SAUDI FOREST

P R O J E C T : DISCOVER SAUDI FOREST


TECHNICAL DOCUMENTATION ENCLOSURES

• MATERIAL / SECURITY GUIDE LINES


• MATERIAL DESCRIPTION
• MEASUREMENT
• SPECIES
• GUIDE LINES EAZA >

• https://www.eaza.net/assets/Uploads/CCC/BPG-2022/2021-Crocodile-
Monitor-EAZA-Best-Practice-Guidelines-Approved.pdf
1a/ HORNBILL 28m2

Avairy Cages (sides)


- Outside decorated
- Roof green nature
- Interior (see picture)

Hornbills: aviary 6m high (otherwise they do not breed). Hollow tree


trunk nests on highest point
Keeper sas at the side with double door and feeding sas. No
backstage needed.
Soil: forest floor bark chips and natural trees inside.
• First height → +0,50m concrete wall.
• Second height → 2m glass/glass or Acrylic +2m.
• Third height → Zoo Mesh 5*5 (black) +3,50m.
(availability)
1b/ HORNBILL 28m2

• Concrete wall +1,00m Th. Level

( +1,00)

( +0,50)

( +0,00)

Vegetation and perching are a crucial part of any hornbill


enclosure. Perching should allow the birds to perch at a variety
of heights, while still leaving plenty of flight space in the
enclosure
Level Indication 2/ TOUCH POOL 25m²
see plan.

• Concrete spray wall


• Ground level inside the pool -0,00
• Filtration > See addendum

• Concrete wall +1,00m Th. Level


• Water Level: +0,70m
Water Filtration: 3/ CROCODILES 53m2
See Addendum

Waterfall 6,00m high:


- Concrete wall with stones.
- Waterproof background with pipes + Light on top.
(see lighting)

Keeper Gate on
bridge !

( +0,1,00)
Double Security wall:
- Side visitors → Wooden Fence (70cm) on top of
concrete wall (50cm)
- 1,00m green space (security).
- Side Animal → 5cm. Th. Acrylic separation

Wood bridge:
- Visit + Feeding
( +0,50) - Azobe wood. (Handrail min. 1,20cm.H) + under Acrylic
(security)
- U steel beams. (in beam – Led light)
Level Indication 4/ OTTER 74m2
see plan.

Spray concrete
Hydrofuge

Waterproof Separation Wall Otter / Croc.


- Concrete wall 15cm thick. + 20cm Height
- Acrylic wall > Height: 1,60cm.

Double Security wall:


- Side visitors → Wooden Fence (70cm) on top of concrete wall (50cm)
- 1,00m green space (security).
SAS ( +0,50) - Side Animal → 5cm. Th. Acrylic separation

SAS:
1,00 * 1,00 * 1,20m same materials as security wall.
5a/ TAMARIN 9m²
Level Indication 5b / SAKI 19m²
see plan. 5 c / MARMOSET 12m²

Waterproof Separation Wall Otter / Turtle

- Concrete wall 15cm thick. 20cm Height.


- Acrylic wall side otters 1,30m

Keep 2,50m safety distance of water around


the islands.

Description Island:

- Excavation of the concrete slab.


- Concrete Wall until level +0,50.
- Filling up with soil.
- Plantation trees and shrubs. (green)
Level Indication 6/ BRIDGE – Walk path
see plan.

Walk path / bridge


Proposal:

* illuminated with KALYPSO HYDRA HD10


* Azobe wood (Lophire alata)

Acrylic or Glass Wall connecting


under bridge:

- Separation between:
OTTER / MARMOSET

Height of acrylic wall needs to


be 1,20m above land level

0,50
7/ MEERKAT 41m²

Separation Meerkat / Tamarin island Level Indication


- Acrylic or Glass wall 3cm. Th. 1,20m.
- Concrete wall 15cm Th. / 1,20cm Height
see plan.
- Total wall Heights → 2,40m.

Tree Yucca / Cactus: excavate concrete slab


> To Check !

Lay Bricks on front + Concrete Roof :


- Lay bricks inside (tunnel) +1,10m / 80cm wide.

Front side on top of tunnel acrylic or glass 1,20*1,20m


- Lay bricks inside (tunnel) +1,10m / 80cm wide.
8/ FLAMINGO
Level Indication
see plan.

+0,00

Separation Flamingo / Visitors


- Decoration path “

+0,50
9/ SMALL CATS 51m²
Separation Small Cats / Visitors
- Concrete Wall > See plan.

+0,00 Wood covering against the Mesh net. Zoomesh


interwoven wire diameter 2.38mm mesh hole size
50x50mm (TI2450)
*Add 2 glass openings from 20cm 60cm long.
+0,50 * Glass window on concrete (see plan): 8,60 -
2,50cm.
* ZooMesh net. on top of glass frame

Closing Roof Top on 6,00m with zoomesh interwoven


wire diameter 2.38mm mesh hole size 50x50mm
(TI2450)

Wooden Door front for keepers 3m. H.


(window opening)
10/ PANTERS 158m²

Separation Panters / Visitors

SAS 3,00m High / Glass ( acrylic )


−0,50 Double magnetique door (1 door at a time)

- Front Glass window on concrete: 19,10m - 2,50cm.


- Front Mesh net. Upon glas frame
- zoomesh interwoven wire diameter 2.38mm mesh
hole size 50x50mm (TI2450)

+0,50

Closing Top on 6,00m with zoomesh interwoven wire


diameter 2.38mm mesh hole size 50x50mm (TI2450)
10/ LEMUR – ALDABRA - FLAMINGO 255m²

- 15 pieces Ringtail Lemur


- 5 pieces Aldabra Turtles
- 10 pieces Flamingos
+0,50
+0,50
Metal Fence 30cm height + add 1 on 90cm Height
10/ LEMUR – ALDABRA - FLAMINGO 255m²

Separation Lemur / Australian Outback


+0,50
- Concrete wall 15 Th. / +50cm H.
- Upon concrete wall – Fixing Metal
frame for the Aivery → zoomesh
interwoven wire diameter 2.38mm mesh
hole size 50x50mm (TI2450)

- 1,20m Acrylic panel fixing on height of


3m. (safety)

Separation Lemur / Australian Outback

- Close ceiling with → zoomesh


interwoven wire diameter 2.38mm mesh
hole size 50x50mm (TI2450)
10/ SAS

+0,50

SAS 3,00m High /


Glass ( acrylic )
Double magnetic door
(1 door at a time)
+0,50
+0,50

Suspension bridge

+1,00
11/ AUSTRALIAN OUTBACK 208m²

3.3 Wallaby
2.2 Eclectus
2.2 Ghala Cockatoo
60 Rainbow lorikeet

Australian Outback “AVIARY” !

- Concrete wall 15 Th. / 50cm H.


- Upon concrete wall – Fixing Metal
frame for the Aiviary → zoomesh
interwoven wire diameter 2.38mm mesh
hole size 50x50mm (TI2450)
- +Ceiling
12/ AUSTRALIAN OUTBACK 340m²
−0,50

Back stage

−0,50
13a/ ENTRANCE SECOND LEVEL

Entrance second level.


Suspension bridge.
(Reviewing Stability to
hang on metal beams)
13b/ ENTRANCE SECOND LEVEL

Entrance second level

Suspension on ceiling ?

SAS 3,00m Height / Metal frame


SAS with Zoomesh. Ceiling closing
with Zoomesh.

Double magnetic door (1 door at


a time)
13c/ ENTRANCE SECOND LEVEL

Stairs down: (review space)


Working with stairs platform or
round)
Depending possibility space !

• Exit 1 way direction ‘OUT’


• Downstairs needs a barier in
wood

Baobab on island: Concrete decoration


13d/ ENTRANCE SECOND LEVEL

Stair down:
• Exit 1 way direction ‘OUT’
• Down stairs need a bareer in
wood

PLatform: to build around the Baobab

Suspension bridge kids


ADDITIONAL QUESTIONS / ANWERS - INFORMATION

1. Existent cladding
- On the interior wall of the building > (left side of the building)
- Suggestion is to remove all existent cladding.
- New hydrofuge wall need to be add on places where there is water.

2. Steel beams
- Has to taking off > or fixed higher in the building ?
- See with ir. Stability if they can be removed.

3. Back door to the backstage


Need to be smaller (standard > 2 doors of 1m.)
Now > 6m.
Proposal > We add a wall in front and create a new opening of the 2 doors 1m.
Like this way we don’t damage the gate.
ADDITIONAL QUESTIONS / ANWERS - INFORMATION

4. All walls nearby the water >


Need to be waterproof and strong.
a. Proposal > Schluter- Kerdi Board. (reading construction manual) Part no waterfall
b. Concrete wall (8.90m high) Part Waterfall
c Need to be verified with engineer

5. Proposal for additional sun- Light.


* Vacalux Skytube. UV bulbs for animals and trees.

6. Thickness of concrete slab.


We will need to put out some parts to add trees and / or construction areas.

7. M³ water Filtration:
1. Croc:
2. Otters :
3. Turtles (big pond):
4. Touch Pool: 25m³
Filtration 4 x ( > study technical engineer)
ADDITIONAL QUESTIONS / ANWERS - INFORMATION

8. Backstages animals:
need to be constructed under the existent structure outside. ( see plan > ‘BACKSTAGE’)
+ Area for the Keepers.
+ Area for all Technical needs.

All spaces need to be approved by technical engineers.

9. Filtration:
There are 4 different Filtrations needed:
1. Crocodile (including waterfall)
2. Otter
3. Touch pool
4. Big pond.

All ponds need to be developed with deep suction and surface skimming. Water flow needs to
reach the whole pool to avoid dead angles with stagnant water.
Please check with your hydraulic engineer for proper placement of water inlets and outlets.
ADDITIONAL QUESTIONS / ANWERS - INFORMATION

10.Filtration needs to exist out of:

• Bio tower
• UV disinfection
• Ozone generator
• Protein skimmer
• Mechanical filtration (sand or glass) including drum filter
• Degassing tower.

Please verify with your hydraulic engineer the size of filters needed based on the volume of water.
Also see with your hydraulic engineer where to place the filtration as no area inside the house is
available due to lack of space.
Avoid chlorine as the water will have different species in and on the water and it can be potentially
dangerous for several species (particularly fish, reptiles and birds) including loss of life.
Visibility should be clear water as there is underwater viewing in different areas.
ADDITIONAL QUESTIONS / ANWERS - INFORMATION

a) Our team advises to contact a specialized filtration company in order not to make any mistakes.

b) All concrete slab in/ or around water need to be waterproof Hydrofuge

c) No use of polyurethane or other soft materials. (only concrete / hard material)

d) It is crucial to have engineering professionals check and assess technical aspects.


Engineers possess the expertise and knowledge required to evaluate and ensure the safety,
efficiency, and functionality of technical systems and processes.
Their expertise helps identify potential issues, mitigate risks, and optimize performance. Engaging
engineers in technical evaluations is a standard practice to maintain quality and reliability into this
project.

We trust the professionality of the engineering team of ‘SELA’ to follow up the project.
ADDITIONAL QUESTIONS / ANWERS - INFORMATION

11. Light intensity:


- The project needs 200 Lux.

12. Technical specifications:


- Temperature inside: 25 Celsius during the day
- 20 Celsius at night (if possible)
- Humidity:30-50% is ok (to avoid condense on the glass if too humid.
- Sprinklers activated at night to clean and water trees and to mimick tropical forest for the
animals. 2 x 30 minutes to start and then see if it is ok. Staff can adjust according to needs
ADDITIONAL QUESTIONS / ANWERS - INFORMATION

13. Ceiling of interior project:


- Placement of tension cables from opposite walls (front – back)
- Following the height of pipes.
- On tension cables we put on top “Zoomesh RA230” (Rope aviary) attaching on tension cables.

14. Cameras:
- Cameras need to be present in all angles to observe all animals / visitors

15. Structural engineer of bridge:


- Need to be calculated of possibility to hang the bridge on the roof (metal) structure.
- If not possible, metal round column needs to be placed.