You are on page 1of 3
SPECIAL DIAPHRAGM DIFFERENTIAL PRESSURE FLOW METER MODEL; ODM-300 & 300S Flow Meter Mounting Diagram ( Fig-A ) Front cover Pressure pipe Bolt nut NON toe detect io sau, » Sheet pecking Piping procedure 1) See Fig-A As shown, fasten the flow meter together with the packing between two flanges with bolts and nuts. Note: i) Piping may be in either direction of flow provided that the flow meter should be installed with the arrow on us body aligned to the direction, of flow. ii) The flow meter, model ODM 300 or 300S, has an interface of 80mm with two sheets of packing included (one sheet being 2mm thick). iii) A length of straight pipe should be provided before as well as after the flow meter (for 10 to 15D 3% D representing the inner diameter of the pipe). for flow meter 1) After completion of the piping work, run the system for a while with the stop valves (two) kept in a state of "shut" in order to flow off any foreign matters in the piping system. 2) With the equalizing valve kept in a state of “open”, open the stop valves (two) to the full. ‘After elapse of about 20 seconds, close the equalizing valve Measurement 1s now possible. Note: i) In the case of field indication, the normal may be entered immediately after the procedure of subparsgraph 2) ii) The procedure of subparagraph 2) is performed for the purpose of purging air in the pressure pipe and pressure receiving unit iii) Where the flow has a considerable amount of pulsating and it is difficult to read the indicating, reduce the stop valves appropriately for adjustment (It is possible to interfere the swing of pointer) ‘S.Adjustment of the contact position for jel_ provided with contact (O1 1) The contact is of internally adjustable type and can be set at any flow posit in within the range of scale. 2) Remove the front cover shown in Fig-A. Then, unfasten the screws at the comers for the inside, see Fig-B. Fig-B Flow indication pointer Set pointer Gruduated plete Contacts) + cenreri Switeh set nut Common contaect(C) Microswitch end holder Note; ‘) In setting the contacts, OFF the power before any work is made. ii) For the micro switch, the cireuit A or B should be used € Red - White = Circuit A, C Red - Black or Green = Circuit B DWG.No.CL-2530FLM/002 4. Mainter and_inspection 1) When the operation is stopped or otherwise the flow is suspended, see that the pointer indicates the zero point. 2) For the sake of safery, be sure to use the instrument within the specified pressure and temperature Note, i) The indicator pointer has a stopper provided within the indicator so that if it swing over the range of scale, there will be no problem. fi) The liquid pressure of the indicator, it must be 0.05Mpa(G)[0.Skg/em? (G)] 5 th 1) The cleaning is to be made with the stop valve opened, the equalizing valve opened (for about 5 minutes). Upon completion of the cleaning, close equalizing valve and the stop valve opened.

You might also like