You are on page 1of 1

UP

TERRACE

UP
UP

DR.ROOM-2

WH

WH WAITING AREA
SECONDRY
ENTRANCE

UP
PHARMACY
DR.ROOM-1
ARGILA INDOOR
WH

PHARMACIST CASHIER WH
LAV

WC
TOILET LOBBY FILING

GARBAGE ROOM
PRAYER ROOM
TABIBI

STORAGE SHELVES DRUGS


WAITING AREA

BCP-PH WH BCP-TA
BCP-AR 4 X RH1 HD
WH
LAB
UR1 UR1 UR1 UR1
JANITOR
WH

JS
WH PREPARATION TABLE REFRIGERATOR F.TOILET Modification

HS1TPH1 For Approv.


TOILET For Approv.
LOBBY PTD PTD
TPH1 TPH1 TPH1
2 X RH1
F.H.C
M.TOILET LAV1 LAV1 LAV1 WC WC WC
HANDICAP LAV1
HS1 HS1 HS1
M.LOCKERS UP TOILET
FM SD1 SD1 SD1

PTD PTD
TPH1 TPH1 TPH1 FM SD1 SD1 SD1
HS1 HS1 HS1
LAV1 LAV1 LAV1 LAV1
WC WC WC
WC WC WC HD
LAV1 LAV1 LAV1
HS1 HS1 HS1

JANITOR PTD PTD TPH1 TPH1 TPH1

CORRIDOR UP
HS1
WC
HS1
WC
HS1
WC
LAV1 LAV1 LAV1

WH
M.TOILET
UP TPH1 TPH1 TPH1
PTD PTD F.LOCKERS
F.TOILET
4 X RH1 HD
CONTROL ROOM
UR1 UR1 UR1 UR1

WH
SERVICE
ENTRANCE
UP OPEN TO ABOVE STORAGE
CORRIDOR BILLING
UP
LAUNDRY
ENTRANCE
MDB
ARGILA OUTDOOR

TPE
VEG. & FRUIT ELEC. ROOM
BCP-CCP BCP-CCL

Caisse
Aurès
Aures
Aff.client
BCP-LSP
WH F.H.C
Contractor
LAUNDRY Date

CUSTOMER 21/10/2014
BAKERY SERVICE Contractor Architectural Civil Plumbing Electricity
Coordination 10/11/2014

UP
BCP-LU WH

MDB-CIB
UP ELEC.
CORRIDOR LOBBY ROOM

STAIR
BCP-PPG VAULT

CHEESE CHEESE

BCP-SM
STORAGE IT RACK
CONTROL C.S
UP DAIRY ROOM FILING
UDP-CO
COLD
MAIN ENTRANCE C.S C.S C.S C.S
UP SALAD MEAT IT ROOM

UP ATM
SALAD TELLERS ZONE
UDP-1 F.H.C CIB
FRESH 15 KVA PANTRY
SUNNY UPS
MEAT
WH
F.H.C F.H.C SAFETY
STAIR DEPOSIT WAITING AREA
UP
COLD FRESH
CHICKEN CHICKEN

ENTRANCE APPROACH
FROZEN

ATM POINT
BRANCH HEAD ROOM
Type of work : Issue date :
WEALTH MANAGER
Drawing Code.

RECEPTION DESK W-230B-Elec-2016


Drawing Title
Ground Floor Lighting SCALE:

Drawn by : ENG.: Mohamed Mostafa Checked by : ENG.:

Project Manager code of


approval
Revision
UP UP Name :
date of
APPROVAL approval
Signature :

UP
(A) Approved
(B)
Approved
(with notes) (C) To be re issued (D) Rejected