DAILY DIARY OF THE SITE Issued by Krone Solar CEE
WORKING HOURS:
FROM 8:00 TO 17:00
© Krone Solar CEE SRL All Rights Reserved This document is subject to the handling restrictions set forth on
the title page
Revision/Date
Technical Document
Page 2 of 1
DAILY DIARY OF THE SITE Issued by Krone Solar CEE
WORKS PERFORMED:
Foundations, Pacureni Station platform: Soil was excavated in order to make foundations for “Cladire MT”, “cuva
trafo”, and perimetral fence
Armoured Iron frameworks, Pacureni station: Armoured iron frameworks were made for future concrete structures
Cut and fill, Compound Voivodeni: Cut and fill and compound operations were made on the north and center sides of
the hill
Fence, Voivodeni: holes were drilled for the fence poles, and fence was instaled on the east side of Voivodeni 2
Vegetation cut, Pacureni site: Vegetation was cut on the site on the valley area
SPECIAL EVENTS:
© Krone Solar CEE SRL All Rights Reserved This document is subject to the handling restrictions set forth on
the title page
Revision/Date
Technical Document
Page 3 of 1
DAILY DIARY OF THE SITE Issued by Krone Solar CEE
© Krone Solar CEE SRL All Rights Reserved This document is subject to the handling restrictions set forth on
the title page
Revision/Date
Technical Document
Page 4 of 1
DAILY DIARY OF THE SITE Issued by Krone Solar CEE
EXECUTION GRAH
Substation
PV Electrical
PV Mechanical
Design
0 20 40 60 80 100 120
PROGRE Grid
© Krone Solar CEE SRL All Rights Reserved This document is subject to the handling restrictions set forth on
the title page