0% to 15%
Schematic
Design
Completion
10% to 70%
Accuracy
+30% / -15%
E.TECH For Engineering Services
• In Detailed Stage : Reach an exact cost of the project & help evaluate
contractors bids and prices.
E.TECH For Engineering Services
General Layout
BODR
Design
Cost Team Cost Team Pricing
Department
BOQ
To Client
+40% , -20%
E.TECH For Engineering Services
General Layout
Arch Plans
10% - 70%
Required Data
Check List
BODR
Design
Cost Team Cost Team Pricing
Department
BOQ
To Client
+30% , -15%
E.TECH For Engineering Services
Contracts
Types
Design Built
RE-Measured Lump-Sum Cost Plus
Contract
E.TECH For Engineering Services
Compliance with
Supplier.01
specifications
Financial
Supplier.03
Compliance
E.TECH For Engineering Services
Direct Cost
Indirect Cost
E.TECH For Engineering Services
Direct Cost
Material Accessories
Installation Transportation
Supply Cost Cost
E.TECH For Engineering Services
Indirect Cost
Contract Profit
Sales Taxes 10 – 15%
5%
Site Social
Expenses Insurance
4% 3.6%
Stamp
Head Office
Duties
6%
1.95%
E.TECH For Engineering Services
Electrical Items
LC Equipment LC Outlets
Cams –Detectors - Controllers.. ETC
E.TECH For Engineering Services
[{Item Price + Accessories Price} + Transportation + Installation] x Over Head & Profit
Electrical Outlets:
[({Av. Length x Conduit Price} + {Av. Length x Cable Price} + {Accessories Cost}) +
Transportation + Installation] x Over Head & Profit