Process description
Operating manual
Commissioning Manual
Alarm and Trip List
Line List
Flare study
Mechanical Equipment specifications
Equipment mechanical design
Equipment Mechanical Data Sheet
Requisition for inquiry
Requisition for purchase
Technical Bid Tabulation
Vendor follow-up
Plant Layout General Plot Plan
Unit Plot Plan
3D model review
Cable schedule
Substation Equipment arrangement drawings
x x
x
x
x
x
x x
Control & ON/OFF valves,
All
analysers, flowmeters, PSVs
x x
x x
x x
x x
preliminary final
(Estimated/Assumptions for Vendor packages) (Includes actual vendor package
consumptions)
x x
x x
x x
x
x
x
x
standard assigned
Preliminary (size of building x
only)
Main routings only all routings
x for additional soil
investigations
General (1:200 scale) Area (1:50 scale)
x x
Main all
If needed to perform MTO
x
x
x x
design construction
x x
preliminary x
General Switchgear's
preliminary final
x x
x x
HV, MV LV
x
design installation
x
preliminary (for bulk: cables all
only)
preliminary final
preliminary (size of sub-station x
only)
Main routings only all routings
Some All
x x
x