg
2023.05.05 Victor Stefan Pacureni Energobit

2023.05.08 Bogdan Puscas Pacureni Energobit

2023.05.08 Bogdan Puscas Pacureni Energobit

2023.05.08 Bogdan Puscas Voievodeni Ostenwerg


2023.05.08 Bogdan Puscas Voievodeni Ostenwerg
2023.05.09 Bogdan Puscas Pacureni Energobit
2023.05.09 Bogdan Puscas Pacureni Energobit
2023.05.09 Bogdan Puscas Voievodeni Ostenwerg
2023.05.09 Bogdan Puscas Voievodeni Ostenwerg
Works Performed Present Workforce

Cutt and fill and Compound 2


Deviation of a stream Cut and fill operations 5
Cutt and fill and Compound 5
Pelling 4
Cutt and fill and Compound 4
Topograph and picketing for future cut and fill 1
Unloading fence for site organization 1
Toilets intalation
Generator instalation
Pelling 1
Cutt and fill and Compound 4
Deviation of a fountain 1
Tree cut 2
Compound - platform 7
Pelling 4
Compound 1
Fence 2
Compound - platform 1

Cut and fill, pelling 4


Compound - platform 1
none -
Cut and fill, compound 5
Container instalaition 1
Topograph and picketing for future cut and fill 1
delivery of 1 container 6
Tree cut 4
delivery of 1 container 2
Peeling 9

Cut and fill 4

Grader, compound compactation same

Peeling 5
Site marking same
making iron frameworks for concrete belts 4
site cleaning 2
Tree cut 2
cut and fill 5
topograph and picketing for vegetation cut 1
making iron frameworks for concrete belts 4
- -

making iron frameworks for concrete belts 4


Tree cut 2
Container instalaition 2

Cutt and fill and Compound 4


Cutt and fill and Compound 5
Cutt and fill and Compound , Perimetral fence 8
Concrete casting station , holes for the fence 5

Iron armoured frameworks for concrete 8

Measurments for ditch channel and ditch for cable 3

Perimetral fence 6
Perimetral fence 2
Iron armoured frameworks for concrete 8
Interior road leveling and compaction with gravel 3
Cutt and fill and Compound 5
Perimetral fence 6
Existing Equipment on site On-site deliveries

Truck , Excavator
Truck , Excavator ,Road Roller
Excavator
Truck , Excavator ,Road Roller, Bulldozer

Fence for site organization


Toilets
Generator
Excavator
Truck, Excavator, Road roller, Buldozer, Bobcat ballast, stones
Excavator
Tractor
Excavator (small, 2pcs), road roller, truck ballast, stones
Excavator, Truck
Bobcat, road roller ballast, stones

Excavator concrete fence modules


2 Containers for "Organizare de santier"
1 Container for guards
Excavator, buldozer, truck, road roller -
Bobcat ballast, stones
- -
Buldozer, frontal loader, road roller, truck, excavator
containers (4 pcs)

1 truck, 1 excavator container (1 pcs)


Tractor
Truck container (1 pcs)
excavator (x3), buldoexcavator, small truck -

truck, excavator, buldozer, front loader -

same -

excavator (x3), buldoexcavator, small truck -


- -
- iron rods
front loader, truck -
tractor with blade -
excavator, buldozer, truck, front loader -
- -
- iron rods
excavator, buldozer, truck, front loader -

-
tractor with blade
- container (2 pcs)
perimetral fence
excavator, buldozer, truck, front loader -
excavator, buldozer, truck, front loader
Manitou , excavator , buldozer
excavator, buldoexcavator, small truck

Front road roller, buldo -

- -

-
Manitou perimetral fence (1 truck)
- -
Front road roller, buldo, truck gravel
Truck, Excavator, Road roller, Buldozer -
small excavator/driller, bobcat, manitou (2 pcs)
Special Events

1 bear entered the Site organisation and was spotted by


security guards; it was a very close encounter; also
another bear was spotted on the SE side of the site where
the machines were parked.

different suspicious cars were spotted by the security


guards on several nights after sunset; cars were stopping
near the site, doing a short observation, then leaving

-
-
-
-
-
-
Heavy raining, works on peeling could not be performed
Due to heavy rain, works on soil could not be performed
Soil was super wet and there were 3 big ponds on the
site; due to this no heavy works were performed
due to very wet soil, no heavy works could be perfomed

installation of an electricity pole by Electrica S.A. to bring electricity to the construction site
acces road is very bad; subcontractor said is going to
apeal the contract because they can't prfomed the work
because of the road and site conditions

one issue signaled by Energobit: according to


measurment the ditch for the cable will in place in an
actual ditch that exist on site and is more than 1 m deep
Comments

deliveries of ballast are going slow

the raod has problems because there is a lot of wet mud under the ballast/stones

Fence was installed on 70% of "organizare de santier" site

1 guard was on site for outside the programm guarding


works performed for the perimetral road

-
works performed for the perimetral road; soil is soft and full of roots from the trees in some areas
4 containers were delivered and installed in position

1 container was delivered and installed ti position


tree cut operation ongoing at Glodeni site (on side)
1 more container was delivered; another 2 were on the way
peeling operations were performed at Pacureni stations site with 4 machines; workers had better
better safety equipment than last times; they had SSM Papers

cut and fill operations were made on the north side of the hill

compound soil was compacted and graded on the north side hill

peeling operations were performed at Pacureni station


right side of the site was marked for future peeling operations (interior road, etc)
iron frameworks were made in preparation for mounting the interior concrete belts
ongoing cleaning operation of debries from perimetral road works (a lot of roots, vegetation, soil, etc)
tree cut operations were made on perimetral area of the site
cut and fill operations were made on the north side of the hill
topographic measurments were made for future vegetations cut on site
iron frameworks were made in preparation for mounting the interior concrete belts
-

A. to bring electricity to the construction site

steel armoured framework was put in place acording to the plans provided by Energobit
Subcontractor; all for the station building

topo measurments were made to determine the road and cable ditches

perimetral fence was installed on the east side

Armoured iron frameworks were made for the structure of Medium Voltage Building (foundation)
Gravel was delivered, compacted and leveled on the interior road
cut and fill and compounding operations were made north and center part of Voivodeni 1
perimetral fence was instaled on east side of Voivodeni 2 (ongoing)
Photo's

Vvd 2023.04.11 P1,P2,P3,P4


Vvd 2023.04.12 P7, P6 ,P5,
Pcr 2023.04.12 P1 , P2