The document provides cost details for the DPC Zong Solar Project located in Bheroon Jafarabad, Balochistan. It lists material quantities and unit costs for excavation, backfilling, concrete work, reinforcement, and bricks needed for the construction of a concrete foundation pad and base slab. The foundation pad will require 23.56 cubic meters of excavation, 18.15 cubic meters of backfill, and concrete quantities of 4.44 cubic meters (1:1.5:3 mix) and 1.27 cubic meters (1:4:8 mix) plus rebar and anchor bolts. The base slab will use 5.90 cubic meters of excavation, 2.80 cubic meters of back
The document provides cost details for the DPC Zong Solar Project located in Bheroon Jafarabad, Balochistan. It lists material quantities and unit costs for excavation, backfilling, concrete work, reinforcement, and bricks needed for the construction of a concrete foundation pad and base slab. The foundation pad will require 23.56 cubic meters of excavation, 18.15 cubic meters of backfill, and concrete quantities of 4.44 cubic meters (1:1.5:3 mix) and 1.27 cubic meters (1:4:8 mix) plus rebar and anchor bolts. The base slab will use 5.90 cubic meters of excavation, 2.80 cubic meters of back
The document provides cost details for the DPC Zong Solar Project located in Bheroon Jafarabad, Balochistan. It lists material quantities and unit costs for excavation, backfilling, concrete work, reinforcement, and bricks needed for the construction of a concrete foundation pad and base slab. The foundation pad will require 23.56 cubic meters of excavation, 18.15 cubic meters of backfill, and concrete quantities of 4.44 cubic meters (1:1.5:3 mix) and 1.27 cubic meters (1:4:8 mix) plus rebar and anchor bolts. The base slab will use 5.90 cubic meters of excavation, 2.80 cubic meters of back
SITE ADDRESS: BHEROON JAFARABAD BALOCHISTAN CF1 QT SERIAL NO VOLUME UNIT RATE(PKR) TOTAL COST EXCAVATION 23.56 1940.4 BACKFILL 18.15 CA COL CONCRETE 4.44 (1:1.5:3) CE (1:4:8) 1.27
R/F GRATE 60 404KG
ANCHOR BOLD 4 BOLD PER COL
20MM dia =16 (4SET)
RCC BASE SLAB OF DG PAD (200TH)
SERIAL NO VOLUME CM UNIT RATE(PKR) TOTAL COST EXCAVATION 5.90 1940.4