C-Block-First Floor Power & Ups Layout 17-08-2018

You might also like

You are on page 1of 1

PDB1 PDB2 PDB2 PDB3

UDB1 UDB2

61430

X X1 X2 X3 X4 X5 X6 X7 X8 3000 X9 X10
6900 3000 6900 6900 6900 6900 6900 6900 6900
115 115

115

U1-R1,3NOS
Y13 A P1/Y2 A P1/B8 J
2
A E E D P3/R8 P3/R8
DA4
U1-B3 P3/B6

600
EQ EQ EQ EQ BHP 4 A

1970
A A 450
P2/R8

P2/B5
P1/Y2

P2/Y3

450
1675 2300 650 3950 2300 650 3950

P2/R4

P2/R4

P2/R3

P2/R3

P2/Y5

P2/Y5

P2/Y6

1200
300 E E E 400 450

450

1600
1600
U1-R2,3NOS U1-R2,3NOS

P2/R5

P2/R6
P2/B2

P2/B3

P2/B4
P2/Y4
P1/R9

BHP 4

BHP 4

BHP 4
P1/R11 P1/R10 H A VA

EQ
DU

1550

P2/Y6
A CATH WASH P3/B6 VA

BHP 4
GANTRY
ISO CENTER
P1/R2

Y
U1-Y2,3NOS

SINK
CATH
F A4 E
P1/Y10 A SPACE FOR A.H.U. J 200 200

3150
U1-R1,3NOS A P1/Y9 U1-B3 O2
E D WAITING G D D

150
A A P2/R8 A O2

TANK
HO
650
P1/B8
ISOLATION 02 A

2
P2/R8

2
D U1-B3
P2/Y8 A

750
P3/R7

600
2300
2300
A P1/Y9 J P3/R7 P3/B5

P2/Y2
7000

U1-Y1,3NOS
E U1-Y1,3NOS
E A
P1/Y8

BHP 4

BHP 4

BHP 4
ISOLATION 01 P1/B10 P1/B9 CATH LAB - 2 /

EQ

EQ
D
U1-B4
P1/Y1
1 TEMPORARY PRE-OP

P2/R7

P2/R7
P2/R7
M A (2-3 BEDS)

U1-R3

Y
U1-R3
U1-Y2,3NOS 300 300

P2/B6
E C.C.U. - 11 BEDS

U1-R3
A P1/B7 A 1100 1100
P1/Y10
X X

EQ
Y12a A A
BHP 4

650
NS NS NS A P3/Y7
2400
P1/R1 A

eq
2
D P2/Y8 B B B P3/B5 U1-B3

450
CHANGE

750
E
U1-R1,3NOS P1/B7 P2/R8 450 D 950

eq
A

SCRUB
2470

I.C.U. (19 - BEDS) P2/B7

U1-B1,3NOS

U1-B2,3NOS
U1-B1,3NOS
P2/Y2
P1/Y7

BHP 4

900
D H HAND P2. TOI A

U1-Y4

U1-Y4
U1-Y4

U1-Y4

U1-Y4
EQ H PANTRY PUBLIC H

P2/R1
450
DRYER

P2/R2
PATIENT

WS2

P2/Y1

P2/Y1
P2/B1
600 1200 600 EQ U1-B1,3NOS TOILET P2/R8 H D D D
E TOILET D
200 U1-B4
A 200

1200
P1/Y11 P1/Y11 NS H P1/Y11 B 2325 2300 600
600

750
NS NS BHP 4 BHP 4 BHP 4 CU 2xDATA OUTLET FOR LAN &

Y12 U1-B3 1xDATA OUTLET FOR INTERNET


D D E A

X
B B E A E P2/B6 D D
U1-B3
H
A P3/Y5

EQ EQ

200
PDB1 A A P3/Y6
CLEAN UTILITIES 1200 P2/Y7
D D
3000

STORAGE A P3/Y6
NURSE STATION U1-B4 1 D 2400 WIDE CORRIDOR 1 D 2400 WIDE CORRIDOR 2400 WIDE
CORRIDOR

U1-R3
450 M M EQUIPMENT
ROOM
2400 WIDE CORRIDOR 600
D P1/Y1 P3/Y8 A CONSOLE
H
Y11 B A D UPS INPUT UPS INPUT
U1-B3
600 D M FCU A P3/Y7 FCU M PANEL PANEL
X

NS U1-B3 NS B P2/B7 P3/Y8 A 2xDATA OUTLET FOR LAN &


UPS

EQ
LDB1 200 1xDATA OUTLET FOR INTERNET
ROOM
P1/Y11 H
NS P1/Y11 P1/Y11 P. TOILET 200 MGPS LV ELECTRICAL SERVICES SP2ACE HVAC U1-R3
D UPS
E D 200 D D 200 U1-R3 1
EQ EQ 600 1200 600

EQ

EQ EQ
A ROOM

NS
UDB1 P3/B7
BHP 4

BHP 4
P1/B1 H M

U1-Y3
U1-Y3

U1-Y3

U1-Y3
FHC A

U1-Y3
160 kVA
ELECTRICAL PANEL UPS

A P2/B7 M M 950
160 kVA

1000
450 450
UPS
P1/R7 D DU A D
PDB2 COUNSEL RM/ P3/Y5

750
B

EQ
U1-Y4,3NOS
E U1-B1,3NOS DR. RM NURSE STATION

900
D START OF
P1/R3 1875 ELECTRICAL POINTS
C U1-R4
A P3/R6

WS1
A

P1/B5
650

1000
P3/B7 H

EQ
P1/R6 U1-R3 A

EQ
450
STAIRCASE 1 P3/B2

200
A P1/R3 A LIFT
CATH LAB - 1

BHP 1

BHP 1
E E

1500

Y
7000

LIFT LOBBY

2300
BHP 4

BHP 4

BHP 4

BHP 4
P1/Y4 D J
2300

P1/B2 P1/R8 JANITOR EQ P3/B1

EQ
P1/Y3 U1-R3,3NOS LINEN EQ
U1-R4,3NOS A ANGIO P3/Y1
2300
U1-Y3,3NOS U1-B2,3NOS U1-B4 A
E E LOUNGE A

EQ
D U1-R4

200
D
1 P3/B2

1500

PDB-4
M

P2/B8
P2/B8
P1/R5 P1/B5 D P3/R6

BHP 1

BHP 1
F
P3/R1

1500
D A
600

600

1600
P1/R4 P1/R6 P1/B6 SPACE FOR A.H.U. P3/B1
P1/R5 D P3/R5 VA
A A A A G 200 A LDB-2 AVA E
900

950
E A P3/Y1
1600

1600

Y
A P2/Y7

UDB-2
U1-Y3,3NOS P1/Y6 A4
BHP 4

BHP 4

BHP 4

BHP 4
LIFT P3/Y2 GANTRY
ISO CENTER

1500
DUTY DOCTOR

650

1200
U1-R4 O2
1650

1650
P1/B3 P1/Y5 C

EQ
P1/B4

BHP 1

BHP 1
D P3/R2 O2
U1-R4,3NOS U1-R3,3NOS U1-B2,3NOS

WS2
E EQ EQ E E EQ EQ B STAFF P3/R2 1275 X X
P2/B8

600
550
P2/B8 TOILET
P1/R4 A P1/B6 A U1-B2 A P3/R5 A
P3/Y2 U1-R4
Y10
115

CONNECTING
CORRIDOR PDB1 PDB2 PDB2 PDB3
UDB1 UDB2 CONNECTING
CORRIDOR

LEGEND
R0 17-08-2018 POWER & UPS LAYOUT
01 SWITCH
REVISION ISSUED
DATE REVISIONS PURPOSE
02 1 NO. 6A SOCKET ONLY ON RAW POWER NO. TO

03 1 NO. 6A SWITCH SOCKET ON RAW POWER 1


Structural Consultant
04 2 NO. 6A SWITCH SOCKET ON RAW POWER 2

05 3 NO. 6A SWITCH SOCKET ON RAW POWER 3

06 1 NO. 6/16A SWITCH SOCKET ON RAW POWER

07 1 NO. 6A SWITCH SOCKET ON UPS 1

SANJAY ELECTRICALS
08 2 NO. 6A SWITCH SOCKET ON UPS 2

Sector-87, GreaterFaridabad-121002, HR.


09 3 NO. 6A SWITCH SOCKET ON UPS 3 E-mail : smsanjayelectrical@gmail.com
10 1 NO. 6/16A SWITCH SOCKET ON UPS POWER Architects
Helix Healthcare Architecture
MOUNTING HEIGHT OF WALL FIXTURES LEGEND NURSE STATION 11 1 NO. 6A RAW POWER FOR FCU FCU
16, Sadhna Enclave, Panchsheel Park ( South), New Delhi - 110017
2 NO. 6A SWITCH SOCKET ON UPS POWER T: +91-11-26011107 / 26011108 / 41402479
2 1NO. 6A SOCKET ONLY ON RAW FOR X-RAY
BED HEAD PANEL 1 - ANGIO LOUNGE 12 X Email : helix@hlx.co.in
01 CENTRE AT 300MM FROM FFL A 05 NS
1 NO. 6A SWITCH SOCKET ON RAW POWER 1
VIEW BOX
Web : www.hlx.co.in
1 NO. 6/16A SWITCH SOCKET ON RAW POWER 1NO. 6A SWITCH ONLY ON RAW FOR X-RAY
DATA OUTLET POINT D 13 X-RAY

02 CENTRE AT 600MM FROM FFL B 1 NO. 6A SWITCH SOCKET ON UPS FOR MONITOR @ 1800MM 1
VIEW BOX
A-Existing & Block 'C'(Proposed) -
COUNSEL RM/DR. RM 14 DATA OUTLET POINT D Block
BHP 1 BED HEAD LIGHT SWITCH
GROUND Floor Plan
03 CENTRE AT 900MM FROM FFL C 01 QUEUE MANAGEMENT I/O QM 15 TELEPHONE OUTLET POINT
DATA OUTLET POINT D
1NO. 6A SWITCH ONLY ON RAW FOR X-RAY VIEW BOX X-RAY
16 TV OUTLET
04 CENTRE AT 1200MM FROM FFL D NURSE CALL POINT 06 WS1 1 NO. 6A SWITCH SOCKET ON RAW POWER 1 17 AUDIO JACK
Project

1 NO. OXYGEN OUTLET O2 2 NO. 6A SWITCH SOCKET ON UPS POWER 2 18 CEILING FAN REGULATOR Sarvodaya Super Speciality Hospital and Research Centre
05 CENTRE AT 1350MM FROM FFL E
1 NO. VACUUM OUTLET VA DATA OUTLET POINT D At Site No. 1 Sector - 8 Faridabad, Haryana
19 NURSE CALL POINT

TELEPHONE OUTLET POINT 20 NURSE CALL INDICATOR


06 CENTRE AT 1500MM FROM FFL F BED HEAD PANEL 4 - ISOLATION 01,2 & I.C.U./C.C.U NI
Client
DUTY DOCTOR / WAITING 21 NURSE CALL SYSTEM NS
3 NO. 6/16A SWITCH SOCKET ON RAW POWER
07 CENTRE AT 1650MM FROM FFL G 1 NO. 6A SWITCH SOCKET ON RAW POWER 1 22 THERMOSTAT TS Anshu Hospital Ltd.
3 NO. 6A SWITCH SOCKET ON UPS FOR MONITOR @ 1800MM
SCETOR 8 FARIDABAD
3

07 WS2 2 NO. 6A SWITCH SOCKET ON UPS POWER 2


23 QUEUE MANAGEMENT I/O QM

08 CENTRE AT 1800MM FROM FFL H 03


BHP 4 BED HEAD LIGHT SWITCH
DATA OUTLET POINT D 24 WIFI 1 D
Architectural:
3 NO. DATA OUTLET POINT D
TELEPHONE OUTLET POINT 25 UPS DISTRIBUTION BOARD FOR AS BUILT DRAWING
09 CENTRE AT 2100MM FROM FFL J NURSE CALL POINT
26 POWER DISTRIBUTION BOARD Drawing Title:
1 NO. OXYGEN OUTLET O2
27 LIGHTING DISTRIBUTION BOARD
10 CENTRE AT 2400MM FROM FFL K
1 NO. VACUUM OUTLET VA 28 MANUAL CALL POINT MCP
Project Code Drawn By Checked By Approved By
11 CENTRE AT 3150MM FROM FFL L 1 NO. COMPRESSED AIR (A4) OUTLET A4 29 HOOTER H
HOOTER

30 OXYGEN OUTLET O2

12 ABOVE FALSE CEILING M 31 VACUUM OUTLET VA


Scale Drawing No. North Date
32 COMPRESSED AIR (A4) OUTLET A4

33 COMPRESSED AIR (A7) OUTLET 1:200 @ A1 17-02-2018


A7
EL-06
34 NITROUS OXIDE OUTLET

35 CARBON DIOXIDE OUTLET

You might also like