SPECIAL DIAPHRAGM
DIFFERENTIAL PRESSURE FLOW METER
MODEL; ODM-300 & 300S
Flow Meter Mounting Diagram ( Fig-A )
Front cover
Pressure pipe
Bolt nut
NON toe detect io sau,
» Sheet pecking
Piping procedure
1) See Fig-A As shown, fasten the flow meter together with the packing between two flanges
with bolts and nuts.
Note: i) Piping may be in either direction of flow provided that the flow meter should
be installed with the arrow on us body aligned to the direction, of flow.
ii) The flow meter, model ODM 300 or 300S, has an interface of 80mm with two
sheets of packing included (one sheet being 2mm thick).
iii) A length of straight pipe should be provided before as well as after the flow
meter (for 10 to 15D 3% D representing the inner diameter of the pipe).for flow meter
1) After completion of the piping work, run the system for a while with the stop valves (two)
kept in a state of "shut" in order to flow off any foreign matters in the piping system.
2) With the equalizing valve kept in a state of “open”, open the stop valves (two) to the full.
‘After elapse of about 20 seconds, close the equalizing valve
Measurement 1s now possible.
Note: i) In the case of field indication, the normal may be entered immediately after
the procedure of subparsgraph 2)
ii) The procedure of subparagraph 2) is performed for the purpose of purging air
in the pressure pipe and pressure receiving unit
iii) Where the flow has a considerable amount of pulsating and it is difficult to
read the indicating, reduce the stop valves appropriately for adjustment
(It is possible to interfere the swing of pointer)
‘S.Adjustment of the contact position for jel_ provided with contact (O1
1) The contact is of internally adjustable type and can be set at any flow posit in within
the range of scale.
2) Remove the front cover shown in Fig-A. Then, unfasten the screws at the comers for the
inside, see Fig-B.
Fig-B
Flow indication pointer
Set pointer
Gruduated plete
Contacts) +
cenreri Switeh set nut
Common contaect(C)
Microswitch end holder
Note; ‘) In setting the contacts, OFF the power before any work is made.
ii) For the micro switch, the cireuit A or B should be used
€ Red - White = Circuit A, C Red - Black or Green = Circuit B
DWG.No.CL-2530FLM/0024. Mainter and_inspection
1) When the operation is stopped or otherwise the flow is suspended, see that the pointer
indicates the zero point.
2) For the sake of safery, be sure to use the instrument within the specified pressure and
temperature
Note, i) The indicator pointer has a stopper provided within the indicator so that if
it swing over the range of scale, there will be no problem.
fi) The liquid pressure of the indicator, it must be 0.05Mpa(G)[0.Skg/em? (G)]
5 th
1) The cleaning is to be made with the stop valve opened, the equalizing valve opened
(for about 5 minutes).
Upon completion of the cleaning, close equalizing valve and the stop valve opened.