NOTE:

CONTRACTOR SHALL PROVIDE ENGINEERING DETAIL.


INCLUDING DETAIL CALCULATION & ANALYSIS FROM UPDATED DETAIL DATA
FROM APPOINTED SUPPLIERS OR EQUIPMENT VENDOR OF CLIENT

STEEL PLATFORM FOR COAL BUNKER BY VENDOR

NOTE :

(SEE ARCHITECT DRAWING)


B01 = Utility Building B04 = Chili & Soy Building
B02 = Cordial & RTD Building B05 = Soy Extract
B03 = Warehouse B06 = Biomass Boiler
3D VIEW STRUCTURE
NTS B06
STEEL PLATFORM FOR COAL BUNKER BY VENDOR

N
written consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior

0 28.03.2019 RHI HEINZ Issued for Tender


Nr. Date Issued by Issued to Description

Designed By Drawn By Checked By Approved By


DAP NA SAI SAI
Client
PT. HEINZ ABC INDONESIA
Jalan Bendungan Walahar, Kec. Klari
Kabupaten Karawang, Jawa Barat 41371

Project Name Subject


INDONESIA FOOT PRINT BIOMASS BOILER
3D VIEW STRUCTURE
3D VIEW BOILER SHELL AND FURNACE
NTS
purpose other than for which it is supplied.

PT. Haskoning Indonesia


a company of :
Role S
Ventura Building, 2nd & 3rd Floor
Jl. R.A. Kartini #26 (Outer Ring Road) Stage Schematic Design
Cilandak - Jakarta 12430
Indonesia
T: +62 21 750 4605
Scale NTS Status Final
E: info@id.rhdhv.com
www.royalhaskoningdhv.com/en/indonesia Proj.Nr. TA1885 Suitability D2 P.Size A1

I&B
Drw.Nr. HEINZ-RHI-06-ZZ-DR-S-2001-9001
in

3/27/2019 2:07:10 PM
E:\Revit Local\2018\HEINZ-RHI-06-ZZ-M3-S-2000-2001_nur.arifinF6UF3.rvt
Steel Columns Schedule
Mark Size Remarks
SC1 WF500x200x10x16
SC2 WF300x150x6.5x9
SC3 WF200x200x8x12
SC4 WF150x75x5x7

Steel Beams Schedule


Mark Size Remarks
PR C150x65x20x3.2
SB1 HC 625x200x9x14 CASTELLATED FROM WF450x200x9x14
SB2 WF300x150x6.5x9
SB3 WF250x125x6x9
SB4 WF200x200x8x12
SB5 WF200x100x5.5x8
SB6 WF150x100x6x9
SB7 WF100x100x6x8
SB8 UNP200x80
SB9 L100x100x10
SB10 L75x75x7
SG
WB1, VB
WB2
850 1595
2445

E
6000

D
6000
24000

C
6000

NOTE:
B
- NO HEAVY EQUIPMENT AND PIPES MAY BE HANGED TO THE ROOF STRUCTURE
EXCEPT SMALL SPRINKLERS
- PURLINS OF STRUCTURE ARE NOT ALLOWED TO BE USED FOR ANY EQUIPMENTS
LOAD. ANOTHER STRUCTURES OF BUILDING MUST BE CONFIRMED BY ENGINEER OF HEINZ
6000

A
1595 850

NOTE :
2445

(SEE ARCHITECT DRAWING)


B01 = Utility Building B04 = Chili & Soy Building
B02 = Cordial & RTD Building B05 = Soy Extract
3000 3000 3000 3000 B03 = Warehouse B06 = Biomass Boiler

6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
B06
1000 66000 1000

1 2 3 4 5 6 7 8 9 10 11 12

STEEL ROOF LAYOUT


Scale 1 : 150 N
written consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior

0 28.03.2019 RHI HEINZ Issued for Tender


Nr. Date Issued by Issued to Description

Designed By Drawn By Checked By Approved By


DAP NA SAI SAI
Client
PT. HEINZ ABC INDONESIA
Jalan Bendungan Walahar, Kec. Klari
Kabupaten Karawang, Jawa Barat 41371

Project Name Subject


INDONESIA FOOT PRINT BIOMASS BOILER
STEEL ROOF LAYOUT
purpose other than for which it is supplied.

PT. Haskoning Indonesia


a company of :
Role S
Ventura Building, 2nd & 3rd Floor
Jl. R.A. Kartini #26 (Outer Ring Road) Stage Schematic Design
Cilandak - Jakarta 12430
Indonesia
T: +62 21 750 4605
Scale 1 : 150 Status Final
E: info@id.rhdhv.com
www.royalhaskoningdhv.com/en/indonesia Proj.Nr. TA1885 Suitability D2 P.Size A1

I&B
Drw.Nr. HEINZ-RHI-06-01-DR-S-2010-2101
in

3/27/2019 2:05:14 PM
E:\Revit Local\2018\HEINZ-RHI-06-ZZ-M3-S-2000-2001_nur.arifinF6UF3.rvt
Steel Columns Schedule
Mark Size Remarks
SC1 WF500x200x10x16
SC2 WF300x150x6.5x9
SC3 WF200x200x8x12
SC4 WF150x75x5x7

Steel Beams Schedule


Mark Size Remarks
PR C150x65x20x3.2
SB1 HC 625x200x9x14 CASTELLATED FROM WF450x200x9x14
SB2 WF300x150x6.5x9
SB3 WF250x125x6x9
SB4 WF200x200x8x12
SB5 WF200x100x5.5x8
SB6 WF150x100x6x9
SB7 WF100x100x6x8
SB8 UNP200x80
SB9 L100x100x10
SB10 L75x75x7
SG
WB1, VB
WB2

PR SG

PR SG
2445

E
6000

D
6000
24000

C
6000

B
6000

NOTE :

(SEE ARCHITECT DRAWING)


A B01 = Utility Building B04 = Chili & Soy Building
2446

B02 = Cordial & RTD Building B05 = Soy Extract


B03 = Warehouse B06 = Biomass Boiler

B06

6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000

1000 66000 1000

1 2 3 4 5 6 7 8 9 10 11 12

N
PURLIN LAYOUT
Scale 1 : 150
written consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior

0 28.03.2019 RHI HEINZ Issued for Tender


Nr. Date Issued by Issued to Description

Designed By Drawn By Checked By Approved By


DAP NA SAI SAI
Client
PT. HEINZ ABC INDONESIA
Jalan Bendungan Walahar, Kec. Klari
Kabupaten Karawang, Jawa Barat 41371

Project Name Subject


INDONESIA FOOT PRINT BIOMASS BOILER
PURLIN LAYOUT
purpose other than for which it is supplied.

PT. Haskoning Indonesia


a company of :
Role S
Ventura Building, 2nd & 3rd Floor
Jl. R.A. Kartini #26 (Outer Ring Road) Stage Schematic Design
Cilandak - Jakarta 12430
Indonesia
T: +62 21 750 4605
Scale 1 : 150 Status Final
E: info@id.rhdhv.com
www.royalhaskoningdhv.com/en/indonesia Proj.Nr. TA1885 Suitability D2 P.Size A1

I&B
Drw.Nr. HEINZ-RHI-06-01-DR-S-2010-2103
in

3/27/2019 2:05:21 PM
E:\Revit Local\2018\HEINZ-RHI-06-ZZ-M3-S-2000-2001_nur.arifinF6UF3.rvt
Steel Columns Schedule
Mark Size Remarks
SC1 WF500x200x10x16
SC2 WF300x150x6.5x9
E SC3 WF200x200x8x12
SC4 WF150x75x5x7

Steel Beams Schedule


Mark Size Remarks
D
PR C150x65x20x3.2

2590
SB1 HC 625x200x9x14 CASTELLATED FROM WF450x200x9x14
SB2 WF300x150x6.5x9
SB3 WF250x125x6x9
6000

910
SB4 WF200x200x8x12
SB5 WF200x100x5.5x8
2500

SB6 WF150x100x6x9
SB7 WF100x100x6x8
5000

C SB8 UNP200x80
2500

SB9 L100x100x10
SB10 L75x75x7
SG
6000

910

WB1, VB
WB2
2590

6000 6000 6000 6000 6000 6000 6000

18000 24000

1 2 3 4 5 6 7 8 9 10 11 12

STEEL JACK ROOF LAYOUT


Scale 1 : 150

NOTE :

(SEE ARCHITECT DRAWING)


B01 = Utility Building B04 = Chili & Soy Building
B02 = Cordial & RTD Building B05 = Soy Extract
B03 = Warehouse B06 = Biomass Boiler
D
2590

PR SG PR SG
B06
6000

910

2500
5000

C
2500
6000

910

N
2590

B
written consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior

0 28.03.2019 RHI HEINZ Issued for Tender


Nr. Date Issued by Issued to Description

Designed By Drawn By Checked By Approved By


A DAP NA SAI SAI
Client
PT. HEINZ ABC INDONESIA
Jalan Bendungan Walahar, Kec. Klari
6000 6000 6000 6000 6000 6000 6000 Kabupaten Karawang, Jawa Barat 41371
18000 24000
Project Name Subject
INDONESIA FOOT PRINT BIOMASS BOILER
STEEL JACK ROOF & PURLIN LAYOUT
1 2 3 4 5 6 7 8 9 10 11 12
purpose other than for which it is supplied.

PT. Haskoning Indonesia Role S


STEEL JACK PURLIN LAYOUT a company of :
Ventura Building, 2nd & 3rd Floor
Jl. R.A. Kartini #26 (Outer Ring Road) Stage Schematic Design
Cilandak - Jakarta 12430

Scale 1 : 150 Indonesia


T: +62 21 750 4605
E: info@id.rhdhv.com
Scale 1 : 150 Status Final
www.royalhaskoningdhv.com/en/indonesia Proj.Nr. TA1885 Suitability D2 P.Size A1

I&B
Drw.Nr. HEINZ-RHI-06-01-DR-S-2010-2104
in

3/27/2019 2:05:27 PM
E:\Revit Local\2018\HEINZ-RHI-06-ZZ-M3-S-2000-2001_nur.arifinF6UF3.rvt
Concrete Columns Schedule
Mark Size Remarks
C1 300x600
C2 250x400
C3 400x400
C4 200x200

Steel Columns Schedule


Mark Size Remarks
SC1 WF500x200x10x16
SC2 WF300x150x6.5x9
SC3 WF200x200x8x12
SC4 WF150x75x5x7

Baseplate Schedule
Mark Size Remarks
BP1
BP2

Steel Beams Schedule


Mark Size Remarks
PR C150x65x20x3.2
SB1 HC 625x200x9x14 CASTELLATED FROM WF450x200x9x14
SB2 WF300x150x6.5x9
E SB3 WF250x125x6x9
SB4 WF200x200x8x12
SB5 WF200x100x5.5x8
SB6 WF150x100x6x9
6000

SB7 WF100x100x6x8
SB8 UNP200x80
SB9 L100x100x10
SB10 L75x75x7

1970 1030 1400 477 1800 73 1430


SG
D

448
WB1, VB

125
1145 2025
WB2

248
6000

400
488
3975
1285

1057
24000

C
STEEL PLATFORM FOR COAL BUNKER BY VENDOR

4975

1877
6000

247
1400 478 1750
488 1025

400155
B

92
1285 570
NOTE:
EQUIPMENT ANCHORS & BASEPLATE SUPPLIED BY CONTRACTOR
5000

(INCLUDE FILLING CONCRETE OF BLOCK OUT/POCKET AND ANY GROUTING WORKS)

1000
6000

SEE EQUIPMENT DRAWINGS FROM SUPPLIER

STEEL PLATFORM FOR COAL BUNKER BY VENDOR

2630
1000

A
NOTE :

(SEE ARCHITECT DRAWING)


B01 = Utility Building B04 = Chili & Soy Building
545 670 1060 B02 = Cordial & RTD Building B05 = Soy Extract
2980 320 2390 310 2435 310 2280 430 900 2550 820 6451480 3875 B03 = Warehouse B06 = Biomass Boiler
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 1200 5447 5447

66000 12094
B06

1 2 3 4 5 6 7 8 9 10 11 12

N
BASE PLATE & COLUMN LAYOUT
Scale 1 : 150
written consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior

0 28.03.2019 RHI HEINZ Issued for Tender


Nr. Date Issued by Issued to Description

Designed By Drawn By Checked By Approved By


DAP NA SAI SAI
Client
PT. HEINZ ABC INDONESIA
Jalan Bendungan Walahar, Kec. Klari
Kabupaten Karawang, Jawa Barat 41371

Project Name Subject


INDONESIA FOOT PRINT BIOMASS BOILER
BASE PLATE & COLUMN LAYOUT
purpose other than for which it is supplied.

PT. Haskoning Indonesia


a company of :
Role S
Ventura Building, 2nd & 3rd Floor
Jl. R.A. Kartini #26 (Outer Ring Road) Stage Schematic Design
Cilandak - Jakarta 12430
Indonesia
T: +62 21 750 4605
Scale 1 : 150 Status Final
E: info@id.rhdhv.com
www.royalhaskoningdhv.com/en/indonesia Proj.Nr. TA1885 Suitability D2 P.Size A1

I&B
Drw.Nr. HEINZ-RHI-06-GF-DR-S-2010-2101
in

3/27/2019 2:05:33 PM
E:\Revit Local\2018\HEINZ-RHI-06-ZZ-M3-S-2000-2001_nur.arifinF6UF3.rvt
Concrete Slabs Ground Floor
Type Mark Thickness
S1 1000
S2 500
S3 200
S4 120
S5 100

Footings Schedule
Mark Size Remarks
F1 3000x1200x300

Concrete Pedestal
Mark Size Remarks
P1 500x500x100
P2 250x250x1200

GUTTER GUTTER S-2510_Concrete Insitu Walls


1000 2000
3000

Mark Thickness Remarks


+0,100 W1 250
E S1 W2 200
1000

2380
+0,100 +0,100
S2 S2
500 500

1838 462

2100 280
6000

2300
-0,200 -0,200

1611 1620
S5 S5

3620
200 100

130 2370
+0,100

2500

1782
2950 S2

1240
500
D

1380
+0,100
S2
500
+0,000
6000

+0,100 +0,100
S3 DILATATION S2 S1

4620
+0,000 200 500 1000
S3

984 1430
200
24000

1838 462
170

2100 280
C

1250

2300
1620
+0,100

2500

5000
S2
6000

500

3162
NOTE:

2620
+0,100
S2 +0,100 - CONTRACTOR SHALL CHECK AND COORDINATE
500 S2 EQUIPMENT POSITION SIZE AND REQUIREMENT WITH CLIENT
500
AND LATEST M&E, HVAC, EQUIPMENTS AND/OR OTHER RELATED DRAWING

1000
- CONTRACTOR SHALL DESIGN AND CHECK JOINT REQUIREMENTS ON FLOOR
B
300

1430 986
- EQUIPMENT ANCHORS & BASEPLATE SUPPLIED BY CONTRACTOR
DILATATION (INCLUDE FILLING CONCRETE OF BLOCK OUT/POCKET AND ANY GROUTING WORKS)
-0,200 -2,500
2830

SEE EQUIPMENT DRAWINGS FROM SUPPLIER


S5 S3
100 200
-0,200
6000

S5
100
2870

NOTE :

1000
A
2000 1000

(SEE ARCHITECT DRAWING)


3000

B01 = Utility Building B04 = Chili & Soy Building


B02 = Cordial & RTD Building B05 = Soy Extract
GUTTER GUTTER B03 = Warehouse B06 = Biomass Boiler

1160 200
660 5340 200 5800 6000 980 1535 3485 325 2950 2725 4000 2000 5000 1000 1800 3040 1000 1900 B06
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
1000 66000 1200 5447 5447

1 2 3 4 5 6 7 8 9 10 11 12

N
SLAB & BEAM LAYOUT
Scale 1 : 150
written consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior

0 28.03.2019 RHI HEINZ Issued for Tender


Nr. Date Issued by Issued to Description

Designed By Drawn By Checked By Approved By


DAP NA SAI SAI
Client
PT. HEINZ ABC INDONESIA
Jalan Bendungan Walahar, Kec. Klari
Kabupaten Karawang, Jawa Barat 41371

Project Name Subject


INDONESIA FOOT PRINT BIOMASS BOILER
SLAB & BEAM LAYOUT
purpose other than for which it is supplied.

PT. Haskoning Indonesia


a company of :
Role S
Ventura Building, 2nd & 3rd Floor
Jl. R.A. Kartini #26 (Outer Ring Road) Stage Schematic Design
Cilandak - Jakarta 12430
Indonesia
T: +62 21 750 4605
Scale 1 : 150 Status Final
E: info@id.rhdhv.com
www.royalhaskoningdhv.com/en/indonesia Proj.Nr. TA1885 Suitability D2 P.Size A1

I&B
Drw.Nr. HEINZ-RHI-06-GF-DR-S-2020-2101
in

3/27/2019 2:05:40 PM
E:\Revit Local\2018\HEINZ-RHI-06-ZZ-M3-S-2000-2001_nur.arifinF6UF3.rvt
10270

2700 5570 4301570

2980 2590

E
+3,000
S3
200

6000
Mark Size Remarks

1430
SC1 WF500x200x10x16
SC2 WF300x150x6.5x9
D

448
SC3 WF200x200x8x12

4600
2025

+3,000

477 2245
SC4 WF150x75x5x7
S3
200
6000

1988

+3,000

2043 488
S3 Steel Beams Schedule
3975

200

299 1285
STEEL PLATFORM FOR COAL BUNKER BY VENDOR
1988

142
Mark Size Remarks

1970 616
24000

PR C150x65x20x3.2
C SB1 HC 625x200x9x14 CASTELLATED FROM WF450x200x9x14

2269
+3,000
S3
2488

SB2 WF300x150x6.5x9
200
SB3 WF250x125x6x9
4975

SB4 WF200x200x8x12

1877
6000

SB5 WF200x100x5.5x8
2488

CONNECTION TO OTHER PIPE BRIDGE SB6 WF150x100x6x9

4600
+3,000 TO BE CHECKED ON SITE

616 1285 478 2152


SB7 WF100x100x6x8
S3
1025

200 SB8 UNP200x80


B

92
SB9 L100x100x10

2043 488
SB10 L75x75x7
NEW PIPE BRIDGE TO BE CONNECTED
TO EXISTING PIPE BRIDGE, SG
STEEL PLATFORM FOR COAL BUNKER BY VENDOR
5000

WB1, VB

142
DESIGN AND ELEVATION BY EPC CONTRACTOR
6000

WB2
1000

A
CHEQUERED PLATE
4.5mm THICK
EL. +5.000
310
796 2980 310 2280 430 400 1525 1075

4894 4396 2710 3000 3000 3000 3000 3000 3000 3000 3000
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 1200 5447 5447 1200

66000 13294

1 2 3 4 5 6 7 8 9 10 11 12

MEZZANINE LAYOUT 1 * TO BE CHECKED ON SITE

Scale 1 : 150
NOTE:
EQUIPMENT ANCHORS & BASEPLATE SUPPLIED BY CONTRACTOR
(INCLUDE FILLING CONCRETE OF BLOCK OUT/POCKET AND ANY GROUTING WORKS)
SEE EQUIPMENT DRAWINGS FROM SUPPLIER
OPENING POSITION, ANCHOR, AND EQUIPMENT POSITION SHALL BE COORDINATED
WITH CLIENT BY CONTRACTOR
E
STEEL PLATFORM FOR COAL BUNKER BY VENDOR

+7,580

4570
S3 NOTE :
6000

200

+7,500 (SEE ARCHITECT DRAWING)


S4 B01 = Utility Building B04 = Chili & Soy Building
120

1430
B02 = Cordial & RTD Building B05 = Soy Extract
D B03 = Warehouse B06 = Biomass Boiler

695
1725
2025

1125 1750
300

B06

7430
1028 1633
6000

257
3975

1400
1057

1030
24000

C
750 1641 1666 1669

1970
4975
6000

+7,580

2125
S3
200

970 1750
1058 275
1025

7400
155
B

1400
1285

1000
6000
written consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any

3657
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior

2630
0 28.03.2019 RHI HEINZ Issued for Tender
Nr. Date Issued by Issued to Description
STEEL PLATFORM FOR COAL BUNKER BY VENDOR
A Designed By Drawn By Checked By Approved By
DAP NA SAI SAI

1000 1804

2804
CHEQUERED PLATE Client
4.5mm THICK
PT. HEINZ ABC INDONESIA
EL. +9.637 Jalan Bendungan Walahar, Kec. Klari
310 230 900 1075 1480
Kabupaten Karawang, Jawa Barat 41371
802 2488 670 2550 805 645 1125 1475

2980 270 2440 3600 2480 8355 3875 3400 2600 Project Name Subject

6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 INDONESIA FOOT PRINT BIOMASS BOILER
MEZZANINE LAYOUT
66000
purpose other than for which it is supplied.

1 2 3 4 5 6 7 8 9 10 11 12 PT. Haskoning Indonesia


a company of :
Role S
Ventura Building, 2nd & 3rd Floor
Jl. R.A. Kartini #26 (Outer Ring Road) Stage Schematic Design
Cilandak - Jakarta 12430

MEZZANINE LAYOUT 2 Indonesia


T: +62 21 750 4605
E: info@id.rhdhv.com
www.royalhaskoningdhv.com/en/indonesia
Scale

Proj.Nr.
1 : 150
TA1885
Status

Suitability
Final
D2 P.Size A1

I&B
Scale 1 : 150 Drw.Nr. HEINZ-RHI-06-M1-DR-S-2010-2001
in

3/27/2019 2:05:48 PM
E:\Revit Local\2018\HEINZ-RHI-06-ZZ-M3-S-2000-2001_nur.arifinF6UF3.rvt
- Pile type : Precast Concrete Spun Pile
- Material : Concrete Grade K500
- Allowable pile load : 43 ton
- STOP 1 : Pile has not reached design depth: Pressing load is 2.5 x allowable load
- STOP 2 : Pile has reach design depth or more and pressing load is more 2.0 x allowable load.

- Pile Length : 20.2 M

CUT OF LENGTH
STRAIGHT

100 40 D
REBAR CUT OFF

BOTTOM OF
PILE CAP

PILE LENGTH
E
3000
6000

3000

1970 1030 1400 477 1800 73 1430


D

448
PILE TIP

125
975 2025
3000

248
6000

400
488
1285
3000

3000

1057
24000

C
3000

3000

1877
6000

1025 1975

247
3000

1400 478 1750


400155
B

92
1285 570
488
3000

1000
6000

3000

2630
A
NOTE :

(SEE ARCHITECT DRAWING)


B01 = Utility Building B04 = Chili & Soy Building
545 670 1060 B02 = Cordial & RTD Building B05 = Soy Extract
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 2980 320 2390 310 2435 310 2280 430 900 2550 820 6451480 3875 B03 = Warehouse B06 = Biomass Boiler
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000

66000 B06

1 2 3 4 5 6 7 8 9 10 11 12

N
PILE PLAN
Scale 1 : 150
written consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior

0 28.03.2019 RHI HEINZ Issued for Tender


Nr. Date Issued by Issued to Description

Designed By Drawn By Checked By Approved By


DAP NA SAI SAI
Client
PT. HEINZ ABC INDONESIA
Jalan Bendungan Walahar, Kec. Klari
Kabupaten Karawang, Jawa Barat 41371

Project Name Subject


INDONESIA FOOT PRINT BIOMASS BOILER
PILE PLAN
purpose other than for which it is supplied.

PT. Haskoning Indonesia


a company of :
Role S
Ventura Building, 2nd & 3rd Floor
Jl. R.A. Kartini #26 (Outer Ring Road) Stage Schematic Design
Cilandak - Jakarta 12430
Indonesia
T: +62 21 750 4605
Scale 1 : 150 Status Final
E: info@id.rhdhv.com
www.royalhaskoningdhv.com/en/indonesia Proj.Nr. TA1885 Suitability D2 P.Size A1

I&B
Drw.Nr. HEINZ-RHI-06-PL-DR-S-2005-2101
in

3/27/2019 2:05:53 PM
E:\Revit Local\2018\HEINZ-RHI-06-ZZ-M3-S-2000-2001_nur.arifinF6UF3.rvt
Concrete Pedestal
Mark Size Remarks
P1 500x500x100
P2 250x250x1200

E
3000
6000

3000

1970 1030 1400 477 1800 73 1430


D

448
125
975 2025
3000

248
6000

400
488

1285
3000

3000

1057
24000

C
3000

3000

1877
6000

6000
1025 1975

247
3000

1400 478 1750


400155
B

92
1285 570

488
3000

1000
6000

3000

2630
A NOTE :

(SEE ARCHITECT DRAWING)


B01 = Utility Building B04 = Chili & Soy Building
B02 = Cordial & RTD Building B05 = Soy Extract
B03 = Warehouse B06 = Biomass Boiler
545 670 1060
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 2980 320 2390 310 2435 310 2280 430 900 2550 820 6451480 3875
B06
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
66000

1 2 3 4 5 6 7 8 9 10 11 12

N
PILECAPS LAYOUT
Scale 1 : 150
written consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior

0 28.03.2019 RHI HEINZ Issued for Tender


Nr. Date Issued by Issued to Description

Designed By Drawn By Checked By Approved By


DAP NA SAI SAI
Client
PT. HEINZ ABC INDONESIA
Jalan Bendungan Walahar, Kec. Klari
Kabupaten Karawang, Jawa Barat 41371

Project Name Subject


INDONESIA FOOT PRINT BIOMASS BOILER
PILECAPS LAYOUT
purpose other than for which it is supplied.

PT. Haskoning Indonesia


a company of :
Role S
Ventura Building, 2nd & 3rd Floor
Jl. R.A. Kartini #26 (Outer Ring Road) Stage Schematic Design
Cilandak - Jakarta 12430
Indonesia
T: +62 21 750 4605
Scale 1 : 150 Status Final
E: info@id.rhdhv.com
www.royalhaskoningdhv.com/en/indonesia Proj.Nr. TA1885 Suitability D2 P.Size A1

I&B
Drw.Nr. HEINZ-RHI-06-PL-DR-S-2010-2102
in

3/27/2019 2:05:59 PM
E:\Revit Local\2018\HEINZ-RHI-06-ZZ-M3-S-2000-2001_nur.arifinF6UF3.rvt
Concrete Columns Schedule
Mark Size Remarks
C1 300x600
C2 250x400
C3 400x400
E D C B A E D C B A C4 200x200

850 24000 850 2445 24000 2445


Steel Columns Schedule
6000 6000 6000 6000 1595 850 6000 6000 6000 6000 850 1595
Mark Size Remarks
2590 910 2500 2500 910 2590 SC1 WF500x200x10x16
SC2 WF300x150x6.5x9
SC3 WF200x200x8x12
SC4 WF150x75x5x7
5
3x@1075 = 322

Steel Beams Schedule


0
0 2x@1450 = 290 Mark Size Remarks
7x@1200 = 840 0
550
550 7x@1200 = 840 PR C150x65x20x3.2
SB1 HC 625x200x9x14 CASTELLATED FROM WF450x200x9x14

262
480
SSL03 SSL03

2568 218
SB2 WF300x150x6.5x9
1518

+10950 +10950 SB3 WF250x125x6x9


SB4 WF200x200x8x12
3500

3500
100 1050

SB5 WF200x100x5.5x8
832

832
SB6 WF150x100x6x9
SSL02 SSL02

2490 100
SB7 WF100x100x6x8
+7450 +7450 SB8 UNP200x80
3500

SB9 L100x100x10
SB10 L75x75x7

1010
SSL01 SSL01 SG
7450

7450
WB1, VB
950

950
+3950 +3950
WB2
3000

3000
SSL00 SSL00
+0 +0

GRID LINE AT CL. 1 GRID LINE AT CL. 2, 3, 4, 5


Scale 1 : 150 Scale 1 : 150

E D C B A E D C B A

850 24000 850 2445 24000 2445


6000 6000 6000 6000 1596 850 6000 6000 6000 6000 850 1596
NOTE :
2590 910 2500 2500 910 2590 5000 1000

0
(SEE ARCHITECT DRAWING)
0 2x@1450 = 290 3x@1075 = 322
5
B01 = Utility Building B04 = Chili & Soy Building
550 7x@1200 = 840
B02 = Cordial & RTD Building B05 = Soy Extract
B03 = Warehouse B06 = Biomass Boiler

2039
B06
1052

1052
6589
780

780
4550

2718

2718

SSL03 SSL03
+10950 +10950 STEEL PLATFORM
FOR COAL BUNKER BY VENDOR
2568

2568
3500

832

932

SSL02 SSL02
N
2450 100

+7450 +7450
3500
10950
1050

SSL01 SSL01
7450

950

+3950 +3950
written consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior

3950
3000

0 28.03.2019 RHI HEINZ Issued for Tender


Nr. Date Issued by Issued to Description
SSL00 SSL00 Designed By Drawn By Checked By Approved By

+0 +0 DAP NA SAI SAI


Client
PT. HEINZ ABC INDONESIA
Jalan Bendungan Walahar, Kec. Klari
Kabupaten Karawang, Jawa Barat 41371

Project Name Subject

GRID LINE AT CL. 6 GRID LINE AT CL. 7 INDONESIA FOOT PRINT BIOMASS BOILER
STEEL FRAMES - SHEET 1

Scale 1 : 150 Scale 1 : 150


purpose other than for which it is supplied.

PT. Haskoning Indonesia


a company of :
Role S
Ventura Building, 2nd & 3rd Floor
Jl. R.A. Kartini #26 (Outer Ring Road) Stage Concept Design
Cilandak - Jakarta 12430
Indonesia
T: +62 21 750 4605
Scale 1 : 150 Status Final
E: info@id.rhdhv.com
www.royalhaskoningdhv.com/en/indonesia Proj.Nr. TA1885 Suitability D2 P.Size A1

I&B
Drw.Nr. HEINZ-RHI-06-ZZ-DR-S-2010-3101
in

3/27/2019 2:06:08 PM
E:\Revit Local\2018\HEINZ-RHI-06-ZZ-M3-S-2000-2001_nur.arifinF6UF3.rvt
Concrete Columns Schedule
Mark Size Remarks
C1 300x600
C2 250x400
C3 400x400
E D C B A E D C B A C4 200x200

2445 24000 2445 850 24000 850 Steel Columns Schedule


1596 850 6000 6000 6000 6000 850 1596 6000 6000 6000 6000
Mark Size Remarks
2590 910 2500 2500 910 2590 5000 1000 5000 1000 SC1 WF500x200x10x16
SC2 WF300x150x6.5x9
SC3 WF200x200x8x12
5
3x@1075 = 322 SC4 WF150x75x5x7
0
0 2x@1450= 290
550 7x@1200 = 840
0
550 7x@1200 = 840
Steel Beams Schedule
Mark Size Remarks
2039

PR C150x65x20x3.2
SB1 HC 625x200x9x14 CASTELLATED FROM WF450x200x9x14

780 525
SB2 WF300x150x6.5x9
1052

527
SB3 WF250x125x6x9
6589
780

SB4 WF200x200x8x12

4550
SB5 WF200x100x5.5x8
2718

2718
SB6 WF150x100x6x9
SB7 WF100x100x6x8
SSL03 SSL03 SB8 UNP200x80
1318

1318
+10950 +10950 SB9 L100x100x10
SB10 L75x75x7

3500
SG
2182

2182
WB1, VB
SSL02 SSL02 2304 WB2
+7450 +7450
2450

2450
10950

1000

1050
SSL01 SSL01

7450
50

+3950 +3950
1791
3950

3950
SSL00 SSL00
+0 +0

GRID LINE AT CL. 8, 9, 10, 11 GRID LINE AT CL. 12


Scale 1 : 150 Scale 1 : 150 * TO BE CHECKED ON SITE

1 2 3 4 5 6 7 8 9 10 11 12
NOTE :

1000 66000 13294 (SEE ARCHITECT DRAWING)


6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 1200 5447 5447 1200 B01 = Utility Building B04 = Chili & Soy Building
B02 = Cordial & RTD Building B05 = Soy Extract
5000 1000 1000 B03 = Warehouse B06 = Biomass Boiler
200

B06
798
3498

2700

CONNECTION TO OTHER PIPE BRIDGE


SSL03 TO BE CHECKED ON SITE
+10950
2568

NEW PIPE BRIDGE TO BE CONNECTED


3500

TO EXISTING PIPE BRIDGE,


DESIGN AND ELEVATION BY EPC
832

SSL02 CONTRACTOR
100

+7450 N
2490

1050
1010

SSL01
7450

950

+3950
written consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior

3000

0 28.03.2019 RHI HEINZ Issued for Tender


Nr. Date Issued by Issued to Description
SSL00
Designed By Drawn By Checked By Approved By
+0 DAP NA SAI SAI
Client
PT. HEINZ ABC INDONESIA
Jalan Bendungan Walahar, Kec. Klari
Kabupaten Karawang, Jawa Barat 41371

Project Name Subject


INDONESIA FOOT PRINT BIOMASS BOILER
GRID LINE AT CL. A, E STEEL FRAMES - SHEET 2

Scale 1 : 150
purpose other than for which it is supplied.

PT. Haskoning Indonesia


a company of :
Role S
Ventura Building, 2nd & 3rd Floor
Jl. R.A. Kartini #26 (Outer Ring Road) Stage Schematic Design
Cilandak - Jakarta 12430
Indonesia
T: +62 21 750 4605
Scale 1 : 150 Status Final
E: info@id.rhdhv.com
www.royalhaskoningdhv.com/en/indonesia Proj.Nr. TA1885 Suitability D2 P.Size A1

I&B
Drw.Nr. HEINZ-RHI-06-ZZ-DR-S-2010-3102
in

3/27/2019 2:06:17 PM
E:\Revit Local\2018\HEINZ-RHI-06-ZZ-M3-S-2000-2001_nur.arifinF6UF3.rvt
Concrete Columns Schedule
Mark Size Remarks
C1 300x600
1 2 3 4 5 6 7 8 9 10 11 12 C2 250x400
C3 400x400
1000 66000 1000 C4 200x200

6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000

5000 10001000 5000


Steel Columns Schedule
Mark Size Remarks
SC1 WF500x200x10x16
SC2 WF300x150x6.5x9
SC3 WF200x200x8x12
SC4 WF150x75x5x7
1325
4025

Steel Beams Schedule


2700

Mark Size Remarks


SSL03 PR C150x65x20x3.2
+10950 SB1 HC 625x200x9x14 CASTELLATED FROM WF450x200x9x14
2043

SB2 WF300x150x6.5x9
3500

SB3 WF250x125x6x9
1357

SB4 WF200x200x8x12
SSL02
SB5 WF200x100x5.5x8
100

+7450 SB6 WF150x100x6x9


SB7 WF100x100x6x8
3500

SB8 UNP200x80
SB9 L100x100x10
SSL01
7450

SB10 L75x75x7
950

+3950 SG
WB1, VB
3000

WB2

SSL00
+0
2500

GRID LINE AT CL. B ,D


Scale 1 : 150

1 2 3 4 5 6 7 8 9 10 11 12

1000 66000 1000

6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000

5000 1000

NOTE :

(SEE ARCHITECT DRAWING)


B01 = Utility Building B04 = Chili & Soy Building
B02 = Cordial & RTD Building B05 = Soy Extract
B03 = Warehouse B06 = Biomass Boiler

B06
1820
4520

480 2220

SSL03
1518

+10950
1882

SSL02
N
100

+7450
3500
10950

SSL01
written consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any

950

+3950
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior

0 28.03.2019 RHI HEINZ Issued for Tender


Nr. Date Issued by Issued to Description
3000

Designed By Drawn By Checked By Approved By

SSL00 DAP NA SAI SAI


Client
+0
PT. HEINZ ABC INDONESIA
Jalan Bendungan Walahar, Kec. Klari
Kabupaten Karawang, Jawa Barat 41371

Project Name Subject


INDONESIA FOOT PRINT BIOMASS BOILER
STEEL FRAMES - SHEET 3

GRID LINE AT CL. C


purpose other than for which it is supplied.

PT. Haskoning Indonesia


Scale 1 : 150 a company of :
Role S
Ventura Building, 2nd & 3rd Floor
Jl. R.A. Kartini #26 (Outer Ring Road) Stage Schematic Design
Cilandak - Jakarta 12430
Indonesia
T: +62 21 750 4605
Scale 1 : 150 Status Final
E: info@id.rhdhv.com
www.royalhaskoningdhv.com/en/indonesia Proj.Nr. TA1885 Suitability D2 P.Size A1

I&B
Drw.Nr. HEINZ-RHI-06-ZZ-DR-S-2010-3103
in

3/27/2019 2:06:24 PM
E:\Revit Local\2018\HEINZ-RHI-06-ZZ-M3-S-2000-2001_nur.arifinF6UF3.rvt

You might also like