· Line List
· Equipment List
· Instrument Hook-up
· System Block Diagrams
· Instrument Index
Electrical Department
· Grounding layouts
· Load List
· Tray Sizing
HVAC Department
· Steel-work Specification
· Road Layouts
· Layout
· Area Mark-up
· Piping Study
· 3D Model
· Construction Isometric
· Intermediate MTO
· Final MTO
· As-Built Drawing
Material
Stress
· Stress Sketches
· Support Drawing
Product Concept
Operating Guidelines
Metro-logical Data
For the Finalization of pipe rack, trenches, and underground facilities (Pipes/Cables).
Zero-Level MTO
Intermediate MTO
Final MTO
Equipment Layout
Piping Department: for preparation of GA key plan and piping lay out.
Civil Department: for equipment foundation location & building layout for designing of
foundation/building.
GA Key Plan
For finalization of exact piping layouts, north/east co-ordinates of match lines which are
required for continuation.
Piping Layouts
Electrical Department: for the development of cable layouts of instruments that are
mounted on pipes.
Instrument Department: for the development of cable layouts of instruments that are
mounted on pipes.
Nozzle Orientation
Mechanical Department: for updating MDS (Mechanical Data Sheet) as an input to the
vendor.
As-built Drawing