Man Hour Resources
Man Hour Resources
P/L 1st class solid burnt brick masonary set in cement and sand mortar
4 1:4 in straight or curved walls and including joints making and curing 47450 Cft 412 100.00% 19,549,400
Brick masonary 9" thick in Basement 54,720
4 Brick Masonary Works at basement 100.00% 54,720
4 9" thick brick masonary work at basement 120 Cft 456 100.00% 54,720
Surface Rendering 870,144
9 Internal Plaster Ceiling 100.00% 323,334
9 Internal Plaster for basement ceiling 4686 sft 69 100.00% 323,334
9 Internal Plaster Walls 100.00% 546,810
9 Internal Plaster for basement walls 8285 sft 66 100.00% 546,810
Flooring 11,541,419
2 Termite Treatment 50.00% 2,494,643
2 Spray Anti-Termite liquid under floor 55436.5 sft 45 50.00% 2,494,643
3 Form, Poruing and Striping _ PCC (1:4:8) 50.00% 7,573,716
3 P/L minimum 4" thick PCC 1:4:8 18294 Cft 414 50.00% 7,573,716
3 Dry Brick Ballast 14.29% 301,561
P/L dry brick ballast over depressed slab or where required to achieve
3 finish floor level. 2451.71428571 Cft 123 14.29% 301,561
Gate / Ball Valve _ Providing and installing gate / ball Gate / Ball Valve _ Providing and installing gate / ball valves i/c fitting,
4.2 3.1 valves i/c fitting, painting, testing, complete in all respect painting, testing, complete in all respect 1,305,024
63 mm dia 16 EA 81564 1,305,024
Sprinkler _ Providing, installing & testing (sprinkler) i/c Sprinkler _ Providing, installing & testing (sprinkler) i/c fitting, testing,
4.3 3.1 fitting, testing, including all nessesary accessories including all nessesary accessories 3,804,475
Concealed type (Concealed) 551 EA 6605 3,639,355
Wall Mounted 60 EA 2752 165,120
4.4 3.1 Interconnection with muncipal fire Brigade Interconnection with muncipal fire Brigade 118,054
Zone Check assembly _ Providing, installing and Zone Check assembly _ Providing, installing and commisioning fire
commisioning fire fighting zone check assembly fighting zone check assembly consisting of Alarm valve, Gate valve,
4.7 2 consisting of Alarm valve, Gate valve, Flow switch etc Flow switch etc 1,541,032
Providing, installing and commisioning fire fighting zone check assembly
consisting of Alarm valve, Gate valve, Flow switch etc 4 EA 385258 1,541,032
Drain / Test Point _ Providing installing testing and
commisioning fire fighting drain / test point at suitable Drain / Test Point _ Providing installing testing and commisioning fire
4.8 2 location fighting drain / test point at suitable location 139,428
Providing installing testing and commisioning fire fighting drain / test
point at suitable location 4 EA 34857 139,428
Fire Extinguisher _ Providing & fixing NPPA approved Fire Extinguisher _ Providing & fixing NPPA approved portable fire
4.9 2 portable fire extinguishers extinguishers 214,650
Providing & fixing NPPA approved portable fire extinguishers 18 EA 11925 214,650
Septic Tank _ Construction of rectangular septic tank size Septic Tank _ Construction of rectangular septic tank size 24' x 10' for
5.3 2 24' x 10' for sewer complete in all respect sewer complete in all respect 1,097,600
Septic Tank _ Construction of rectangular septic tank size 24' x 10' for
sewer complete with brick work, plastering, PCC base, RCC slab,
benching i/c 18" dia MH cover & frame, rungs. 1 Job 1097600 1,097,600
6.1 2 Providing and fixing_GI pipes and fitting Providing and fixing_GI pipes and fitting 169,547
Providing and fixing_GI pipes and fitting 3/4 inch dia 55 Rft 358 19,690
Providing and fixing_GI pipes and fitting 1 inch dia 205 Rft 461 94,505
Providing and fixing_GI pipes and fitting 1- 1/2 inch dia 88 Rft 629 55,352
Gate / Ball Valve _ Providing and installing gate / ball Gate / Ball Valve _ Providing and installing gate / ball valves i/c fitting,
6.2 2 valves i/c fitting, painting, testing, complete in all respect painting, testing, complete in all respect 125,440
1 inch dia 4 Rft 5488 21,952
1- 1/2 inch dia 11 Rft 9408 103,488
3 Form, Rebar, Poruing and Striping _ RC Footings 100.00% 131,174,425 0 209 0 209 0 578 183 183
3 Foundation 55000 Cft 720 50.00% 39,600,000 0.00315 173.04 0.00315 173.04 0.0087 478
Steel rebars 182 Ton 362880 66,062,304 0.833 152 0.833 152
3 Plinth Beam 11450 Cft 1027 50.00% 11,759,150 0.00315 36.02 0.00315 36.02 0.0087 100
Steel rebars 38 Ton 362880 13,752,971 0.833 32 0.833 32
Form, Rebar, Poruing and Striping _ Swimming
3 Pool 100.00% 24,205,797
3 RCC Raft of Swimming pool 11150 Cft 720 50.00% 8,028,000 0.00315 35.08 0.00315 35.08 0.0087 97
Steel rebars 37 Ton 362880 13,392,631 0.833 31 0.833 31
3 RCC Wall of Swimming Pool 1250 Cft 1027 50.00% 1,283,750 0.00315 3.93 0.00315 3.93 0.0087 11
Steel rebars 4 Ton 362880 1,501,416 0.833 3 0.833 3
3 Form, Rebar, Poruing and Striping _ lift well 100.00% 10,178,391
3 RCC Raft of Lift Wall 1320 Cft 720 50.00% 950,400 0.00315 4.15 0.00315 4.15 0.0087 11
Steel rebars 4 Ton 362880 1,585,495 0.833 4 0.833 4
3 Lift Well RCC Wall 3430 Cft 1027 50.00% 3,522,610 0.00315 10.79 0.00315 10.79 0.0087 30
Steel rebars 11 Ton 362880 4,119,886 0.833 9 0.833 9
Form, Rebar, Poruing and Striping _ Column
3 Necks 30.00% 28,643,257
3 RCC Columns 12480 Cft 1094 30.00% 13,653,120 0.00315 39.27 0.00315 39.27 0.0087 108
Steel rebars 41 Ton 362880 14,990,137 0.833 34 0.833 34
Archietectural Works 32,090,683
Brick masonary in Foundation upto DPC Level 19,549,400
4 Brick Masonary Works 100.00% 19,549,400
Mezzanine floor (Level 02) 21' 6" (45886 + 4991)= 52560 sft 180,972,165
Concrete / Structural Works 126,291,800
3 Column Necks 25.00% 23,869,381
3 RCC Columns 10400 Cft 1094 25.00% 11,377,600 0.00315 32.72 0.00315 3.44 0.0087 90
Steel rebars 34 Ton 362880 12,491,781 0.833 29 0.833 29
3 RCC Slab & Beams 100.00% 92,369,397
3 RCC Slab 30030 Cft 952 70.00% 28,588,560 0.00315 94.48 0.00315 3.00 0.0087 261
Steel rebars 99 Ton 362880 36,070,018 0.833 83 0.833 83
3 RCC Monolithic beams 12870 Cft 952 30.00% 12,252,240 0.00315 40.49 0.00315 40.49 0.0087 112
Steel rebars 43 Ton 362880 15,458,579 0.833 35 0.833 35
3 RCC Parapet wall 50.00% 9,067,998
3 RCC Parapet wall 3750 Cft 1217 50.00% 4,563,750 0.00315 11.80 0.00315 11.80 0.0087 33
Steel rebars 12 Ton 362880 4,504,248 0.833 10 0.833 10
3 Stair Concrete 33.33% 985,024
3 Stair Concrete 433 Cft 1072 33.33% 464,533 0.00315 1.36 0.00315 1.36 0.0087 4
Steel rebars 1 Ton 362880 520,491 0.833 1 0.833 1
Archietectural Works 54,680,365
Brick Masonary Work 25,799,812
4 Brick Masonary Works 50.00% 25,799,812
4 4.5" thick 1033 Sf 567 50.00% 585,428 0.015 15 0.025 26
4 9" thick 37501 Cft 456 50.00% 17,100,456 0.015 563 0.025 938
4 18" thick 19694 Cft 412 50.00% 8,113,928 0.015 295 0.025 492
Surface Rendering 12,533,424
9 Internal Plaster Ceiling 50.00% 4,102,301
9 Internal Plaster for G/F ceiling 55437 sft 74 50.00% 4,102,301 0.00670 371 0.00670 371
9 Internal Plaster Walls 50.00% 7,163,649
9 Internal Plaster for G/F walls 103821 sft 69 50.00% 7,163,649 0.00670 696 0.00670 696
9 External Plaster Walls 33.33% 1,267,474
9 External Plaster for G/F walls 14569 sft 87 33.33% 1,267,474 0.00670 98 0.00670 98
Flooring 14,160,686
3 Dry Brick Ballast 14.29% 301,561
P/L dry brick ballast over depressed slab or
3 where required to achieve finish floor level. 2452 Cft 123 14.29% 301,561 0.0100 25
3 Base Flooring 50.00% 13,859,125
Providing and laying 1-1/2" to 2" thick PCC 1:2:4
3 for G/F 55437 Cft 250 50.00% 13,859,125 0.00315 174.42 0.00315 174.42 0.0087 482
RCC Lintels 2,186,443
3 RCC Lintels 16.67% 2,186,443
P/L cast-in-situ structuraln cement concret with
(1:2:4) ratio, 3000 psi i/c formwork, scaffolding
3 etc 713 Cft 1072 16.67% 764,693 0.00315 2.24 0.00315 2.24 0.0087 6
Steel rebars 3917 Kgs 363 16.67% 1,421,750 0.833 3,264 0.833 3,264
Roof Floor- Mumtti (Level 06) 66' 6" (1060 sft) 50,305,394
Concrete / Structural Works 5,426,400
3 RCC Slab & Beams 100.00% 5,426,400
3 RCC Slab 3990 Cft 952 70.00% 3,798,480 0.00315 12.55 0.00315 12.55 0.0087 35
3 RCC Monolithic beams 1710 Cft 952 30.00% 1,627,920 0.00315 5.38 0.00315 5.38 0.0087 15
Archietectural Works 44,878,994
Brick Masonary Work 212,710
4 Brick Masonary Works 100.00% 212,710
4 9" thick 445 Cft 478 100.00% 212,710 0.015 7 0.025 11
Surface Rendering 515,830
9 Internal Plaster Ceiling 100.00% 59,096
9 Internal Plaster for Mumty ceiling 664 sft 89 100.00% 59,096 0.00670 4 0.00670 4
9 Internal Plaster Walls 100.00% 103,700
9 Internal Plaster for mumtti walls 1220 sft 85 100.00% 103,700 0.00670 8 0.00670 8
9 External Plaster Walls 100.00% 353,034
9 External Plaster for mumty walls 3566 sft 99 100.00% 353,034 0.00670 24 0.00670 24
Flooring 480,841
3 Dry Brick Ballast 14.29% 301,561
P/L dry brick ballast over depressed slab or
3 where required to achieve finish floor level. 2452 Cft 123 14.29% 301,561 0.00315 7.71 0.00315 7.71
3 Base Flooring 100.00% 179,280
Providing and laying 1-1/2" to 2" thick PCC 1:2:4
3 for Mumty/F 664 Cft 270 100.00% 179,280 0.00315 2.09 0.00315 2.09 0.0087 6
RCC Lintels 2,186,443
3 RCC Lintels 16.67% 2,186,443
P/L cast-in-situ structuraln cement concret with
(1:2:4) ratio, 3000 psi i/c formwork, scaffolding
3 etc 713 Cft 1072 16.67% 764,693 0.00315 2.24 0.00315 2.24 0.0087 6
Steel rebars 3917 Kgs 363 16.67% 1,421,750 0.833 3,264 0.833 3,264
Roof treatment 41,483,170
3 Roof tiles, clay thermopore 60.00% 41,483,170
Providing and fixing_GI pipes and fitting 1 inch dia 205 Rft 461 94,505
Providing and fixing_GI pipes and fitting 1- 1/2
inch dia 88 Rft 629 55,352
Gate / Ball Valve _ Providing and installing
gate / ball valves i/c fitting, painting, testing,
6.2 2 complete in all respect 125,440
1 inch dia 4 Rft 5488 21,952
1- 1/2 inch dia 11 Rft 9408 103,488
Prod/ Equip. Prod/ Equip. Prod/ Equip. Prod/ Equip. Prod/ Equip. Prod/ Prod/
Unit Days Unit Days Unit Days Unit Days Unit Days Unit Equip. Days Unit Equip. Days
0.0020 19
0.0020 13
0.0020 6
5940
20000
496 hrs 10 days
49.6
6.2
Operator Excavator
Activity Qty UOM Prod / Unit Man Days Prod / Unit
Excavtion 144300 Cum
15.25 5 1084 CM
4 CM / day / mason
Mason CM Day
1 4 1
x 1084 1
1/x 4/1084
x 271
sft mason
300 2
1 0.006666666666667
2.01 52.5
Excavator
Man Days
0.002473
0.006129
35.28755
0.011811
Mason lbr
100 2 3
1 0.02 0.03
3080
20.835