Project :-Himalayan Java 2023.02.

29
Address:- Baluwatar
Final Bill
S.N Description Unit Qty Rate Amount
1 Power Socket Point Wiring Point 6.00 1,750.00 10,500.00
2 Light Point Wiring Point 4.00 850.00 3,400.00
3 Track light 20W Pcs 10.00 2,000.00 20,000.00
4 Track Fream 2 M pcs 4.00 1,500.00 6,000.00
5 12W Panel Light Pcs 2.00 1,250.00 2,500.00
6 Buglet Light Pcs 2.00 2,100.00 4,200.00
7 Singhel Power Socket Pcs 3.00 1,000.00 3,000.00
8 Dubal Power Socket Pcs 3.00 2,100.00 6,300.00
9 Sp MCB 20A Pcs 5.00 750.00 3,750.00
10 AC Point Waring Point 2.00 2,850.00 5,700.00
11 Silin Rose Pcs 3.00 500.00 1,500.00
Total 66,850.00
Less:- Advance 50,000.00
Total Dues 16,850.00

Contact Person:- Niranjan Kumar Kushwaha


Cell No:- 9844255005,9802111523