Project: Development of the coastal international road, from 50 km to 90 km, a reverse rotation bridge.

Main contractor: ElSaeed contracting & real estate investment SCCD


Piles contractor: AL Rabat for Development, Investment and Tourism
Subject: Invoice No. (6)
Diameter
S.N Date Day Pile No. Type Platform Level Tip Level Pile Length Steel Weight
( cm )
1 4-Jan Wednesday P26 B11 120 6.2 -28.8 35.5 5225

2 5- Jan Thursday P23 B10 120 6.7 --28.3 35.5 7894


3 7- Jan Saturday P29 B12 120 6.7 -28.3 35.5 7894
4 8- Jan Sunday P39 B15 120 6.7 -28.3 35.5 7894
5 9- Jan Monday P37 B15 120 6.7 -28.3 35.5 7894
6 10- Jan Tuesday P36 B14 120 6.7 -28.3 35.5 7894
7 14- Jan Saturday P33 B13 120 6.3 -33.7 40.5 9095

8 15- Jan Sunday P31 B13 120 6.3 -33.7 40.5 9095
9 16- Jan Monday P38 B15 120 6.7 -28.3 35.5 7894
10 17- Jan Tuesday P34 P14 120 6.7 -28.3 35.5 7894
11 18- Jan Wednesday P32 B13 120 6.3 -33.7 40.5 9095
12 19- Jan Thursday P25 B11 120 6.2 -28.8 35.5 5225
13 P35 B14 120 6.7 -28.3 35.5 7894
14 26-Feb Sunday P22 B10 120 6.6 -28.4 35.5 7894
15 P19 B09 120 6.7 -28.3 35.5 7894
Monday
16 27-Feb P28 B10 120 6.7 35.5 7894
-28.3
17 28-Feb Tuesday L23 L03 100 7.76 -32.1 39 3943
18 L16 L03 100 7.8 -32.1 39 3943
Wednesday
19 1-Mar L21 L03 100 7.78 -32.1 39 3943
20 L22 L03 100 7.8 -32.1 39 3943
5-Mar Sunday
21 L19 L03 100 7.8 -32.1 39 3943
22 L17 L03 100 7.8 -32.1 39 3943
6- Mar Monday
23 L20 L03 100 7.8 -32.1 39 3943
24 7- Mar Tuesday R37 R05 120 7.63 -35.84 42 6030
25 11-Mar Saturday L18 L03 100 7.8 -32.1 39 3943
26 13-Mar Monday R30 R05 120 7.63 -35.84 42 6030
27 14-Mar Tuesday R33 R05 120 7.63 -35.84 42 6030
28 15-Mar Wednesday R31 R05 120 7.63 -35.84 42 6030
29 18-Mar Saturday R34 R05 120 7.63 -35.84 42 6030
30 19-Mar Sunday R32 R05 120 7.63 -35.84 42 6030
31 20-Mar Monday R35 R05 120 7.63 -35.84 42 6030
32 22-Mar Wednesday R36 R05 120 7.63 -35.84 42 6030

Total Length = 1231

Total Pile
Type Total Steel Weight
Length
Diameter (100) 312 31544

Diameter (120) 919 172809