You are on page 1of 1

DN

UP
H06

DN
UP
H H

RAIN WATER DOWNTAKE PIPE (TYP)


8000

7.2M WIDE DRIVE WAY

DN
UP
RAIN WATER
DOWNTAKE PIPE

30000
H05
1000MM HIGH PARAPET WALL
54800

54300

DN
UP
G G
TRANSFORMERS BELOW

7.3M WIDE DRIVE WAY

26000
(DOUBLE HEIGHT)

SLOPE 1:10
SLOPE 1:300
8000

DN
UP
RAIN WATER
DOWNTAKE PIPE

H04

DN
UP
5000
F (TYP.) F
(TYP.)
2500

DN
UP
8000

RAIN WATER DOWNTAKE PIPE

RAIN WATER DOWNTAKE PIPE


7370 10570

31

1000
E E
H03
RIDGE STRUCTURAL PROOF CONSULTANT :

1000MM HIGH PARAPET WALL


42

7250
6500

6000

300 600

19 41
SLOPE 1:300

300MM WIDE SAUCER DRAIN


B REVISED AS PER CLIENT COMMENTS DATED
1490 2010 1180 600 03.07.21 AND SUBMITTED FOR APPROVAL TJR 12.07.2021 TJR 12.07.2021 JSR 13.07.2021 JA 13.07.2021
1000MM HIGH PARAPET WALL

PAP PAP JSR JA


D SD01 A SUBMITTED FOR APPROVAL D
H02 Drwn 08.04.2021 Chkd 21.04.2021 Aprd 21.04.2021
Dsgn 21.03.2021
650 300

890
FHC PHE REV.NO. DESCRIPTION DESIGNED DRAWN CHECKED APPROVED
REVISIONS
32 40
CLIENT :

STAIRCASE-02
UP
4650

300MM WIDE SAUCER DRAIN BIHAR MEDICAL SERVICES

LV01
3300
WD09
AND INFRASTRUCTURE
300

DN
CORPORATION LIMITED
1315

5970
ELV
DB ELEC
H01 DGM (D) :
MANAGER (P) :
LV01
1000MM HIGH PARAPET WALL 1000MM HIGH PARAPET WALL

1550 2250 3800 C


C
4650 8000 4350 7850 4350 6200 DGM (P) : GM (P & D) :
35400

35900

V01 V02 V02' V03 V03' V04 V05' V05 V06 V07
GM (P) : CGM (P) :
FIRST FLOOR PLAN
NO OF CARS = 42

BMSICL CONSULTANT : SIGNATURE


SURESH GOEL AND
ASSOCIATES, DELHI

EPC CONTRACTORS:
B B

LEGEND :
DOOR SCHEDULE - FIRST FLOOR FRL FINISHED ROAD LEVEL
PROJECT :
TAG
WD09
WIDTH
600
HEIGHT
1500 FGL FORMED GROUND LEVEL
REDEVELOPEMENT OF PATNA MEDICAL COLLEGE AND
SD01 750 2000
FFL FINISHED FLOOR LEVEL
HOSPITAL (PMCH) AT PATNA, BIHAR
FEA FIRE EQUIPMENT AREA
Job No: O21419 BUILDING NAME:
MLCP-01
TOC TOP OF CONCRETE
DRAWING TITLE:
LVL LEVEL FIRST FLOOR PLAN
A TOI. TOILET A
WINDOW / LOUVER SCHEDULE -FIRST FLOOR ELV EXTRA LOW VOLTAGE DRAWING NUMBER:
TAG WIDTH HEIGHT O21419-A-HP-08-WD-0002
LV01 1000 1000
SCALE: As indicated SHEET SIZE: A1 REVISION NO: B
RELEASED FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION

8 7 6 5 4 3 2 1