Professional Documents
Culture Documents
OVERVIEW:
PK61-P
K67
(L=211
Section A - A SC 1:25
.55m)
61
Pk.
~ ~ DN32
xingato Pk.e9
165/6
12/16 36/15
36/16 35/9 48/1
existing ~
20/15 261 81/5 81/20 165/8
35/13 42/4 42/3
~ 35/12 ~ 54/2 Pk.e8
18/48
17/39
60
36/18 ~
Pk. ~ 53/2
165/7
35/10
13/17 ~ 259
Pk.e7 81/4 81/17 81/23 165/5
13/16 20/14 ~ ~
~ 36/17
36/19 ~
40/2
54/1
53/3
~ 81/19
EXISTIN
OD90L=140.
40/1
59
~ 40
81/22 165/4
Pk.
54/4 52/2
17/38
~
25
HDPE53
18/47 39/1
~
G STEEL
41/1 Pk.e6 165/2
255
EXISTIN
18/46
Cocnrete pipe Crossing 257
52/1
81/1
PN10
40/4 81/22
OD 80cm ~ 39/2 54/3
~ 81/18
13/16 20/13
Cocnrete pipe Crossing 36/21
~
PIPE
G DCI
40/3 ~ 0
OD 80cm PK5 OD 36/20
~ 41/2 ~ Pk.e5 81/21
PN1
6-P 280
DN500
54/6
PE
PIPE
100
K61 HD 260 52/3 81/21 HD
DN
(L=1PE
39/3
75
58
Aspha
pipe
PN1
DN800
40/5
~
Pk.
81/2 OD
78.0 36/23
lt
54/5 er
0 ~
ply
52/4
12/15 3m
sup
Pk.e4 feed
17/37 ) ~ 41/3 54/8
~ ting
ting
20/12
238 Pk.e3
exis
234
55/7 54/7 165/3 exis
13/15 18/45 36/22 ~ ~ ~ 52/5
81/3
existing
55/6 54/10
236
57
~ ~ Pk.e2 64
Pk.
exist
17/36 55/9
36/26
30
20/11
13/15 256
OD32
~ 52/6
ing
55/2
~ 55/8
18/44
10 54/9
OD3
~
310
~
OD1
15
~ Steel
PK56
165/18
OD28
36/25
2
18/43
existing DN159
263
10
55/1 55/5
-PK61
20/10 55/3 existing DN159 Steel Pk.e1
0 HDPE
~ ~
HDP
55/11
TRA-NP060
existing
64
55/10
E PN10
(L=17
20/9 165/22
55/4
56
PN10 )
Pk.
8.03m
OD25
20/8 262
12/14 258 61/2
17/35
235 20/7 ~ 56/3 61/1
40
existing DN159 Steel
17/34
56/1 ~ PE 56/8
~ 165/13
56/2
13/14
17/32 20/6 37/1
g OD32 ~ 165/21
13/14 20/5 Pk.
55/1
~ ~ 56/6 existin 165/17
Cocnrete pipe Crossing ~ 61/3 61/4
233 OD 100cm
~ 56/7 ~
OD50
37/2 65
17/33
17/31
56/9
~
10
~56/5 56/10
PN
HDPE
61/6 165/16
18/19 20/4
55 165/20
PE
56/11
Pk.
~ ~ 56/21
~ ~
HD
100
61/5
56/4 PE
PN10
10
DN
75
38/2 OD32
OD
17/29
12/13 ng ~
pipe
56/13
existi
der
56/20
20/3 ~ ~ ~
ply
13/13
~
fee
18/42 63 165/12 165/15
sup
56/12
~
ting
61/8
17/30 38/1
~ ~
ting
56/15
exis
TROKAJ
20/2
exis
61/7
56/14 56/22
Aspha
12/12 38/3
~ ~ ~
lt
54
Lifting hook
56/16 165/10
13/12 61/9 165/14
10 25 260 25 10
237 Pk. 56/18
~ 165/11
Cocnrete pipe Crossing 38/4 77/6
60/6
17/27 OD 100cm 56/25
12/10
13/11
~ ~ ~ 77/1
00
17/25 20/1 56/17
DN1
12/11 18/41
264 ~ 77/5
ting
17/24
~
Pk.d16
56/27
~
Pk.d15
Pk.d17
52
exis
Pk. 60/5
20
Pk.d18
~
Pk.d14
18/18 38/5
Pk.d19
60/3
56/26 TRA-NP059
~
30
165/9
Pk.d13
17/23 60/4
12/9
PN10
Pk.d12
12/10
HDPE
Pk.d11
38/6
51
Pk.
OD32 ~ 77/4
12/8 13/10 60/2
Pk.d10
17/22
~ ~
Pk.d9
50
18/16 67/4
Pk.
234 18/17 77/1 77/3
60/1 0 77/2
30
Pk.d8
265
PN1 ~
49
12/9
18/40 E
Pk.
17/21
59 5 76/8
HDP 67/3
12/7 90.6 67/2
110 ~
Pk.d7
OD L=1
76/7
Pk. 48
47/1
67/1
40
Pk.d6
67/6 76/1
Pk.
18/15
~
Pk.d5
25
12/8
13/9
11/6 17/20
Pk.d4
266 76/2
12/7 17/19 239
18/14
Cocnrete pipe Crossing PN10 76/5
~ ~ 78
47
76/10
13/8 18/13 OD 100cm HDPE
Pk.
12/6 67/5
12/6 76/6
18/39 OD1 68/1 r OD90
Pk.d3
PK4 OD280
6-PK
10
HDP ng
feede 20 76/3
46
18/12 76/3 76/4
17/17
(L=2 E PN1 68/2
~ 79
Pk.
76/9
0
18/11 41.4 0 75/1
Pk.d2
13/9 73
4m)
Pk.d1
18/10
45
12/7 18/40
Pk.
68/3
Connection to existing water
Aspha
18/16 75/2
lt
12/6 network village Trokaj
11/6
13/8 17/18 ~ ~
13/7 Cocnrete pipe Crossing 44 76/9
0
68/3
OD 100cm Pk.
OD9
er
er ation
rvoir feed
78
PK43
OD2 -PK4
17/17
pipe
18/15 75/2
feed oper
rese ing
12/6 17/16
80 6 (L=8
10
aj exist
18/39
ing in
HDP
12/5
exist keep
Trokn to
79
233 Pk.c35
E PN1 m)
pipe ectio
1.60
~ 75/3
to
Conn
18/38
~
17/15 237 18/12
TRA-NP058 ~ ~
Pk.c34
18/14
Cocnrete pipe Crossing 69/1 266 ~
)
PN1
TRA-NP011
07m
12/4 OD 100cm
03. 0
11/7 18/10 75/3
(L=3 PN1
Pk. 43/1 PN10
c50HDPEPE
Pk. 43 HDPE
Pk.c33
18/13
HD
74
OD90 4m
0
.47 PN1
42
L=16.8
c34OD160160
13/6 Pk. 73
TRA-EFM01
OD
L=4 PE
Pk. 41/1
-PK
m
TRA-NP010 Box for EFM
DN80
Pk.c32
80/2
HD
235 18/11 data logger
12/5 TRA-NP010/1
90
COC 02 - Concrete Chamber 69/2
existing of operation
OD
PK
for Flow Control Valve installation E
Cocnrete pipe Crossing
18/37 COC-LAY001 HDP
Pk.c31
OD 100cm 5 n
out
12/3
~ 82/1
OD7 ratio
feeder
72/1
13/5 80/3
ope
Pk.c30
tingof
234 17/14
25
25
exisout
Pk.c29
82/7
pipe OD90
PN10
18/9
~ ~ )
74 0 HDPE PN10 8.08m
12/4 OD16 0 HDPE
(L=37
72/2 OD16 c34
Pk. 41 c3-PK
Pk.c28
Asphalt 85/2
Pk.c27
80/4 PK
18/8
~
Pk.c26
236
PK34-
OD28
85/1
Pk.c25
PK43
0 HDPE
12/3 18/36 85/6
Pk. 40 85/5
228 ~
(L=281
12/2
Pk.c24
17/13
PN10
25
25
.07m)
13/4 267
Pk.c24
12/2 85/8
Asphalt
69/3
18/35 18/6 20/1
83/4 85/7
30
0
80/1
8m)
PN1
78.0 0
(L=3 E PN1
20
10 239 82/8
K c34 HDP E
80/1
c3-P 60 HDP
18/7 39/1 Pk.c23
84/1 86/12
Pk.
~
PK OD1 160
71/1
OD
Cocnrete pipe Crossing Pk.c22
83/3
17/11 39
OD 100cm Pk. ~
Aspha
12/1 Pk.c21
9/55 17/10 85/9 86/13
lt
18/34
83/2
~ Pk.c20 ~
84/2
13/3 17/9
38
~
Pk.
82/9
Pk.c19
71/2
84/4
84/3
18/33 18/5 69/4 82/9 20 E
83/1
84/5
~
HDP ~
Pk.c18
5 n
9/56 OD7 ratio
~
84/7
~
tingof ope
17/8 84/7
Pk.c17
10/15 10/15
18/3
37 84/9 exisout 268
Pk. Asphalt
~
Pk.c16
OD5 p
18/4
Kee
Pk.c15
~
84/6
0 in ope
18/32 94/22
HDP
94/21
HAMATAJ
9/57 84/10
E ratio
13/2 Pk.c14
PN1 n
10/14 TRA-NP053
~
Aspha
84/8
0
Pk.c13
~
lt
9/58
84/11
Connection to existing water PN10
17/7 17/5
Pk.
36 network village Hamataj HDPE tion 94/12
~ 94/13
17/6 69/5 Pk.c12 84/9
OD32 in opera
PK c3-PK
18/31
PK3 OD ~
OD160 HDPE
OD160 c34 (L=378
94/17
10/14 Box Culvert Crossing Keep 94/20
13/1 4-P 280 r
238 K43 HD ~
exis
wate
(L=2PE
70/1
2KT
~ ~
HDPE PN10
ing
~
ting
Pk.c11
10/13 PN1 exist ataj 94/16
~
81. ~
out
18/29 268
n to e Ham
229
feed ope
18/30 18/2
17/4
07m 070/2 TRA-NP003
of
94/19
PN10
~
er ratio
2KT ectio villag
) ~
pipe n
17/3 Pk.c10 Conn ork ~
.08m)
94/11
9/59 35 Pk.c9
OD
netw
Pk. 70/3 Pk.c8 OD50 ~ 94/15
75
34 Pk.c7 Box Culvert Crossing HDPE ~
Bridge Crossing Typ1 Pk. exisitng Bridge Pk.c6 PN10
E
10/12 94/18
33
HDP
14/15
BRC-DET001 Pk. 1KT
94/10
TRA-NP002 94/14 ~
0
10/13
ratio0
18/27 Pk. 32 94/8
~
of OD9
PN1
Asphalt
Pk.c1
18/28
~
Pk.c2
Pk.c5Pk.c4
9/60 PN16
70 30
River Crossing 01 0
ope
out ting
30
E
10/11 17/2
9/61 RIC-DET001 & 002 DN30 PN16
0 HDP
Pk.
DI
Pk.c3
exis
Pipe 0Bridge Gravel
~ ~
31
TRA-NP057 DCI DN15 OD16
COC 01 - Concrete Chamber
94/5 ~
exisitng
~
OD5
Pipe 0 TRA-NP009
Pk.f1
DCI PK OD90 HDPE for Flow Control Valve installation 94/9 94/7
18/1
c1-PK HDPE PN10
Gravel
94/2
COC-LAY001
Pk.
Pk.
Pk.f2
10/12
Gravel c3 (L=17PN10 ~ ~
29/1
30
Pk. 29
18/26
OD75 n
HDPE .87m ~
)
Pk.f3
existingof operatio
10
~ ~ ~
40
9/62 out 97/1
~
OD1 PK 03.6
94/6
Pk. 28
94/1
Pump sump
OD50
Pk.f4
18/25
14/14 HDPE
60 f1-P 1m)
Gravel
~ PN10
(L=1
HDP K f12
10/11
existinin opera
keep
~ Pk.f5 94/3 ~
E
Pk.
17/1 94/4
PN1
27
g OD75 tion
0
Pk.f6
9/63
14/13
2KT
Pk. 26
PE
18/24
~
Pk.f7
Gravel
10/10
exis
out
Gravel
Pk.f8
ting
25
of
Pk. 25
Cocnrete pipe Crossing
ope
10/10
18/23
OD
OD 100cm 90
rati
228
40x40x25cm
20
Pk.f9
HD
on
~ PE
Keep in operation
Pk. 24
14/12
40
TRA-NP007
Gravel
Pk.f10
18/22 PN16 42m) OD75 HDPE PN10
30 70
HDPE
Gravel
(L=249.
15
Pk.f11
Pk.f12
OD315 K29/1
10
Pk. 23
Connection to existing97/1
water
18/21
PK23-P network village Hamataj
TRC 02 - Trench Crossing
TRC-DET001 Gravel
~
Pk. 22
14/11
Pk. 21/1
10/9 surface
natural PN16 )
HDPE =41.31m
OD315 -PK23(L
Pk.
16/5
Cocnrete pipe Crossing PK21/1 ~ ~
21
surface
18/20 OD 115cm natural
14/10 97/2
Highway Crossing 01 ~ ~
Pk. 20
Pk.
HWC-DET001
PN16
19
Pk. 18
surface
DN300 natural
Pipe 4m)
DCI PN16
Pk. 17/1
10/8
HDPE (L=91.6
OD315 -PK21/1
102/1 30
Pk. 17
9/7 16/4 104/1
TRC 01 - Trench Crossing PK17/1
Pk. 16/1
TRC-DET001
Pk. 16
14/8
10/7 surface
14/9
natural
~ ~
Pk.
98/18
15
20/1
PN16 29m)
10/6 16/3
HDPE (L=107.
OD315 -PK16/1
Pk. 14
surface
natural
Pk. 13/1
9/6 Asphalt
14/7
HDPE (L=58.8 232
104/2
OD315 K13/1
Pk. 13
PK12-P Asphalt
Gravel
Pk. 12
16/2 102/2
9/7
10/5
Pk. 11
102/3
Excavated
106/1
Pk. 10
231
229 98/17
14/6
10
9/5
Pk. 9
230
10/4
Excavated
16/1
104/3
Pk. 8
Gravel
102/3
9/6
102/4
106/2
Pk. 7
14/5
Gravel
EXISTIN
material
15m) Gravel
EXISTIN
12 (L=328.
Pk. 6
14/3
PK1-PK
G STEEL
14/4
10/3
PN16
G DCI
HDPE
material
9/4 OD315 102/4
Pk. 5
9/5
104/4
Cocnrete pipe Crossing
PIPE
PIPE
Gravel
OD 100cm 102/5 98/3
Connection to existing
DN800
DN500
Pk. 4
transmission main DN500
installed by UK Fier
material
Pk. 3
14/2
107/1
TRA-EFM12
Pk. 2
9/4 DN250
Gravel
Valve Chamber 98/2
Pump sump
40x40x25cm
Clorination Point
Box for EFM
data logger
Pk. 1
Fier TRA-NP001
UK 14/1
d by PN16 TRA-NP001
106/3
15
9/3 installe HDPE CHAMBER 108
104/5
OD315 Main valve chamber 102/5
connections to villages
out of operation 102/6
10/2
107/2
9/3
9/2
out of operation
~ 238
102/6 102/7
10/1
107/3
Fier
by UK PN16
~ 159/1
installedHDPE 104/6
OD315
25
110
9/2
106/4
107/4
159/2
9/1
102/7
Gravel
102/8
180
180
9/1 112/1
113/1 159/3
113/2 104/7
Fier
by UK PN16
159/4
106/5 102/8
20
Stairs
115/1
installed HDPE 159/5
OD315 274
material
102/9
229 159/6
New Pumping
159/7
115/3 115/2 112/2
113/3
113/1
159/8
113/4 102/9
115/4 107/5 159/10
104/8
119
15
112/8
102/10
113/3 159/11
272
112/3
Station
276
275 159/12
107/7
106/7
100/1
113/6
112/4
159/13 176/27
102/10
107/8
~
104/10
118/1
113/7
100/2
107/9
104/11
118/4 102/11
112/5
106/8
10
118/2
113/8
10
107/10
102/11
100/3
118/3 104/12
113/9
106/9
100/4
279
118/2
~
290
240
240
112/6 107/11
118/5
156/42
310
310
118/3
156/41 104/13
112/7
156/40 113/10
156/43
102/12
107/12
113/11
106/10
156/39 102/12
100/5
118/6
156/38
156/33 104/14
156/37
156/32 277 162/36
156/36
156/42
156/35
113/12 159/1
113/13 160/1
156/34
156/41
10
156/31
x
156/29 159/2
362/35
160/2
156/40
x
164/20
279 162/39
156/28
156/39 156/30
113/14
156/38
164/19
156/34 156/27
156/37
226 159/3 162/38
161/1
156/44 156/36 160/3
162/37
156/35 164/18
278
156/31
156/24
156/33 162/36
160/4
156/32 156/26 159/4
113/15
156/21 161/2
164/17
156/25
156/30
156/23
156/19
159/5
160/5
156/29 164/21
156/22 156/20
158 156/18 161/3
156/17 162/32
164/22
156/16
156/30 113/16
113/17 160/6
118/7
118/9 161/4
118/8 156/44 156/29 156/27 159/6
164/25
156/26 160/7
159/7
REFERENCE DRAWINGS:
DRAWING TITLE: DRAWING NO: SHEET:
A A L E G E N D & NOTES:
80
80
Water stop for
construction joint
Water stop for
25
25
construction joint
25
25
10
10 5
10 5
Pump sump
40x40x25cm
Blinding 5cm
B
Gravel 10cm
99 50 111
10 25 260 25 10
310
25
25
Gravel Excavated
Excavated material material
material
70 30 30 70
Gravel
material B Second Issue As Built Drawing 13-04-2017
REVISIONS
260
310
Engineer:
285
335
Contractor:
Client:
25
10 5
Project:
25
FIE-DRW-TRA-W-CHA1
GENERAL KEYPLAN
OVERVIEW:
PK61-P
K67
(L=211
.55m)
61
Pk.
~ ~ DN32
xingato Pk.e9
165/6
12/16 36/15
36/16 35/9 48/1
existing ~
20/15 261 81/5 81/20 165/8
35/13 42/4 42/3
~ 35/12 ~ 54/2 Pk.e8
18/48
17/39
60
36/18 ~
Pk. ~ 53/2
165/7
35/10
13/17 ~ 259
Pk.e7 81/4 81/17 81/23 165/5
13/16 20/14 ~ ~
~ 36/17
36/19 ~
40/2
54/1
53/3
~ 81/19
EXISTIN
OD90L=140.
40/1
59
~ 40
81/22 165/4
Pk.
54/4 52/2
17/38
~
25
HDPE53
18/47 39/1
~
G STEEL
41/1 Pk.e6 165/2
255
EXISTIN
18/46
Cocnrete pipe Crossing 257
52/1
81/1
PN10
40/4 81/22
OD 80cm ~ 39/2 54/3
~ 81/18
13/16 20/13
Cocnrete pipe Crossing 36/21
~
PIPE
G DCI
40/3 ~ 0
OD 80cm PK5 OD 36/20
~ 41/2 ~ Pk.e5 81/21
PN1
6-P 280
DN500
54/6
PE
PIPE
100
K61 HD 260 52/3 81/21 HD
DN
(L=1PE
39/3
75
58
Aspha
pipe
PN1
DN800
40/5
~
Pk.
81/2 OD
78.0 36/23
lt
54/5 er
0 ~
ply
52/4
12/15 3m
sup
Pk.e4 feed
17/37 ) ~ 41/3 54/8
~ ting
ting
20/12
238 Pk.e3
exis
234
55/7 54/7 165/3 exis
13/15 18/45 36/22 ~ ~ ~ 52/5
81/3
existing
55/6 54/10
236
57
~ ~ Pk.e2 64
Pk.
exist
17/36 55/9
36/26
30
20/11
13/15 256
OD32
~ 52/6
ing
55/2
~ 55/8
18/44
10 54/9
OD3
~ ~
OD1
15
~ Steel
PK56
165/18
OD28
36/25
2
18/43
existing DN159
263
10
55/1 55/5
-PK61
20/10 55/3 existing DN159 Steel Pk.e1
0 HDPE
~ ~
HDP
55/11
TRA-NP060
existing
64
55/10
E PN10
(L=17
20/9 165/22
55/4
56
PN10 )
Pk.
8.03m
OD25
20/8 262
12/14 258 61/2
17/35
235 20/7 ~ 56/3 61/1
40
existing DN159 Steel
17/34
56/1 ~ PE 56/8
~ 165/13
56/2
13/14
17/32 20/6 37/1
g OD32 ~ 165/21
13/14 20/5 Pk.
55/1
~ ~ 56/6 existin 165/17
Cocnrete pipe Crossing ~ 61/3 61/4
233 OD 100cm
~ 56/7 ~
OD50
37/2 65
17/33
17/31
56/9
~
10
~56/5 56/10
PN
HDPE
61/6 165/16
18/19 20/4
55 165/20
PE
56/11
Pk.
~ ~ 56/21
~ ~
HD
100
61/5
56/4 PE
PN10
10
DN
75
38/2 OD32
OD
17/29
12/13 ng ~
pipe
56/13
existi
der
56/20
20/3 ~ ~ ~
ply
13/13
~
fee
18/42 63 165/12 165/15
sup
56/12
~
ting
61/8
17/30 38/1
~ ~
ting
56/15
exis
TROKAJ
20/2
exis
61/7
56/14 56/22
Aspha
12/12 38/3
~ ~ ~
lt
17/28
54 56/19 56/23
Pk.
56/16 165/10
13/12 61/9 165/14
00
17/25 20/1 56/17
DN1
12/11 18/41
264 ~ 77/5
ting
17/24
~
Pk.d16
56/27
~
Pk.d15
Pk.d17
52
exis
Pk. 60/5
20
Pk.d18
~
Pk.d14
18/18 38/5
Pk.d19
60/3
56/26 TRA-NP059
~
30
165/9
Pk.d13
17/23 60/4
12/9
PN10
Pk.d12
12/10
HDPE
Pk.d11
38/6
51
Pk.
OD32 ~ 77/4
12/8 13/10 60/2
Pk.d10
17/22
~ ~
Pk.d9
50
18/16 67/4
Pk.
234 18/17 77/1 77/3
60/1 0 77/2
30
Pk.d8
265
PN1 ~
49
12/9
18/40 E
Pk.
17/21
59 5 76/8
HDP 67/3
12/7 90.6 67/2
110 ~
Pk.d7
OD L=1
76/7
Pk. 48
47/1
67/1
40
Pk.d6
67/6 76/1
Pk.
18/15
~
Pk.d5
25
12/8
13/9
11/6 17/20
Pk.d4
266 76/2
12/7 17/19 239
18/14
Cocnrete pipe Crossing PN10 76/5
~ ~ 78
47
76/10
13/8 18/13 OD 100cm HDPE
Pk.
12/6 67/5
12/6 76/6
18/39 OD1 68/1 r OD90
Pk.d3
PK4 OD280
6-PK
10
HDP ng
feede 20 76/3
46
18/12 76/3 76/4
17/17
(L=2 E PN1 68/2
~ 79
Pk.
76/9
0
18/11 41.4 0 75/1
Pk.d2
13/9 73
4m)
Pk.d1
18/10
45
12/7 18/40
Pk.
68/3
Connection to existing water
Aspha
18/16 75/2
lt
12/6 network village Trokaj
11/6
13/8 17/18 ~ ~
13/7 Cocnrete pipe Crossing 44 76/9
0
68/3
OD 100cm Pk.
OD9
er
er ation
rvoir feed
78
PK43
OD2 -PK4
17/17
pipe
18/15 75/2
feed oper
rese ing
12/6 17/16
80 6 (L=8
aj exist
18/39
ing in
HDP
12/5
exist keep
Trokn to
79
233 Pk.c35
E PN1 m)
pipe ectio
1.60
~ 75/3
to
Conn
18/38
~
17/15 237 18/12
TRA-NP058 ~ ~
Pk.c34
18/14
Cocnrete pipe Crossing 69/1 266 ~
)
PN1
TRA-NP011
07m
12/4 OD 100cm
03. 0
11/7 18/10 75/3
(L=3 PN1
Pk. 43/1 PN10
c50HDPEPE
Pk. 43 HDPE
Pk.c33
18/13
HD
74
OD90 4m
0
.47 PN1
42
L=16.8
c34OD160160
13/6 Pk. 73
TRA-EFM01
OD
L=4 PE
Pk. 41/1
-PK
m
TRA-NP010 Box for EFM
DN80
Pk.c32
80/2
HD
235 18/11 data logger
12/5 TRA-NP010/1
90
COC 02 - Concrete Chamber 69/2
existing of operation
OD
PK
for Flow Control Valve installation E
Cocnrete pipe Crossing
18/37 COC-LAY001 HDP
Pk.c31
OD 100cm 5 n
out
12/3
~ 82/1
OD7 ratio
feeder
72/1
13/5 80/3
ope
Pk.c30
tingof
234 17/14
exisout
Pk.c29
82/7
pipe OD90
PN10
18/9
~ ~ )
74 0 HDPE PN10 8.08m
12/4 OD16 0 HDPE
(L=37
72/2 OD16 c34
Pk. 41 c3-PK
Pk.c28
Asphalt 85/2
Pk.c27
80/4 PK
18/8
~
Pk.c26
236
PK34-
OD28
85/1
Pk.c25
PK43
0 HDPE
12/3 18/36 85/6
Pk. 40 85/5
228 ~
(L=281
12/2
Pk.c24
17/13
PN10
.07m)
13/4 267
Pk.c24
12/2 85/8
Asphalt
69/3
18/35 18/6 20/1
83/4 85/7
30
0
80/1
8m)
PN1
78.0 0
(L=3 E PN1
20
10 239 82/8
K c34 HDP E
80/1
c3-P 60 HDP
18/7 39/1 Pk.c23
84/1 86/12
Pk.
~
PK OD1 160
71/1
OD
Cocnrete pipe Crossing Pk.c22
83/3
17/11 39
OD 100cm Pk. ~
Aspha
12/1 Pk.c21
9/55 17/10 85/9 86/13
lt
18/34
83/2
~ Pk.c20 ~
84/2
13/3 17/9
38
~
Pk.
82/9
Pk.c19
71/2
84/4
84/3
18/33 18/5 69/4 82/9 20 E
83/1
84/5
~
HDP ~
Pk.c18
5 n
9/56 OD7 ratio
~
84/7
~
tingof ope
17/8 84/7
Pk.c17
10/15 10/15
18/3
37 84/9 exisout 268
Pk. Asphalt
~
Pk.c16
OD5 p
18/4
Kee
Pk.c15
~
84/6
0 in ope
18/32 94/22
HDP
94/21
HAMATAJ
9/57 84/10
E ratio
13/2 Pk.c14
PN1 n
10/14 TRA-NP053
~
Aspha
84/8
0
Pk.c13
~
lt
9/58
84/11
Connection to existing water PN10
17/7 17/5
Pk.
36 network village Hamataj HDPE tion 94/12
~ 94/13
17/6 69/5 Pk.c12 84/9
OD32 in opera
PK c3-PK
18/31
PK3 OD ~
OD160 HDPE
OD160 c34 (L=378
94/17
10/14 Box Culvert Crossing Keep 94/20
13/1 4-P 280 r
238 K43 HD ~
exis
wate
(L=2PE
70/1
2KT
~ ~
HDPE PN10
ing
~
ting
Pk.c11
10/13 PN1 exist ataj 94/16
~
81. ~
out
18/29 268
n to e Ham
229
feed ope
18/30 18/2
17/4
07m 070/2 TRA-NP003
of
94/19
PN10
~
er ratio
2KT ectio villag
) ~
pipe n
17/3 Pk.c10 Conn ork ~
.08m)
94/11
9/59 35 Pk.c9
OD
netw
Pk. 70/3 Pk.c8 OD50 ~ 94/15
75
34 Pk.c7 Box Culvert Crossing HDPE ~
Bridge Crossing Typ1 Pk. exisitng Bridge Pk.c6 PN10
E
10/12 94/18
33
HDP
14/15
BRC-DET001 Pk. 1KT
94/10
TRA-NP002 94/14 ~
0
10/13
ratio0
18/27 Pk. 32 94/8
~
of OD9
PN1
Asphalt
Pk.c1
18/28
~
Pk.c2
Pk.c5Pk.c4
9/60 PN16
River Crossing 01 0
ope
out ting
30
E
10/11 17/2
9/61 RIC-DET001 & 002 DN30 PN16
0 HDP
Pk.
DI
Pk.c3
exis
Pipe 0Bridge Gravel
~ ~
31
TRA-NP057 DCI DN15 OD16
COC 01 - Concrete Chamber
94/5 ~
exisitng
~
OD5
Pipe 0 TRA-NP009
Pk.f1
DCI PK OD90 HDPE for Flow Control Valve installation 94/9 94/7
18/1
c1-PK HDPE PN10
Gravel
94/2
COC-LAY001
Pk.
Pk.
Pk.f2
10/12
Gravel c3 (L=17PN10 ~ ~
29/1
30
Pk. 29
18/26
OD75 n
HDPE .87m ~
)
Pk.f3
existingof operatio
10
9/62 out 97/1
~ ~ ~
~
OD1 PK 03.6
94/6
Pk. 28
94/1
OD50
Pk.f4
18/25
14/14 HDPE
60 f1-P 1m)
Gravel
~ PN10
(L=1
HDP K f12
10/11
existinin opera
keep
~ Pk.f5 94/3 ~
E
Pk.
17/1 94/4
PN1
27
g OD75 tion
0
Pk.f6
9/63
14/13
2KT
Pk. 26
PE
18/24
~
Pk.f7
Gravel
10/10
exis
out
Gravel
Pk.f8
ting
25
of
Pk. 25
Cocnrete pipe Crossing
ope
10/10
18/23
OD
OD 100cm 90
rati
228
20
Pk.f9
HD
on
~ PE
Keep in operation
Pk. 24
14/12
TRA-NP007
Gravel
Pk.f10
18/22 PN16 42m) OD75 HDPE PN10
HDPE
Gravel
(L=249.
15
Pk.f11
Pk.f12
OD315 K29/1
10
Pk. 23
Connection to existing97/1
water
18/21
PK23-P network village Hamataj
TRC 02 - Trench Crossing
TRC-DET001 Gravel
~
Pk. 22
14/11
Pk. 21/1
10/9 surface
natural PN16 )
HDPE =41.31m
OD315 -PK23(L
Pk.
16/5
Cocnrete pipe Crossing PK21/1 ~ ~
21
surface
18/20 OD 115cm natural
14/10 97/2
Highway Crossing 01 ~ ~
Pk. 20
Pk.
HWC-DET001
PN16
19
Pk. 18
surface
DN300 natural
Pipe 4m)
DCI PN16
Pk. 17/1
10/8
HDPE (L=91.6
OD315 -PK21/1
102/1 30
Pk. 17
9/7 16/4 104/1
TRC 01 - Trench Crossing PK17/1
Pk. 16/1
TRC-DET001
Pk. 16
14/8
10/7 surface
14/9
natural
~ ~
Pk.
98/18
15
20/1
PN16 29m)
10/6 16/3
HDPE (L=107.
OD315 -PK16/1
Pk. 14
surface
natural
Pk. 13/1
9/6 Asphalt
14/7
HDPE (L=58.8 232
104/2
OD315 K13/1
Pk. 13
PK12-P Asphalt
Gravel
Pk. 12
16/2 102/2
9/7
10/5
Pk. 11
102/3
106/1
Pk. 10
231
229 98/17
14/6
10
9/5
Pk. 9
230
10/4
16/1
104/3
Pk. 8
Gravel
102/3
9/6
102/4
106/2
Pk. 7
14/5
EXISTIN
15m) Gravel
EXISTIN
12 (L=328.
Pk. 6
14/3
PK1-PK
G STEEL
14/4
10/3
PN16
G DCI
HDPE
9/4 OD315 102/4
Pk. 5
9/5
104/4
Cocnrete pipe Crossing
PIPE
PIPE
Gravel
OD 100cm 102/5 98/3
Connection to existing
DN800
DN500
Pk. 4
transmission main DN500
installed by UK Fier
Pk. 3
14/2
107/1
TRA-EFM12
Pk. 2
9/4 DN250
Gravel
Valve Chamber 98/2
Pump sump
40x40x25cm
Clorination Point
Box for EFM
data logger
Pk. 1
Fier TRA-NP001
UK 14/1
d by PN16 TRA-NP001
106/3
15
9/3 installe HDPE CHAMBER 108
104/5
OD315 Main valve chamber 102/5
connections to villages
out of operation 102/6
10/2
107/2
9/3
9/2
out of operation
~ 238
102/6 102/7
10/1
107/3
Fier
by UK PN16
~ 159/1
installedHDPE 104/6
OD315
25
110
9/2
106/4
107/4
159/2
9/1
102/7
102/8
9/1 112/1
113/1 159/3
113/2 104/7
Fier
by UK PN16
159/4
115/1
installed HDPE
106/5 102/8
159/5
20
OD315 274
102/9
229 159/6
New Pumping
159/7
115/3 115/2 112/2
113/3
113/1
159/8
113/4 102/9
115/4 107/5 159/10
104/8
119
15
112/8
102/10
113/3 159/11
272
112/3
Station
276
275 159/12
107/7
106/7
100/1
113/6
112/4
159/13 176/27
102/10
107/8
~
104/10
118/1
113/7
100/2
107/9
104/11
118/4 102/11
112/5
106/8
10
118/2
113/8
10
107/10
102/11
100/3
118/3 104/12
113/9
106/9
100/4
279
118/2
118/5
112/6 107/11 ~
156/42
118/3
156/41 104/13
112/7
156/40 113/10
156/43
102/12
107/12
113/11
106/10
156/39 102/12
100/5
118/6
156/38
156/33 104/14
156/37
156/32 277 162/36
156/36
156/42
156/35
113/12 159/1
113/13 160/1
156/34
156/41
10
156/31
x
156/29 159/2
362/35
160/2
156/40
x
164/20
279 162/39
156/28
156/39 156/30
113/14
156/38
164/19
156/34 156/27
156/37
226 159/3 162/38
161/1
156/44 156/36 160/3
162/37
156/35 164/18
278
156/31
156/24
156/33 162/36
160/4
156/32 156/26 159/4
113/15
156/21 161/2
164/17
156/25
156/30
156/23
156/19
159/5
160/5
156/29 164/21
156/22 156/20
158 156/18 161/3
156/17 162/32
164/22
156/16
156/30 113/16
113/17 160/6
118/7
118/9 161/4
118/8 156/44 156/29 156/27 159/6
164/25
156/26 160/7
159/7
REFERENCE DRAWINGS:
DRAWING TITLE: DRAWING NO: SHEET:
L E G E N D & NOTES:
THE PLAIN COVERAGE SLAB 2 THE PLAIN COVERAGE SLAB SC1:20 THE PLAIN COVERAGE SLAB 1
310
160 290 130
130 30 130 30 30 100 30 100
25
No.
Rev DESCRIPTION DATE
REVISIONS
Lifting hook
Lifting hook
Engineer:
ganxhe
ganxhe
SETEC Engineering GMBH & CO. KG
60
60
Contractor:
30
Client:
Beam T-1
Trau T-1
Soleta S-1
Slab S-1
Financier:
Beam T-1
Beam T-1
270
270
290
270
Kreditanstalt für Wiederaufbau and European Union
Trau T-1
Trau T-1
Trau T-2
Beam T-2
Beam T-2
Trau T-2
Soleta S-2
Slab S-2
Soleta S-2
Slab S-2
Project:
MUNICIPAL INFRASTRUCTURE I
(BMZ 2009 66 523, 2020 59 988)
and MUNICIPAL INFRASTRUCTURE II
155
155
FIE-DRW-TRA-W-CHA2
GENERAL KEYPLAN
OVERVIEW:
PK61-P
K67
(L=211
.55m)
61
Pk.
~ ~ DN32
xingato Pk.e9
165/6
12/16 36/15
36/16 35/9 48/1
existing ~
20/15 261 81/5 81/20 165/8
35/13 42/4 42/3
~ 35/12 ~ 54/2 Pk.e8
18/48
17/39
60
36/18 ~
Pk. ~ 53/2
165/7
35/10
13/17 ~ 259
Pk.e7 81/4 81/17 81/23 165/5
13/16 20/14 ~ ~
~ 36/17
36/19 ~
40/2
54/1
53/3
~ 81/19
EXISTIN
OD90L=140.
40/1
59
~ 40
81/22 165/4
Pk.
54/4 52/2
17/38
~
25
HDPE53
18/47 39/1
~
G STEEL
41/1 Pk.e6 165/2
255
EXISTIN
18/46
Cocnrete pipe Crossing 257
52/1
81/1
PN10
40/4 81/22
OD 80cm ~ 39/2 54/3
~ 81/18
13/16 20/13
Cocnrete pipe Crossing 36/21
~
PIPE
G DCI
40/3 ~ 0
OD 80cm PK5 OD 36/20
~ 41/2 ~ Pk.e5 81/21
PN1
6-P 280
DN500
54/6
PE
PIPE
100
K61 HD 260 52/3 81/21 HD
DN
(L=1PE
39/3
75
58
Aspha
pipe
PN1
DN800
40/5
~
Pk.
81/2 OD
78.0 36/23
lt
54/5 er
0 ~
ply