to caary a service live load 4 kn/m2 assume co-efficent of orthrophy µ=0.75 . Use M-20 grade
of Concrete and Fe 415 Steel . The Design may be Restricted for Bending Only.
1. DESIGN DATA
Longer span of the critical slab ly 6 MM
Shorter span of the critical slab lx 4 MM
Grade of steel fy 415 N/MM2
Grade of concrete fck 20 N/MM2
Live load 4 KN/M2
Floor finish load F.F 1 KN/M2
lyαL
α 0.66666666667
µ Mu longer/Mu shorter 0.75
2. Depth of slab
Over all depth of slab (D) 142.857142857 MM
150 MM
Asumme clear cover as 20 to 30 MM
Effective depth (d) 130 MM
3. Load calcualtion
Dead load 3.75 KN/M2
Live load 4 KN/M2
Floor finish load F.F 1 KN/M2
Total load (W) 8.75 KN/M2
Ultimate load or Factored load (Wu) 13.125 KN/M2
Mu lim (0.138*fck*b*d2)
46.644 KN/M2
Mu ‹ Mu lim Hence slected depth is satisfied
6.Spacing of bars
Sapcing 189.5120980674 MM
Provide 10MM dia bars @ 180MM C/C
c -13623912.4
b 46936.5 *Ast
a -7.4917875 *Ast2
8.Spacing of bars
Sapcing 257.4037221186 MM
Provide 10MM dia bars @ 250MM C/C
Design a Triangular slab ABC is shown in figure, Which is simply supported over the edges
AB and BC and is Isotropically reinforced with 10mm bars with 200 mm C/C, the average
effective depth of reinforcement is 100mm and overall depth of 125 mm. Determine the Live
Load it can carry, If Floor finish is 0.8 Kn/m2, Given M20 Concrete And Fe415 Steel.
1. DESIGN DATA
Grade of steel fy 415 N/MM2
Grade of concrete fck 20 N/MM2
Live load 4 KN/M2
Floor finish load F.F 0.8 KN/M2
L 4M
αL 3M
Ψ 60 Degree
Reinforcement Details.
Dia 10 MM
Spacing 200 MM, C/C
Over all depth of slab (D) 125 MM
Breadth (B) 1000 MM
Clear cover 25 MM
Effective depth (d) 100 MM
4. Load calcualtion
Mu ((Wu*αL*L)/6)*sin(Ψ)2
Wu (Mu*6)/(αL*L*sin(Ψ)2)
8.68204168363 KN/M2
W Wu/1.5
5.78802778909 KN/M2
4. Load calcualtion
Mu (Wu*L2/8)
Wu (Mu*8)/(L2)
13.31897202 KN/M2
W Wu/1.5
8.879314679 KN/M2
4. Load calcualtion
Mu (Wu*R2)/6
Wu (Mu*6)/(R2)
10.96487499 KN/M2
W Wu/1.5
7.309916659 KN/M2
4. Load calcualtion
Mu (Wu*L2/8)
Wu (Mu*8)/(L2)
24.767612 KN/M2
W Wu/1.5
16.51174133 KN/M2
2. Depth of slab
Over all depth of slab (D) 178.571429 MM
180
Asumme clear cover as 20 to 30 MM 25
Effective depth (d) 155 MM
3. Load calcualtion
Dead load 4.5 KN/M2
Live load 4 KN/M2
Floor finish load F.F 1 KN/M2
Total load (W) 9.5 KN/M2
Ultimate load or Factored load (Wu) 14.25 KN/M2
6.Spacing of bars
Provoided 8mm dia bars.