Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total
Norms
Rate Per
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial
dol/1
1 Site Clearance 1 m2 Labour Unskilled 0.04 No. 660.00 26.40 26.40 26.40 26.40 m2 26.40
396.00
dor/ dor/
905 905
2.1 For Soft soil 1 m3 Labour Unskilled 0.60 No. 660.00 396.00 396.00 396.00 396.00 m3
2.2 For Hard soil 1 m3 Labour Unskilled 0.80 No. 660.00 528.00 528.00 528.00 528.00 m3 528.00
For Stone mixed
9.11
1056.00
dor/
2.3 1 m3 Labour Unskilled 1.60 No. 660.00 1056.00 1056.00 1056.00 1056.00 m3
soil/soft rock
dol/2
3 Cutting of trees including the removal of trunk, branches and stumps up to a lead of 100m
Above 90cm-
990.00
dol/
3.1 Each Labour Unskilled 1.50 No. 660.00 990.00 990.00 990.00 990.00
2.3
Each
180cm girth
Above 180cm-
1980.00
dol/
3.2 Each Labour Unskilled 3.00 No. 660.00 1980.00 1980.00 1980.00 1980.00 Each
2.4
270cm girth
dol/5
Norms
Rate Per
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial
dol/9.b
b. Hard soil 1 m3 1359.60 1359.60 1359.60 m3
Tools & Equipment 3% 39.60
165.00
dol/
6 Earth filling work 1 m3 Labour Unskilled 0.25 No. 660.00 165.00 165.00 165.00 165.00 m3
10
7
Stone Analysis for area where stone is available within reach of 5 Kms of work site ( Note:For Area where stone is not
available within reach of 5km additional analysis should be made)
(Uncoursed
7.3 1 m3 Unskilled 1.75 No. 660.00 1155.00 4217.81 4217.81 m3
rubble) masonary
work
Material Stone 1.10 Cu.m. 2384.38 2622.81 2622.81
rubble) masonary
7.4 1 m3 Cement 1.84 Bag 752.00 1383.68 9197.89 9197.89 m3
work 1:6 cement
mortar Sand 0.50 Cu.m. 3400.00 1700.00
Material 5706.49
7.5 rubble) masonary 1 m3 Cement 2.32 Bag 752.00 1744.64 9423.85 9423.85 m3
work 1:4 cement
mortar Sand 0.47 Cu.m. 3400.00 1598.00
Material 5965.45
Norms
Rate Per
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial
slab , beam,
10 1 m3 Sand 0.44 Cu.m. 3400.00 1496.00 12479.40 12479.40 m3
column , lintel
etc.
Material 40 mm aggregate 0.52 Cu.m. 1700.00 884.00 8259.80
P.C.C.(1:3:6) for
11 foundation & 1 m3 10323.80 10323.80 m3
Prepared By: floor Checked By: Approved By:
Material 6803.80
Baganaskali Rural Municipality,Palpa:Rate Analysis-077/78(User Committee)
Total
Norms
Rate Per
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial
dol/41.A.a
P.C.C.(1:3:6) for
11 foundation & 1 m3 Sand 0.47 Cu.m. 3400.00 1598.00 10323.80 10323.80 m3
floor
Material 6803.80
40 mm aggregate 0.65 Cu.m. 1700.00 1105.00
Gabion work ( Assuming Stone Analysis for area where stone is available within reach of 5 Kms of work site)
providing & filling 1 m3 Unskilled 0.75 No. 660.00 495.00 3390.27 3390.27 m3
of stone/boulder in
Gabion
boxes/mattress etc. 1.00 Cu.m.
12.1 including dressing, Material Block Stone 2384.38 2384.38
bending, bonding 2622.81
and all 0.10 Cu.m.
transportation as Bond stone 2384.38 238.44
per specification
Add 2% of material cost exculiding
52.46
transportation cost for necessary testing
Fabrication of gabion boxes including rolling, cutting and weaving & packing.Hexagonal Mesh size-100mmx120mm, Mesh wire-10 SWG(0.0615kg/m), Selvedge wire-8SWG (0.1057kg/m), Binding
13
wire-12 SWG
dor activity Nos.(24.01.02 ,+24.02.04 )
size
Selvedge wire 2.70 Kg 96.00 259.20
Material 6209.42
Binding wire 1.25 Kg 96.00 120.00
S.N.no.2401
Total
Norms
Rate Per
c. Description
2x1x1 m Box size Per
1 Unit
m3 Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total
10296.19 5148.09 Unit
m3
Spec.clause
Unit
erial
dor activity
Material 7972.99
Binding wire 1.30 Kg 96.00 124.80
14 Machine made Gabbion Box of Hexagonal Mesh size-100mm*120mm, Mesh wire-3mm, Selvedge wire 3.9 mm, Binding wire 2.4mm(MBG/10*12/3.0/3.9/2.4/ZN)
Norms
Rate Per
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
Curtailment , erial
dol/40
18 bent up, binding 1000 Kg 90480.00 90.48 Kg
of MS bars . Tor steel/MS bar 1.05 MT 75000.00 78750.00
Material 79700.00
Binding wires 10.00 Kg 95.00 950.00
structure.(Qty. Of
19.a wood 10 m2 7365.00 736.50 m2
=(0.75+.5)/12=.0833)A Wood(Normal) 0.104 Cu.m. 42000.00 4375.00
ssume wood can be
used 8 times. Material 4725.00
Nails 3.50 Kg 100.00 350.00
structure .(Qty. Of
19.b wood 10 m2 5170.00 517.00 m2
=(0.75+.25)/12=0.0833
)Assume wood can be Wood(Normal) 0.083 Cu.m. 42000.00 3500.00
used 8 times. Material 3850.00
Nails 3.50 Kg 100.00 350.00
Labour 32164.00
Unskilled 3.40 No. 660.00 2244.00
Normal wood
dob/10.1
Norms
Rate Per
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial
Labour 9460.00
Unskilled 1.00 No. 660.00 660.00
shutter of
23 2.114 m2 13812.00 6533.59 m2
doors/windows
(Size:1.07m x 150mm tower bolt 2.00 Nos. 17.00 34.00
Material 4352.00
1.982m
=2.114m2 ) Locking set 1.00 Nos. 210.00 210.00
Handles 2.00 Nos. 150.00 300.00
Screw 1.00 LS 100.00 100.00
dob/10.9
GI plain sheet on
25 2.245 m2 Total 14953.84 6660.96 m2
Norms
one side. Rate Per
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
(Size:1.092m x Unit
Material erial
8331.84
2.058m
=2.245m2 )
Locking set 1.00 Nos. 210.00 210.00
GI plain sheet on
27 2.245 m 2
100mm hinges 3.00 Nos. 25.00 75.00 10056.95 4479.71 m2
both side.
(Size:1.092m x Material 3434.95
2.058m 150mm tower bolt 2.00 Nos. 17.00 34.00
=2.245m2 )
Locking set 1.00 Nos. 210.00 210.00
GI plain sheet on
28 2.245 m2 11314.29 5039.77 m2
both side. 100mm hinges 3.00 Nos. 25.00 75.00
(Size:1.092m x
2.058m Material 4692.29
150mm tower bolt 2.00 Nos. 17.00 34.00
=2.245m2 )
Locking set 1.00 Nos. 210.00 210.00
Handles 2.00 Nos. 150.00 300.00
Norms
Rate Per
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial
dob/10.18
Sal wood work
29 1 m3 Sal wood 1.05 Cu.m. 168000.00 176400.00 209382.00 209382.0 m3
for truss
Normal wood
30 1 m3 Normal wood 1.05 Cu.m. 42000.00 44100.00 77082.00 77082.00 m3
work for roofing
wooden flooring
33 over 50mm x 10 m2 23931.00 2393.10 m2
75mm salwood Normal wood 0.421 Cu.m. 42000.00 17682.00
frame @600mm Material 17782.00
c/c Screw Nails 1.00 LS 100.00 100.00
flooringflooring
34 10 m2 76977.00 7697.70 m2
over 50mm x
75mm salwood Sal wood 0.421 Cu.m. 168000.00 70728.00
frame @600mm Material 70828.00
c/c Screw Nails 1.00 LS 100.00 100.00
dob/10.19
Sal wood (25mm
Total
Norms
35 th. plank) work 10 m2 47652.78 4765.28
Rate Per m2
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
for eaves board Unit
erial
Material 46300.00
Screw nails 1.00 LS 100.00 100.00
Norms
Rate Per
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial
Norms
Rate Per
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial
sheet(Coloured)
43 10.00 Rm 6739.14 673.91 Rm
for ridge
GI plain sheet 12.00 Rm 247.85 2974.14
covering.
Material 2999.14
Nut bolt/J-hook 1.00 LS 25.00 25.00
Norms
Rate Per
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial
Norms
Rate Per
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial
Labour 15840.00
Unskilled 8.00 No. 660.00 5280.00
Two coat enamel
55 a 100 m2 26351.00 263.51 m2
painting work
Primer 8.10 lt. 310.00 2511.00
Material 10511.00
Enamel 16.00 lt. 500.00 8000.00
Labour 15840.00
Two coat Apex Unskilled 8.00 No. 660.00 5280.00
painting (Exterior
55 b 100 m2 29434.78 294.35 m2
weather paint)
with Prime Coat Primer 8.10 lt. 415.00 3361.50
Material 13594.78
Enamel 16.00 lt. 639.58 10233.28
56 alluminium 100 m 2
Primer 8.10 lt. 310.00 2511.00 25015.00 250.15 m2
painting work
Material Alluminium paint 10.76 lt. 525.00 5649.00 8460.00
58 Dismantalling of various works & came out material lead upto 30m
Dismantalling of
dob/
19.1
a. masonary work 1 m3 Labour Unskilled 1.06 No. 660.00 699.60 699.60 699.60 699.60 m3 699.60
with mud mortar
Dismantalling of
dob/19.2
masonary work
b.
with cement
1 m3 Labour Unskilled 2.12 No. 660.00 1399.20 1399.20 1399.20 1399.20 m3 1399.20
mortar
Norms
Rate Per
S.N.
Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Grand Total Unit
Unit
erial
Dismantalling of
dob/
19.3
c. R.C.C. or R.B.C. 1 m3 Labour Unskilled 11.00 No. 660.00 7260.00 7260.00 7260.00 7260.00 m3 7260.00
work
Dismantalling of
19.4
dob/
d.
P.C.C. work
1 m3 Labour Unskilled 4.00 No. 660.00 2640.00 2640.00 2640.00 2640.00 m3 2640.00
Skilled 0.06 No. 880.00 52.80 938.96
Labour 56.76
Unskilled 0.01 No. 660.00 3.96
dob/10.11.kha
Fixed glazed
59 pannels (4mm 1 m2 4mm th. Glass 1.000 sqm. 735.00 735.00 938.96 938.96 m2
thick glass)
Material wooden listy 4.05 Rm 24.00 97.20 882.20
Fixed wiremesh
60 1 m2 Wire mesh 1.00 sqm. 225.00 225.00 428.96 428.96 m2
panes
Material wooden listy 4.05 Rm 24.00 97.20 372.20
Nails 1.00 LS 50.00 50.00
136.2 hL=cfO{=lgKknx?
lgKknsf] ljj/0f / b/ /]6 s}lkmot
s|=;+= cfO6d OsfO{ 1/2" 3/4" 1" 1.25" 1.5" 2" 2.5" 3" 4" OGr
dL=dL
15 20 25 32 40 50 65 80 100
=
1 2"nfdf] k|lt uf]6f 25.70 35.50 49.90 64.00 80.10 101.20 140.60 165.20 438.40
2 3"nfdf] k|lt uf]6f 38.50 53.40 74.80 96.00 120.10 151.70 210.90 247.80 357.60
3 4"nfdf] k|lt uf]6f 51.40 71.20 99.80 128.00 160.10 202.30 281.20 330.40 476.70
4 5"nfdf] k|lt uf]6f 64.20 89.00 124.70 159.90 200.10 252.90 351.50 413.00 595.90
5 6"nfdf] k|lt uf]6f 77.10 106.70 149.60 191.90 240.10 303.40 421.70 495.80 715.10
6 8"nfdf] k|lt uf]6f 102.70 142.30 199.50 255.90 320.10 404.60 562.30 660.80 953.40
7 9"nfdf] k|lt uf]6f 115.60 160.10 224.40 287.80 360.10 455.10 632.60 743.40 1072.60
8 10"nfdf] k|lt uf]6f 128.40 177.90 249.40 319.80 400.10 505.70 702.90 826.00 1191.80
9 12"nfdf] k|lt uf]6f 154.10 213.40 299.20 383.80 480.10 606.80 843.40 991.20 1430.10
10 18"nfdf] k|lt uf]6f 231.10 320.10 448.80 575.60 720.10 910.20 1265.10 1488.60 2145.20
136.1 hL=cfO=lkml6Ë;
lkml6Ë;sf] b/ /]6 )&$ / )&% s}lkmot
s|=;+= cfO6d OsfO{ 1/2" 3/4" 1" 1.25" 1.5" 2" 2.5" 3" 4" OGr
dL=dL
lh=cfO{= kfO{ksf] r'/L sf6\g] 15 20 25 32 40 50 65 80 100
=
11 sfd k|lt r'/L 40.00 40.00 60.00 80.00 100.00 120.00 250.00 350.00 550.00
mot
150.29
mot
mot
Baganaskali Rural municipality
Office of the Rural Municipal Executive
Chirtungdhara ,Palpa
106700
96300 15000
533500
533500
Rate Analysis 2077-78
Baganaskali Rural Municipality
Norms Rate Per
S.N. Description Unit Remarks
S.N. Unit
1 dol/1 Site Clearance 26.40 m2
2 Removal of landslide
2.1 dor/15.34.ka For Soft soil 396.00 m3
Stone: 1 m3
a) haulage 5.00 Km
50%Stone by collection 1.00 0.50 660.00 330.00
Quarry With in 5 Km
Speed 15 kmph Earthen 5 km
Total lead 5 km
T=2xD/V= 0.667
Total qty Unit Rate (Rs) Total (Rs)
Resources (Fuel, vehicle, labour) Remarks
Diesel (2.7xT) 1.8 ltr 95.00 171
Truck (0.75+T)x0.21 0.2975 hrs 450.00 133.88
Labour 0.50 md 660.00 330.00
1.00 m3 634.88
Transportation cost per m3 NRs. 634.88
T=2xD/V
SN Materials Source Black Top Road T1 = Earthen Road T2 = Total Time
Distance Speed Distance Speed T
160
120
160
120
313.5
313.5
Rate Analysis-064/065
Total
Grand Rate Per
S.N. Description Per Unit Labour/Material Quantity Unit Rate Amount Labour/Mat Unit
Total Unit
erial
50% by collection 0.7*1.1 No. 660.00 508.20
Unskilled
50% by chiseling 0.3*4.0 No. 660.00 792.00
Stone collection & cutting
Transportation lead 5 km (Stone qntl/
2 (including transportation) Out of 1 m3 22*5 3.40 374.00 2008.66 2008.66 2008.66 m3
wt :2200 kg/m3) km
district headquarter
Local Royalty 1 LS 50.00 50.00
Load and unload 0.431 Md 660.00 284.46
2 Allowance
2.1 Dozer operator 1.00 Md 890.00 890.00
2.2 Dozer helper 1.00 Md 570.00 570.00
2.3 Dozer labour 5.00 Md 560.00 2800.00
Total Allowance per day : 4260.00 8hr/day
Total Allowance per hour(B): 532.50 (B)
Respective
Unit
S.N. clause of Description level Unit Rate Unit Cost Rs. Rmk
specification Quantity
Carying out the construction operation of granular sub base including full compensation for making arrangment for trafic in
3 1 accordance wih clause G-12 of the specification except for initial treatment to shoulders and construction of diversions ; - Furn
A- a. Class 1 Grading ( when CBR = 30%) 1m3
Labour
Procuring sieved river gravel aggregates having size of
63 mm down unskilled md 0.68 560.00 380.80
4.75 - 63mm unskilled md 1.65 560.00 924.00
75 microns - 4.75 mm unskilled md 0.10 560.00 56.00
preparation of sub grade that was finished earlier unskilled md 0.05 560.00 28.00
for laying aggregate including the incientals unskilled md 1.50 560.00 840.00
for laying aggregate including the incientals Skilled md 0.25 750.00 187.50
Royalty LS 1.00 50.00 50.00
Load/ Unload unskilled LS 1.00 100.00 100.00
Transportation & load/unload from 6 km 6 Km 16 2.7 259.20
2825.50 m3
b/ ljZn]if0f–43
b/ ljZn]if0f–)^#÷)^$
s=n]j/ HofdL 4.00 hgf 130.00 520.00
u= ;fwff/0f 9'ªuf sf6\g] 1 3=dL 535.60 535.60 535.60 3=dL=
oGq tyf pks/0f #Ü 15.60
s=n]j/ HofdL 8.00 hgf 130.00 1040.00
3= dWod 9'ªuf sf6\g] 1 3=dL 1071.20 1071.20 1071.20 3=dL=
oGq tyf pks/0f #Ü 31.20
s8f 9'ªuf sf6\g] - s=n]j/ HofdL 30.00 hgf 130.00 3900.00
ª 1 3=dL 4017.00 4017.00 4017.00 3=dL=
l5gf]n] _ oGq tyf pks/0f #Ü 117.00
b/ ljZn]if0f–44
b/ ljZn]if0f–)^#÷)^$
b/ ljZn]if0f–45
District Rate (Labour) Palpa -070/71 46
cf=j= )&!
cf=j= )&)÷&!
÷&@
s|=;+= HofdLsf] ljj/0f k|lt OsfO{ sf] :jLs[t
sf] :jLs[t
b/ /]6
b/ /]6
s= HofdL Hofnf b/ /]6
1 HofdL ;fwf/0f-cbIf_ JolQm÷lbg 355.0 400.0
2 s'NnL gfOs]-d]7_ JolQm÷lbg 360.0 405.0
3 HofdL ;fwf/0f-cbIf_ JolQm÷lbg 407.4
4 HofdL 9'+uf kmf]g]{ JolQm÷lbg 407.4
l;sdL{,8sdL{,gsdL{,jh|sdL{,lrqsf/
3 L,KnDj/,cf/fs;L JolQm÷lbg 510.0 570.0
6 8sdL{ JolQm÷lbg 582.0
7 gsdL{ JolQm÷lbg 582.0
8 jh|sdL{ JolQm÷lbg 582.0
9 lrqsf/L JolQm÷lbg 582.0
4.0 l5gf]n] Kjfn kfg]{ HofdL
4.1 ;lhnf] 7fpFdf JolQm÷lbg 355.0 400.0
4.2 c;lhnf] 7fpFdf JolQm÷lbg 360.0 405.0
District Rate (Labour) Palpa -070/71 47
cf=j= )&!
cf=j= )&)÷&!
÷&@
s|=;+= HofdLsf] ljj/0f k|lt OsfO{ sf] :jLs[t
sf] :jLs[t
b/ /]6
b/ /]6
cf=j= )&!
cf=j= )&)÷&!
÷&@
s|=;+= HofdLsf] ljj/0f k|lt OsfO{ sf] :jLs[t
sf] :jLs[t
b/ /]6
b/ /]6
cf=j= )&!
cf=j= )&)÷&!
÷&@
s|=;+= HofdLsf] ljj/0f k|lt OsfO{ sf] :jLs[t
sf] :jLs[t
b/ /]6
b/ /]6
cf=j= )&!
cf=j= )&)÷&!
÷&@
s|=;+= HofdLsf] ljj/0f k|lt OsfO{ sf] :jLs[t
sf] :jLs[t
b/ /]6
b/ /]6
cf=j= )&@÷
cf=j= )&$
&# sf] :jLs[t
b/ /]6 ÷&% sf]
l:js[t b/ /]6
445.0 560.0
450.0 565.0
635.0 750.0
445.0 560.0
450.0 565.0
District Rate (Labour) Palpa -070/71 52
cf=j= )&@÷
cf=j= )&$
&# sf] :jLs[t
b/ /]6 ÷&% sf]
l:js[t b/ /]6
405.0
450.0 560.0
405.0
445.0 560.0
485.0 635.0
485.0 600.0
485.0 600.0
7500.0 9000.0
445.0
895.0 1015.0
690.0 780.0
706.00
650.0 735.0
1015.0
635.0
630.0 735.0
640.0 600.0
635.0 750.0
740.0 890.0
450.0 570.0
455.0 455.0
425.0 425.0
425.0 565.0
635.0 750.0
District Rate (Labour) Palpa -070/71 53
cf=j= )&@÷
cf=j= )&$
&# sf] :jLs[t
b/ /]6 ÷&% sf]
l:js[t b/ /]6
635.0 750.0
470.0 585.0
470.0 585.0
435.0 560.0
635.0 750.0
470.0 585.0
485.0 750.0
540.0 615.0
585.0 665.0
435.0 560.0
435.0 560.0
435.0 560.0
300.0 320.0
780.0
735.0
2.7 2.0
3.9 2.6
3.7 2.8
4.4 3.4
2.8 2.2
4.3 3.4
District Rate (Labour) Palpa -070/71 54
cf=j= )&@÷
cf=j= )&$
&# sf] :jLs[t
b/ /]6 ÷&% sf]
l:js[t b/ /]6
3.9 3.1
4.7 3.7
18.4 13.6
24.8 19.3
20.3 15.0
27.2 21.0
2.3 3.2
3.1 4.1
49.5 57.0
30.5 35.5
8.6 9.0
0.0
446.0 22.0
29.7 26.4
505.0
District Rate (Labour) Palpa -070/71 55
cf=j= )&@÷
cf=j= )&$
&# sf] :jLs[t
b/ /]6 ÷&% sf]
l:js[t b/ /]6
35.7
490.0 22.7
30.7
406.0 21.0
412.0 21.5