Power Consumption for site PUNGRAIN SITE

50000 MT
A While Receiving and Feeding to Silo.
Sr. No. Motor / Sensor HP
1 Bag Filter 7
2 CC 1 20
3 EL 1 30
4 Bag Filter for Pre Cleaner 7
5 Drum Seive 0.75
6 Two Way Diverter 0.5
7 Pre Cleaner CL 1 and CL2 2
8 EL 2 40
9 Three Way Diverter 0.5
10 CC 2 / CC 3 30
11 Motorised Gate 0.5
Total HP 138.25
Total KW 103.69

B While Discharging from silo and Loading to Day Silo


Sr. No. Motor / Sensor HP
1 Sweep Auger 15.5
2 Motorised Gate 0.5
3 BC 1 / BC2 12.5
4 EL 2 40
5 Three Way Diverter 0.5
6 Drum Seive 0.75
7 Two Way Diverter 0.5
8 Pre Cleaner CL 1 and CL2 2
9 BC 3 5
10 EL 3 20
11 Three Way Diverter 0.5
Total HP 97.75
Total KW 73.31

C While Unloading Day Silo HP


1 Auto Weighing Machine 230 V
2 Slat Conveyor 1.5
3 Bag Stitching Machine 1
Total HP 2.5
Total KW 1.88

D Consumption of Aeration System. HP


1 For 1 Silo 64
2 For 2 Silo's Simultaneously 128
3 For 3 Silo's Simultaneously 192
4 For 4 Silo's Simultaneously 256