Professional Documents
Culture Documents
C-Block-First Floor Power & Ups Layout 17-08-2018
C-Block-First Floor Power & Ups Layout 17-08-2018
C-Block-First Floor Power & Ups Layout 17-08-2018
UDB1 UDB2
61430
X X1 X2 X3 X4 X5 X6 X7 X8 3000 X9 X10
6900 3000 6900 6900 6900 6900 6900 6900 6900
115 115
115
U1-R1,3NOS
Y13 A P1/Y2 A P1/B8 J
2
A E E D P3/R8 P3/R8
DA4
U1-B3 P3/B6
600
EQ EQ EQ EQ BHP 4 A
1970
A A 450
P2/R8
P2/B5
P1/Y2
P2/Y3
450
1675 2300 650 3950 2300 650 3950
P2/R4
P2/R4
P2/R3
P2/R3
P2/Y5
P2/Y5
P2/Y6
1200
300 E E E 400 450
450
1600
1600
U1-R2,3NOS U1-R2,3NOS
P2/R5
P2/R6
P2/B2
P2/B3
P2/B4
P2/Y4
P1/R9
BHP 4
BHP 4
BHP 4
P1/R11 P1/R10 H A VA
EQ
DU
1550
P2/Y6
A CATH WASH P3/B6 VA
BHP 4
GANTRY
ISO CENTER
P1/R2
Y
U1-Y2,3NOS
SINK
CATH
F A4 E
P1/Y10 A SPACE FOR A.H.U. J 200 200
3150
U1-R1,3NOS A P1/Y9 U1-B3 O2
E D WAITING G D D
150
A A P2/R8 A O2
TANK
HO
650
P1/B8
ISOLATION 02 A
2
P2/R8
2
D U1-B3
P2/Y8 A
750
P3/R7
600
2300
2300
A P1/Y9 J P3/R7 P3/B5
P2/Y2
7000
U1-Y1,3NOS
E U1-Y1,3NOS
E A
P1/Y8
BHP 4
BHP 4
BHP 4
ISOLATION 01 P1/B10 P1/B9 CATH LAB - 2 /
EQ
EQ
D
U1-B4
P1/Y1
1 TEMPORARY PRE-OP
P2/R7
P2/R7
P2/R7
M A (2-3 BEDS)
U1-R3
Y
U1-R3
U1-Y2,3NOS 300 300
P2/B6
E C.C.U. - 11 BEDS
U1-R3
A P1/B7 A 1100 1100
P1/Y10
X X
EQ
Y12a A A
BHP 4
650
NS NS NS A P3/Y7
2400
P1/R1 A
eq
2
D P2/Y8 B B B P3/B5 U1-B3
450
CHANGE
750
E
U1-R1,3NOS P1/B7 P2/R8 450 D 950
eq
A
SCRUB
2470
U1-B1,3NOS
U1-B2,3NOS
U1-B1,3NOS
P2/Y2
P1/Y7
BHP 4
900
D H HAND P2. TOI A
U1-Y4
U1-Y4
U1-Y4
U1-Y4
U1-Y4
EQ H PANTRY PUBLIC H
P2/R1
450
DRYER
P2/R2
PATIENT
WS2
P2/Y1
P2/Y1
P2/B1
600 1200 600 EQ U1-B1,3NOS TOILET P2/R8 H D D D
E TOILET D
200 U1-B4
A 200
1200
P1/Y11 P1/Y11 NS H P1/Y11 B 2325 2300 600
600
750
NS NS BHP 4 BHP 4 BHP 4 CU 2xDATA OUTLET FOR LAN &
X
B B E A E P2/B6 D D
U1-B3
H
A P3/Y5
EQ EQ
200
PDB1 A A P3/Y6
CLEAN UTILITIES 1200 P2/Y7
D D
3000
STORAGE A P3/Y6
NURSE STATION U1-B4 1 D 2400 WIDE CORRIDOR 1 D 2400 WIDE CORRIDOR 2400 WIDE
CORRIDOR
U1-R3
450 M M EQUIPMENT
ROOM
2400 WIDE CORRIDOR 600
D P1/Y1 P3/Y8 A CONSOLE
H
Y11 B A D UPS INPUT UPS INPUT
U1-B3
600 D M FCU A P3/Y7 FCU M PANEL PANEL
X
EQ
LDB1 200 1xDATA OUTLET FOR INTERNET
ROOM
P1/Y11 H
NS P1/Y11 P1/Y11 P. TOILET 200 MGPS LV ELECTRICAL SERVICES SP2ACE HVAC U1-R3
D UPS
E D 200 D D 200 U1-R3 1
EQ EQ 600 1200 600
EQ
EQ EQ
A ROOM
NS
UDB1 P3/B7
BHP 4
BHP 4
P1/B1 H M
U1-Y3
U1-Y3
U1-Y3
U1-Y3
FHC A
U1-Y3
160 kVA
ELECTRICAL PANEL UPS
A P2/B7 M M 950
160 kVA
1000
450 450
UPS
P1/R7 D DU A D
PDB2 COUNSEL RM/ P3/Y5
750
B
EQ
U1-Y4,3NOS
E U1-B1,3NOS DR. RM NURSE STATION
900
D START OF
P1/R3 1875 ELECTRICAL POINTS
C U1-R4
A P3/R6
WS1
A
P1/B5
650
1000
P3/B7 H
EQ
P1/R6 U1-R3 A
EQ
450
STAIRCASE 1 P3/B2
200
A P1/R3 A LIFT
CATH LAB - 1
BHP 1
BHP 1
E E
1500
Y
7000
LIFT LOBBY
2300
BHP 4
BHP 4
BHP 4
BHP 4
P1/Y4 D J
2300
EQ
P1/Y3 U1-R3,3NOS LINEN EQ
U1-R4,3NOS A ANGIO P3/Y1
2300
U1-Y3,3NOS U1-B2,3NOS U1-B4 A
E E LOUNGE A
EQ
D U1-R4
200
D
1 P3/B2
1500
PDB-4
M
P2/B8
P2/B8
P1/R5 P1/B5 D P3/R6
BHP 1
BHP 1
F
P3/R1
1500
D A
600
600
1600
P1/R4 P1/R6 P1/B6 SPACE FOR A.H.U. P3/B1
P1/R5 D P3/R5 VA
A A A A G 200 A LDB-2 AVA E
900
950
E A P3/Y1
1600
1600
Y
A P2/Y7
UDB-2
U1-Y3,3NOS P1/Y6 A4
BHP 4
BHP 4
BHP 4
BHP 4
LIFT P3/Y2 GANTRY
ISO CENTER
1500
DUTY DOCTOR
650
1200
U1-R4 O2
1650
1650
P1/B3 P1/Y5 C
EQ
P1/B4
BHP 1
BHP 1
D P3/R2 O2
U1-R4,3NOS U1-R3,3NOS U1-B2,3NOS
WS2
E EQ EQ E E EQ EQ B STAFF P3/R2 1275 X X
P2/B8
600
550
P2/B8 TOILET
P1/R4 A P1/B6 A U1-B2 A P3/R5 A
P3/Y2 U1-R4
Y10
115
CONNECTING
CORRIDOR PDB1 PDB2 PDB2 PDB3
UDB1 UDB2 CONNECTING
CORRIDOR
LEGEND
R0 17-08-2018 POWER & UPS LAYOUT
01 SWITCH
REVISION ISSUED
DATE REVISIONS PURPOSE
02 1 NO. 6A SOCKET ONLY ON RAW POWER NO. TO
SANJAY ELECTRICALS
08 2 NO. 6A SWITCH SOCKET ON UPS 2
02 CENTRE AT 600MM FROM FFL B 1 NO. 6A SWITCH SOCKET ON UPS FOR MONITOR @ 1800MM 1
VIEW BOX
A-Existing & Block 'C'(Proposed) -
COUNSEL RM/DR. RM 14 DATA OUTLET POINT D Block
BHP 1 BED HEAD LIGHT SWITCH
GROUND Floor Plan
03 CENTRE AT 900MM FROM FFL C 01 QUEUE MANAGEMENT I/O QM 15 TELEPHONE OUTLET POINT
DATA OUTLET POINT D
1NO. 6A SWITCH ONLY ON RAW FOR X-RAY VIEW BOX X-RAY
16 TV OUTLET
04 CENTRE AT 1200MM FROM FFL D NURSE CALL POINT 06 WS1 1 NO. 6A SWITCH SOCKET ON RAW POWER 1 17 AUDIO JACK
Project
1 NO. OXYGEN OUTLET O2 2 NO. 6A SWITCH SOCKET ON UPS POWER 2 18 CEILING FAN REGULATOR Sarvodaya Super Speciality Hospital and Research Centre
05 CENTRE AT 1350MM FROM FFL E
1 NO. VACUUM OUTLET VA DATA OUTLET POINT D At Site No. 1 Sector - 8 Faridabad, Haryana
19 NURSE CALL POINT
30 OXYGEN OUTLET O2