BARCHART AND S-CURVE

Contract ID : 20NI0074
Project Name :
Construction of Multi-Purpose Building, Brgy. Tagongon, Tagbina,
Surigao Del Sur
Location : Brgy. Tagongon, Tagbina, Surigao Del Sur
Contract Time : 148 CALENDAR DAYS
Date Started : October 18, 2022
Expiry Date : March 29, 2023

Construction of Multi-Purpose Building Brgy. Tagongon, Tagbina, Surigao Del Sur 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147### 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166

8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

ITEM NO. DESCRIPTION QUANTITY UNIT % WT. AMOUNT


SEPTEMBER 08-30, 2020 OCTOBER 01-31, 2020 NOVEMBER 01-30, 2020 DECEMBER 01-31, 2020 JANUARY 01-31, 2021 FEBUARY 01-20, 2020
1.1 100 %
B.3 Permits and Clearances 1.00 L.s 0.84% 31,850.00
1 . . . . .
1.1
B.5 Project Billboard/Sign Board 1.00 ea. 0.29% 11,167.00
1 . . . . .

B.7(2) Occupational Safety and Health Program 1.00 L.s 3.24% 123,500.00
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1
803(1)b Removal of Structure and Obstruction 1.00 L.s. 16.39% 624,000.00
2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 .
3.1
803(1)a Structure Excavation (Common Soil) 29.70 cu.m. 0.30% 11,583.00
. . . . . . . . . . . . . .
4.1
804(1)a Embankment from Structure Excavation 20.45 cu.m. 0.20% 7,668.75
4 . . . . . . .
6.1
804(4) Gravel Fill 43.50 cu.m. 1.73% 65,700.00
. . . . . . . .
7.1
900(1)c1 Structural Concrete, Class A, 28 days 58.23 cu.m. 11.22% 427,309.79
7 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8.1
902(1)a Reinforcing Steel (Deformed, Grade 40) 772.46 kgs 2.46% 93,799.81
8 . . . . . . . . . .
8.1
902(1)b Reinforcing Steel (Deformed, Grade 60) 2,314.45 kgs 7.24% 275,747.14
8 1 1 1 1 1 1 1 1 1 1 1 1 1
9.1
903(2) Formworks and Falseworks 41.48 sq.m 2.33% 88,783.37
9 1 1 1 1 1 1 1 1 1 1 1

1027(1) Cement Plaster Finish 119.30 sq.m 0.49% 18,665.67


. . . . . . . . . . .

1032(1)a Painting Works(Masonry/Concrete) 1,116.40 sq.m 2.49% 94,626.06


. . . . . . . . . .

1032(1)c Painting Works (Steel) 571.67 sq.m 3.69% 140,659.40


ORIGINAL . . . . . . . . . . .

1014(1)b1
Pre-painted Metal Sheets, Long Span, Corrugated Type, 0.4mm
481.63 sq.m 11.99% 456,647.85 S CURVE
thk 1 1 1 1 1 1 1 1 1 1 1

1013(2)a1 Fabricated Metal Roofing Accessory (Flashing - Gauge 26) 48.00 L.m. 1.04% 39,585.12
1 1 1 1 1 1 1 1 1 1 1

1013(2)b1 Fabricated Metal Roofing Accessory (Gutters - Gauge 24) 60.00 L.m. 1.76% 67,105.80
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
11.1
1047(8) Structural Steel (Roof Framing) 1.00 L.s 32.28% 1,229,010.39
11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Legend: TOTAL 100.00% 3,807,409.15 0.00%
Parrallel Activity Planned Monthly Cash Flow Accomplishment 386,310.26 715,908.77 675,458.54 1,107,838.63 836,308.98 85,583.97
Planned Cumulative Cash Flow Accomplishment 386,310.26 1,102,219.03 1,777,677.57 2,885,516.20 3,721,825.18 3,807,409.15
Critical Path Activity Planned Monthly Physical Accomplishment 10.15% 18.80% 17.74% 29.10% 21.97% 2.25%
Planned Cumulative Accomplishment 10.15% 28.95% 46.69% 75.79% 97.75% 100.00%

Prepared by: Implementing Agency: Checked by: Submmited: Recommending Approval: Approved:
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER MATEO T. FUDALAN ROSALIA E. PLAZA CANDELARIO P. PORTILLO NOEL R. OCLARIT
SVTS BUILDERS AND SUPPLY Surigao del Sur 2nd District Engineering Office
Mancarogo, Bislig City
Contractor Project Engineer III Chief, Construction Section Asst. District Engineer District Engineer
T
A BARCHART AND S-CURVE
N
D CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND
S- SEWERAGE/RAINWATER COLLECTOR SYSTEM AT PAMANLINAN EMENTARY SCHOOL,
C BISLIG CITY, SURIGAO DEL SUR
U
R
V CONTRACT ID: 23NI0061 CONTRACT DURATION: 142 CALENDAR DAYS DATE STARTED: JULY 07, 2023 EXPIRY DATE: NOVEMBER 25, 2023

E 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 #######################################################################################################################################################################################################################################################################################################################################################################################

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 ######################## 1 2 3 4 5 6 7 8 9 ################################################################## 1 2 3 4 5 6 7 8 9 ############################################################### 1 2 3 4 5 6 7 8 9 ################################################################## 1 2 3 4 5 6 7 8 9 ################################################

ITEM NO. DESCRIPTION QUANTITY UNIT % WT. AMOUNT


JULY 07-31, 2023 AUGUST 01-31, 2023 SEPTEMBER 01-30, 2023 OCTOBER 01-31, 2023 NOVEMBER 01-25, 2023
100 %

B.5 Project Billboard/Signboard 1.00 ea. 0.63% 2,196.00


1 . . . . . . . . . . . . . . . . . . . . . . . . .
90 %

803(1)A Structural Excavation (Common Soil) 9.24 cu.m 1.46% 5,072.76


1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1111111111111111111111111111

80 %
804(4) Gravel Fill 1.00 cu.m 0.79% 2,745.00
1 11111111111

1.1
900(1)c1 Structural Concrete, Class A, 28 days 1.00 cu.m 2.39% 8,286.85 70 %
1 111111111111111111111111111111111111111111

902(1)a Reinforcing Steel (Deformed, Grade 40) 59.23 kgs 2.61% 9,079.95
1111111111111111111
60 %
3.1
1003(1)a1 Ceiling (4.5mm Fiber Cement Board on Metal Frame) 19.20 sq.m 2.89% 10,031.42
. . . . . . . . . . . .

3.1 50 %
1001(1)a5 Pipes & Fittings (50mm dia. PVC Series 1000) 6.00 m 0.87% 3,035.58
. . . . . . . . . . . .

3.1
1001(1)a6 Pipes & Fittings (75mm dia. PVC Series 1000) 21.00 m 1.85% 6,411.51
. . . . . . . . . . . . 40 %

rve
-Cu
6.1
1002(3)a PVC Pipes (Blue) with Fittings (20mm dia.) 24.00 m 2.86% 9,926.88

lS
. . . . . . . . . . . .

na
30 %

igi
7.1

Or
1002(3)d PVC Pipes (Blue) with Fittings (40mm dia.) 3.00 m 0.49% 1,692.27
7 . . . . . . . . . . . .

8.1
1003(11)a1 Fascia Board (Fiber Cement Board,19mm) 16.00 m 7.80% 27,074.88 20 %
8 . . . . . . . . . . . .

9.1
1013(2)b1 Fabricated Metal Roofing Accessory (Gutters Gauge 24) 16.00 m 5.71% 19,817.92
9 . . . . . . . . . . . .
10 %
9.1
1032(1)a Painting Works (Masonry/Concrete) 19.20 sq.m 1.23% 4,276.60
9 . . . . . . . . . . . .

1201(8) Water Tank 3.00 set 68.43% 237,654.75 0%


1111111111111111111111111

Legend: TOTAL 100.00% 347,302.37


Total Amount 2,241,392.37

Parrallel Activity Planned Monthly Cash Flow Accomplishment 5014.20 4999.56 20445.78 6952.44 309890.39

Planned Cumulative Cash Flow Accomplishment 5,014.20 10,013.76 30,459.54 37,411.98 347,302.37

Critical Path Activity Planned Monthly Physical Accomplishment 1.44% 1.44% 5.887% 2.00% 89.23%

Planned Cumulative Accomplishment 1.44% 2.88% 8.770% 10.77% 100.00%

Prepared by: Implementing Agency: Checked by: Submitted by: Recommending Approval by: Approved by"
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
SVTS BUILDERS AND SUPPLY OFFICE OF THE DISTRICT ENGINEER
Surigao del Sur 2nd District Engineering Office
MARY GRACE C. TEJANO ROSALIA E. PLAZA JULIUS S. URIARTE NOEL R. OCLARIT
Mancarogo, Bislig City
Contractor Project Engineer I Chief, Construction Section OIC-Assistant District Engineer District Engineer
\
BARCHART AND S-CURVE
Contract ID : 20NI0062
Project Name :
Construction of Multi-Purpose Building, Brgy. Maglambing, Tagbina,
Surigao Del Sur
Location : Brgy. Maglambing, Tagbina, Surigao Del Sur
Contract Time : 166 CALENDAR DAYS
Date Started : September 8, 2020
Expiry Date : February 20, 2021

Construction of Multi-Purpose Building Brgy. Maglambing, Tagbina, Surigao Del Sur 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147### 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166

8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

ITEM NO. DESCRIPTION QUANTITY UNIT % WT. AMOUNT


SEPTEMBER 08-30, 2020 OCTOBER 01-31, 2020 NOVEMBER 01-30, 2020 DECEMBER 01-31, 2020 JANUARY 01-31, 2021 FEBUARY 01-20, 2020
1.1 100 %
B.3 Permits and Clearances 1.00 L.s 0.84% 31,850.00
1 . . . . .
1.1
B.5 Project Billboard/Sign Board 1.00 ea. 0.29% 11,167.00
1 . . . . .

B.7(2) Occupational Safety and Health Program 1.00 L.s 3.24% 123,500.00
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1
803(1)b Removal of Structure and Obstruction 1.00 L.s. 16.39% 624,000.00
2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 .
3.1
803(1)a Structure Excavation (Common Soil) 29.70 cu.m. 0.30% 11,583.00
. . . . . . . . . . . . . .
4.1
804(1)a Embankment from Structure Excavation 20.45 cu.m. 0.20% 7,668.75
4 . . . . . . .
6.1
804(4) Gravel Fill 43.50 cu.m. 1.73% 65,700.00
. . . . . . . .
7.1
900(1)c1 Structural Concrete, Class A, 28 days 58.23 cu.m. 11.22% 427,309.79
7 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8.1
902(1)a Reinforcing Steel (Deformed, Grade 40) 772.46 kgs 2.46% 93,799.81
8 . . . . . . . . . .
8.1
902(1)b Reinforcing Steel (Deformed, Grade 60) 2,314.45 kgs 7.24% 275,747.14
8 1 1 1 1 1 1 1 1 1 1 1 1 1
9.1
903(2) Formworks and Falseworks 41.48 sq.m 2.33% 88,783.37
9 1 1 1 1 1 1 1 1 1 1 1

1027(1) Cement Plaster Finish 119.30 sq.m 0.49% 18,665.67


. . . . . . . . . . .

1032(1)a Painting Works(Masonry/Concrete) 1,116.40 sq.m 2.49% 94,626.06


. . . . . . . . . .

1032(1)c Painting Works (Steel) 571.67 sq.m 3.69% 140,659.40


ORIGINAL . . . . . . . . . . .

1014(1)b1
Pre-painted Metal Sheets, Long Span, Corrugated Type, 0.4mm
481.63 sq.m 11.99% 456,647.85 S CURVE
thk 1 1 1 1 1 1 1 1 1 1 1

1013(2)a1 Fabricated Metal Roofing Accessory (Flashing - Gauge 26) 48.00 L.m. 1.04% 39,585.12
1 1 1 1 1 1 1 1 1 1 1

1013(2)b1 Fabricated Metal Roofing Accessory (Gutters - Gauge 24) 60.00 L.m. 1.76% 67,105.80
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
11.1
1047(8) Structural Steel (Roof Framing) 1.00 L.s 32.28% 1,229,010.39
11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Legend: TOTAL 100.00% 3,807,409.15 0.00%
Parrallel Activity Planned Monthly Cash Flow Accomplishment 386,310.26 715,908.77 675,458.54 1,107,838.63 836,308.98 85,583.97
Planned Cumulative Cash Flow Accomplishment 386,310.26 1,102,219.03 1,777,677.57 2,885,516.20 3,721,825.18 3,807,409.15
Critical Path Activity Planned Monthly Physical Accomplishment 10.15% 18.80% 17.74% 29.10% 21.97% 2.25%
Planned Cumulative Accomplishment 10.15% 28.95% 46.69% 75.79% 97.75% 100.00%

Prepared by: Implementing Agency: Checked by: Submmited: Recommending Approval: Approved:
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER MATEO T. FUDALAN ROSALIA E. PLAZA CANDELARIO P. PORTILLO NOEL R. OCLARIT
SVTS BUILDERS AND SUPPLY Surigao del Sur 2nd District Engineering Office
Mancarogo, Bislig City
Contractor Project Engineer III Chief, Construction Section Asst. District Engineer District Engineer
BARCHART AND S-CURVE
Contract ID : 20NI0030
Project Name : Package10
Construction of Multi-Purpose Building Brgy. Handamayan, Lingig, Surigao Del Sur

Construction of Multi-Purpose Building, Brgy. Mahayahay, Lingig, Surigao Del


Sur

Location : Lingig, Surigao Del Sur


Contract Time : 143 CALENDAR DAYS
Date Started : February 10, 2020
Expiry Date : July 1, 2020

Construction of Multi-Purpose Building Brgy. Handamayan, Lingig, Surigao Del Sur 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 147 149 24 25 26 27 28 29 30 31 32 33 34 35 36

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

ITEM NO. DESCRIPTION QUANTITY UNIT % WT. AMOUNT


FEBUARY 10-29, 2020 MARCH 1-31, 2020 APRIL 1-30, 2020 MAY 1-31, 2020 JUNE 1-30, 2020 JULY 01, 2020
1.1 100 %
B.3 Permits and Clearances 1.00 L.s 0.76% 18,300.00
1 1 1 1 1 1 1 1 1 1 1 1
1.1
B.5 Project Billboard/Sign Board 1.00 ea. 0.76% 18,300.00
1 . . . . . . . . . . . . 90 %

B.7(2) Occupational Safety and Health Program 1.00 L.s 1.27% 30,500.00
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1
803(1)b Structures Excavation (Soft Rock) 1.00 cu.m. 0.05% 1,189.50 80 %
2 1 1 1 1 1 1 1 1 .
3.1
803(1)a Structure Excavation (Common Soil) 69.04 cu.m. 3.23% 77,340.67
3 1 1 1 1 1 1 1 1 1 1 1 .
4.1
4
804(1)a Embankment from Structure Excavation 9.64 cu.m. 0.77% 18,346.84 ORIGINAL . . . . . . . . .
70 %

5.1
804(1)b Embankment from Common Borrow 110.18 cu.m. 8.02% 192,220.02
S CURVE
5 . . . . . . . . . . . . . . . .
6.1
804(4) Gravel Fill 35.01 cu.m. 2.55% 61,078.44 60 %
1 1 1 .###
7.1
900(1)c1 Structural Concrete, Class A, 28 days 52.51 cu.m. 14.38% 344,550.14
7 1 1 1 1 1
8.1
902(1)a1 Reinforcing Steel Deformed (Grade 40) 2,642.43 kgs 10.03% 240,434.70 50 %
8 1 1 1 1 1 1 1 1 1 1 1 1 1
9.1
903(2) Formworks and Falseworks 166.90 sq.m 5.83% 139,823.81
9 . . . .
10.1
1046(2)a1 CHB Non-Load Bearing (Including Reinforcing Steel), 100mm 133.18 sq.m 4.16% 99,690.55 40 %
10 1 1 1 1 1 1 1 1 1 1 1 1 1

1046(2)a2 CHB Non-Load Bearing (Including Reinforcing Steel), 150mm 105.96 sq.m 3.71% 88,960.83
1 1 1 1 1 1 1 1 1

1027(1) Cement Plaster Finish 193.55 sq.m 2.30% 55,105.62 30 %


. . . . . . . . . . . . .

1032(1)c Painting Wroks (Steel) 227.39 sq.m 1.92% 45,994.17


. . . . . . .
Pre-painted Metal Sheets, Long Span, Corrugated Type, 0.4mm
1014(1)b1 65.99 sq.m 4.03% 96,484.63 20 %
thk 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1014(1)b2 Pre-painted Metal Sheets, Long Span, Rib Type, 0.4mm thk 172.14 sq.m 10.92% 261,702.72
1 1 1 1 1 1 1 1 1 1

1013(2)a2 Fabricated Metal Roofing Accessory (Gauge 26 Flashing) 48.00 L.m. 2.25% 53,916.00
. . . 10 %

1013(2)b1 Fabricated Metal Roofing Accesory (Gauge 24-Gutters) 64.00 L.m. 3.03% 72,612.48
. . .
11.1 0%
1047(1) Structural Steel 1.00 L.s 20.04% 480,221.28
11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Legend: TOTAL 100.00% 2,396,772.40 0.00%
Parrallel Activity Planned Monthly Cash Flow Accomplishment 48,500.29 863,394.59 339,507.10 599,472.10 467,080.55 78,817.77
Planned Cumulative Cash Flow Accomplishment 48,500.29 911,894.88 1,251,401.98 1,850,874.08 2,317,954.63 2,396,772.40
Critical Path Activity Planned Monthly Physical Accomplishment 2.02% 36.02% 14.17% 25.01% 19.49% 3.29%
Planned Cumulative Accomplishment 2.02% 38.05% 52.21% 77.22% 96.71% 100.00%

Prepared by: Implementing Agency: Checked by: Submmited: Recommending Approval: Approved:

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER MARIA FARRAH F. MAQUILING ROSALIA E. PLAZA CANDELARIO P. PORTILLO NOEL R. OCLARIT
SVTS BUILDERS AND SUPPLY Surigao del Sur 2nd District Engineering Office
Mancarogo, Bislig City
Contractor Junior Project Engineer Chief, Construction Section Asst. District Engineer District Engineer
BARCHART AND S-CURVE
Contract ID : 20NI00062
Project Name : Construction of Shoreline Protection at Poblacion, Lingig, Surigao Del
Sur

Location : Poblacion, Lingig, Surigao Del Sur


Contract Time : 166 CALENDAR DAYS
Date Started : September 8, 2020
Expiry Date : Febuary 20, 2020
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171

############################################################1 2 3 4 5 6 7 8 9##################################################################1 2 3 4 5 6 7 8 9###############################################################1 2 3 4 5 6 7 8 9##################################################################1 2 3 4 5 6 7 8 9###############################################################1 2 3 4 5 6 7 8 9################################################


ITEM NO. DESCRIPTION QUANTITY UNIT % WT. AMOUNT
SEPTEMBER 08-30, 2020 OCTOBER 01-31, 2020 NOVEMBER 01-30, 2020 DECEMBER 01-31, 2020 JANUARY 01-31, 2020 FEBUARY 01-20, 2020

1.1
A.1.4(1) Provision of Progress Photographs 30.00 ea. 0.06% 19,240.80
1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1.1
Construction of Field Office for the
A.1.1(8) 9.53 mo. 0.91% 309,748.25
1
Engineer (Rental Basis) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

B.4(1) Construction Survey and Staking 0.63 km 0.11% 38,564.01


. . . . . . . . . . . . . . . . . . . .
ORIGINAL
S CURVE
2.1
B.5 Project Billboard/Signboard 1.00 ea. 0.01% 3,952.07
2 . . . . . . . . .

3.1
B.7(1) Occupation Safety and Health Program 9.53 mo. 0.46% 158,673.92
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4.1
B.9 Mobilizatino/Demobilization 1.00 L.s. 0.57% 195,014.65
4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

B.15(1) Detour/Access Road 1.00 L.s. 2.99% 1,021,653.20


. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6.1
101(1) Removal of Structure and Obstruction 1.00 L.s. 0.43% 145,522.57
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

7.1
508(1) Hand-Laid Rock Embankment 2,743.32 cu.m. 25.54% 8,727,186.75
7 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8.1
1702(1)a Structure Excavation (Common Soil) 7,166.91 cu.m. 6.06% 2,070,376.96
8 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9.1
1710(2)b Grouted Riprap Class "B" 2,603.20 19 29.33% 10,021,721.26
9 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10.1
1712(2) Concrete Slope Protection 1,368.17 cu.m. 33.54% 11,459,573.01
10 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Legend: TOTAL 100.00% 34,171,227.45 0.00%

Parrallel Activity Planned Monthly Cash Flow Accomplishment 280,369.78 380,520.43 1,529,861.10 4,946,301.76 11,841,386.40 13,440,325.60

Planned Cumulative Cash Flow Accomplishment 280,369.78 660,890.21 2,190,751.31 7,137,053.07 18,978,439.47 32,418,765.07

Critical Path Activity Planned Monthly Physical Accomplishment 0.82% 1.11% 4.48% 14.48% 34.65% 39.33%

Planned Cumulative Accomplishment 0.82% 1.93% 6.41% 20.89% 55.54% 94.87%

Prepared by: Implementing Agency: Checked by: Submmited by: Recommending Approval:
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER ROSALITO PASO ROSALIA E. PLAZA CANDELARIO P. PORTILLO
O.G. SANTOS CONSTRUCTION Surigao del Sur 2nd District Engineering Office
Mancarogo, Bislig City
Contractor Project Engineer III Chief, Construction Section Asst. District Engineer
172 173 174 175 176 177

##################

FEBUARY 01-20, 2020


100 %

. . . . . .
90 %

. . . . . .
80 %

70 %

60 %

. . . . . .

. . . . . . 50 %

. . . . . .
40 %

30 %

. . . . . .

20 %

. . . . . .

. . . . . . 10 %

0%
1 1 1 1 1 1

0.00%

13,440,325.60

32,418,765.07

39.33%

94.87%

Recommending Approval:

CANDELARIO P. PORTILLO
Asst. District Engineer
BARCHART AND S-CURVE
Contract ID : 20NI0003
Project Name : Construction/Rehabilitaion of Flood Mitigation along Bislig Bay, Cumawas, Bislig
City, Surigao Del Sur

Location : Cumawas, Bislig City, Surigao Del Sur


Contract Time : 216 CALENDAR DAYS
Date Started : February 10, 2020
Expiry Date : September 12, 2020

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 ### ### ### ### ### ### ### ### ###

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

ITEM NO. DESCRIPTION QUANTITY UNIT % WT. AMOUNT


FEBUARY 10-29, 2020 MARCH 1-31, 2020 APRIL 1-30, 2020 MAY 1-31, 2020

1.1
A.1.4(1) Provision of Progress Photographs 30.00 ea. 0.01% 1,280.10
1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1.1
B.4(1) Construction Survey and Staking 0.15 km 0.07% 6,400.00
1 . . . . . .

B.5 Project Billboard/Signboard 1.00 ea. 0.11% 9,599.18


. . . . . .

2.1
B.7
Occupational Safety and Health
Program
7.20 mo. 2.23% 192,000.02 ORIGINAL
2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
S CURVE
3.1
B.9 Mobilization/Demobilization 1.00 L.s 0.82% 70,400.00
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4.1
B.15 Detour/Access Road 1.00 L.s 2.23% 192,000.00
4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 .

404(1)a Reinforcing Steel, Grade 40 4,343.49 kgs. 3.25% 279,308.95

6.1
Structural Concrete, 20.68MPa, A, 28
405(1)a3 223.34 cu.m. 17.42% 1,497,986.04
days

7.1
508(1) Hand-Laid Rock Embankment 1,450.52 cu.m. 26.98% 2,320,832.00
7 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

8.1
1702(1)a Structure Excavation (Common Soil) 2,802.25 cu.m. 15.01% 1,291,276.80
8 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

9.1
1710(1)b Riprap Class "B" 362.45 cu.m. 7.77% 668,067.84
9

10.1
1710(2)b Grouted Riprap Class "B" 586.38 cu.m. 24.09% 2,071,563.26
10

Legend: TOTAL 100.00% 8,600,714.19

Parrallel Activity Planned Monthly Cash Flow Accomplishment 156,777.64 614,178.51 1,151,036.89 1,711,000.93

Planned Cumulative Cash Flow Accomplishment 156,777.64 770,956.15 1,921,993.05 3,632,993.98

Critical Path Activity Planned Monthly Physical Accomplishment 1.82% 7.14% 13.38% 19.89%

Planned Cumulative Accomplishment 1.82% 8.96% 22.35% 42.24%

Prepared by: Implementing Agency: Checked by: Submmited: Recommending Approval:


ROSALIA E. PLAZA
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
MARIA FARRAH F. MAQUILING
MARK ANTHONY CONSTRUCTION & SUPPLY Surigao del Sur 2nd District Engineering Office
Mancarogo, Bislig City
Contractor Junior Project Engineer Chief, Construction Section
### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###

28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12

MAY 1-31, 2020 JUNE 1-30, 2020 JULY 1-31, 2020 AUGUST 1-31, 2020 SEPT 1-12, 2020

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 .

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

0.00%

1,711,000.93 751,523.36 2,299,405.34 1,260,148.59 656,642.91

3,632,993.98 4,384,517.35 6,683,922.68 7,944,071.28 8,600,714.19

19.89% 8.74% 26.74% 14.65% 7.635%

42.24% 50.98% 77.71% 92.37% 100.000%

Recommending Approval: Recommending Approval:


CANDELARIO P. PORTILLO NOEL R. OCLARIT
Asst. District Engineer District Engineer
PDM

BARCHART AND S-
CURVE
Contract ID : 19NI0007
Project Name : Package 2
-Construction of Multi-Purpose Building Sitio Mabog, Brgy. San Roque,
Bislig City, Surigao Del Sur

Location : Bislig City, Surigao Del Sur


Contract Time : 95 CALENDAR DAYS
Date Started : June 10, 2019
Expiry Date : September 13, 2019

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13

ITEM NO. DESCRIPTION QUANTITY UNIT % WT. AMOUNT


JUNE 10-30, 2019 JULY 1-31, 2019 AUGUST 1-31, 2019 SEPTEMBER 1-13, 2019
100 %
1.1
B.3 Permits and Clearances 1.00 l.s 1.97% 36,600.00
1 . . . . .
90 %
1.1
B.5 Project Billboard/Sign board 1.00 l.s 1.31% 24,400.00
1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80 %

B.7(2) Occupational Safety and Health 1.00 l.s 1.64% 30,500.00


. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.1 Structure Excavation (Soft Rock, Manual
ORIGINAL 70 %

2
803(1)b
Excavation)
29.70 cu.m. 1.97% 36,686.92
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 S CURVE
60 %
3.1
804(1)a Embankment (from Structure Excavation) 20.45 cu.m. 2.17% 40,358.07
3 . . . . . . . . . . .
4.1 50 %
804(4) Gravel Fill 1.89 cu.m. 0.20% 3,735.40
4 1 1 1 1 1 1 . . . . . . . .
5.1 40 %
900(1)c1 Structural Concrete (Class A, 28 days) 15.09 cu.m. 6.61% 122,994.36
5 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 .
6.1
902(1)a Reinforcing Steel, Grade 40 2,704.08 kg 13.27% 246,990.66 30 %
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
7.1
1032(1)c Painting Works (Steel) 466.53 sq.m. 2.99% 55,559.05
7 . . . . . . . . . 20 %

8.1 1014(1)b Prepainted Metal Sheets (Corrugated), above


192.65 sq.m. 15.82% 294,388.46
8 1 0.427mm Long Span 1 1 1 1 1 1 1 1 1 110 %
9.1
1047(8) Structural Steel (Roof Framing) 1.00 L.s 52.06% 968,863.61
9 1 1 1 1 1 1 1 1 1 1 1 0%

Legend: TOTAL 100.00% 1,861,076.53


Parrallel Activity Planned Monthly Cash Flow Accomplishment 79,426.39 304,089.79 820,806.58 656,753.78
Planned Cumulative Cash Flow Accomplishment 79,426.39 383,516.18 1,204,322.75 1,861,076.53
Critical Path Activity Planned Monthly Physical Accomplishment 4.27% 16.34% 44.10% 35.29%
Planned Cumulative Accomplishment 4.27% 20.61% 64.71% 100.00%

Prepared by: Implementing Agency: Checked by: Submmited: Submmited: Recommending Approval:

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
SVTS BUILDERS AND SUPPLY Surigao del Sur 2nd District Engineering Office
Mancarogo, Bislig City
JEFFREY F. HISTORIA JULIUS S. URIARTE CANDELARIO P. PORTILLO NOEL R. OCLARIT
Contractor Junior Project Engineer Chief, Construction Section Asst. District Engineer District Engineer
PDM

BARCHART AND S-
CURVE
Contract ID : 19NI0019
Project Name : Package 5
-Construction of Multi-Purpose Building Brgy. Tagongon, Tagbina, Surigao Del Sur
Location : Barobo, Surigao Del Sur
Contract Time : 150 CALENDAR DAYS
Date Started : June 10, 2019
Expiry Date : November 7, 2019
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 22 23 24 25 26 27 28

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7

ITEM NO. DESCRIPTION QUANTITY UNIT % WT. AMOUNT


JUNE 10-30, 2019 JULY 1-31, 2019 AUGUST 1-31, 2019 SEPTEMBER 1-30, 2019 OCTOBER 1-31, 2019 NOVEMBER 1-7, 2019
100 %
1.1
B.3 Permits and Clearance 1.00 l.s 1.30% 48,800.00
1 . . . . .
90 %
1.1
B.5 Project Billboard/Signboard 1.00 l.s 0.65% 24,400.00
1 . . . . .
80 %
2.1
B.7(2) Occupational Safety and Health 1.00 l.s 1.62% 61,000.00
2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.1 70 %
803(1)b Structure Excavation (Common Soil) 44.55 cu.m. 1.46% 55,030.38
3 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
4.1
804(1)a Embankment(From Structure Excavation) 30.67 cu.m. 1.61% 60,616.18
4 . . . . . . . . 60 %

5.1 ORIGINAL
5
804(4) Gravel Fill 2.70 cu.m. 0.14% 5,336.28
1 1 1 1 1 1 1 1 1 1 1 1 . . S CURVE . .
50 %
6.1
900(1)c1 Structural Concrete (Class A, 28days) 23.10 cu.m. 4.96% 186,423.93
6 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7.1
902(1)a1 Reinforcing Steel, Grade 40 7,871.47 kg 22.21% 835,556.54 40 %
7 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8.1
1027(1) Plain Cement Plaster Finish 75.60 sq.m. 0.31% 11,809.47
8 . . . . . . . . . . . . . . . . . . . 30 %

9.1
1032(1)c Painting Works(Steel) 779.15 sq.m. 2.72% 102,458.22
9 . . . . . . . . . . . . . .
20 %
10.1 Prepainted Metal Sheets (Corrugated),
1014(1)b1 602.04 sq.m. 23.84% 896,810.82
10 above 0.427mm Long Span 1 1 1 1 1 1 1 1 1 1 1
11.1 Fabricated Metal Roofing Accessory
1013(2)a2 48.00 l.m 2.34% 88,137.12 10 %
11 (Flashing, Gauge 26) 1 1 1 1 1 1 1 1 1 1 1
11.1
1047(1) Structural Steel 1.00 L.s. 36.83% 1,385,624.39 0%
11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Legend: TOTAL 100.00% 3,762,003.33 ############### ############### ###############


Parrallel Activity Planned Monthly Cash Flow Accomplishment 158,440.92 351,760.54 471,171.54 885,944.32 1,835,752.09 58,933.92

Planned Cumulative Cash Flow Accomplishment 158,440.92 510,201.46 981,373.00 1,867,317.32 3,703,069.41 3,762,003.33
Critical Path Activity Planned Monthly Physical Accomplishment 4.21% 9.35% 12.52% 23.55% 48.80% 1.57%
Planned Cumulative Accomplishment 4.21% 13.56% 26.09% 49.64% 98.43% 100.00%

Prepared by: Implementing Agency: Checked by: Submmited: Recommending Approval: Approved:

Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
Surigao del Sur 2nd District Engineering Office
SVTS BUILDERS AND SUPPLY Mancarogo, Bislig City JEFFREY F. HISTORIA JULIUS S. URIARTE CANDELARIO P. PORTILLO NOEL R. OCLARIT
Contractor Junior Project Engineer Chief, Construction Section Asst. District Engineer District Engineer
MONTHLY GRAPHICAL ACCOMPLISHMENT REPORT
As of #REF!

Project Title : #REF! Legend: - Programmed


Limits :
Location : Barobo, Surigao Del Sur - This Month
Contractor :
Percent
Accomplis
Percent Amount Program Qty Programmed PERCENTAGE PROGRAMED age
Item No. Description hment to
Program Actual Expenditures CABACUNGAN WAKAT RIZAL GUINHALINAN Unit 10 20 30 40 50 60 70 80 90 100 Accompl
Date(%)
P-
Project Billboard/Sign Board Err:504 - ea Err:504 ished
B.3 Permits and Clearances #VALUE! ea #VALUE! #VALUE!
A- #VALUE! Err:504 - - Err:504
Occupational
P- Safety and Health Err:504 - ea 5,217.36 Err:504
B.5 Project Billboard/Sign Board #VALUE! ea #VALUE! #VALUE!
A- #VALUE! Err:504 - - - Err:504
P- Painting Steel Err:504 - L.s. Err:504
B.7(2) Occupational Safety and Health #VALUE! L.s. #VALUE! #VALUE!
A- #VALUE! Err:504 - - Err:504
Prepainted Metal Sheet
P- (Corrugated), above 0.427Err:504
mm Long Span - cu.m. 231.17 Err:504
801(1) Removal of Structure and Obstruction #VALUE! L.s. #VALUE! #VALUE!
A- #VALUE! Err:504 - - - Err:504
Fabricated Metal
P- Roofing Accesory (Gauge 26-RIdge
Err:504Roll) - cu.m. 513.80 Err:504
803)1)b Structure Excavation #VALUE! cu.m. #VALUE! #VALUE!
A- #VALUE! Err:504 - - - Err:504
Fabricated Metal
P- Roofing Accesory (Gutters, 0.60 mm thk)
Err:504 - cu.m. 2,333.80 Err:504
804(1)a Embankment ( From Structure Excavation) #VALUE! cu.m. #VALUE! #VALUE!
A- #VALUE! Err:504 - - - Err:504
P- - 1,600.87 1,600.87
900(1)c1 Structural Concrete ( Class ''A'', 28 days) #VALUE! sq.m. #DIV/0! #DIV/0!
A- - - -
P- #N/A #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
A- #N/A - -
P- Structural Steel Err:504 - sq.m. 10,761.64 Err:504
804(1)b Embankment ( From Borrow) #VALUE! cu.m. #VALUE! #VALUE!
A- #VALUE! Err:504 - - - Err:504
P- - Err:504 - kgs 114.37 Err:504
804(4) Gravel Fill #VALUE! cu.m. Err:504 Err:504
A- Err:504 Err:504 - - - Err:504

P- #VALUE! Err:504
T O T A L #VALUE!
A #VALUE!

Prepared by: Noted:

MATEO T. FUDALAN JULIUS S. URIARTE


Engineer II Chief Construction Section
Project Engineer III
MONTHLY GRAPHICAL ACCOMPLISHMENT REPORT
As of February 13, 2017

Project Title : Construction of Multi-Purpose Building Wakat,Barobo,SDS (Phase II ) Legend: - Programmed


Limits :
Location : Barobo, Surigao Del Sur - This Month
Contractor :
Percent
Accomplis
Percent Amount Program Qty Programmed PERCENTAGE PROGRAMED age
Item No. Description hment to
Program Actual Expenditures This Month Unit 10 20 30 40 50 60 70 80 90 100 Accompl
Date(%)
Permits and Clearances P- B.3 - ished
B.3 #VALUE! L.s. #VALUE! #VALUE!
A- #VALUE!
Project Billboard/Sign Board P- B.5 -
B.5 #VALUE! cu.m. #VALUE! #VALUE!
A- #VALUE!
Occupational Safety and Health P- B.7(2) -
B.7(2) #VALUE! cu.m. #VALUE! #VALUE!
A- #VALUE!
Removal of Structure and Obstruction P- 803(1)b -
801(1) #VALUE! kg #VALUE! #VALUE!
A- #VALUE!
Structure Excavation P- 804(1)a -
803)1)b #VALUE! sq.m. #VALUE! #VALUE!
A- #VALUE!
Embankment ( From Structure Excavation) P- 804(4) -
804(1)a #VALUE! sq.m #VALUE! #VALUE!
A- #VALUE!
Embankment ( From Borrow) P- 900(1)c1 -
804(1)b #VALUE! L.s. #VALUE! #VALUE!
A- #VALUE!
Gravel Fill P- 902(1)a1 -
804(4) #VALUE! L.s. #VALUE! #VALUE!
A- #VALUE!
106,650.01
P- #VALUE! #VALUE!
T O T A L #VALUE!
A #VALUE!

Prepared by: Noted:

MATEO T. FUDALAN JULIUS S. URIARTE


Engineer II Chief Construction Section
Project Engineer II
MONTHLY GRAPHICAL ACCOMPLISHMENT REPORT
As of February 13, 2017

Project Title : Construction of Multi-Purpose Building Rizal,Barobo,SDS (Phase II ) Legend: - Programmed


Limits :
Location : Barobo, Surigao Del Sur - This Month
Contractor :
Percent
Accomplis
Percent Amount Program Qty Programmed PERCENTAGE PROGRAMED age
Item No. Description hment to
Program Actual Expenditures This Month Unit 10 20 30 40 50 60 70 80 90 100 Accompl
Date(%)
Permits and Clearances P- 1.00 ea ished
B.3 0.021 L.s. #VALUE! #VALUE!
A- #VALUE!
Project Billboard/Sign Board P- 1.00 ea
B.5 0.021 cu.m. #VALUE! #VALUE!
A- #VALUE!
Occupational Safety and Health P- 1.00 L.s.
B.7(2) 0.021 cu.m. #VALUE! #VALUE!
A- #VALUE!
Removal of Structure and Obstruction P- 52.09 cu.m.
801(1) 1.114 kg #VALUE! #VALUE!
A- #VALUE!
Structure Excavation P- 32.91 cu.m.
803)1)b 0.704 sq.m. #VALUE! #VALUE!
A- #VALUE!
Embankment ( From Structure Excavation) P- 4.30 cu.m.
804(1)a 0.092 sq.m #VALUE! #VALUE!
A- #VALUE!
Embankment ( From Borrow) P- 27.09 sq.m.
804(1)b 0.579 L.s. #VALUE! #VALUE!
A- #VALUE!
Gravel Fill P- 4,557.05 kgs
804(4) 97.447 L.s. #VALUE! #VALUE!
A- #VALUE!
106,650.01
P- 4,676.44 #VALUE!
T O T A L 100.00
A #VALUE!

Prepared by: Noted:

MATEO T. FUDALAN JULIUS S. URIARTE


Engineer II Chief Construction Section
Project Engineer II
MONTHLY GRAPHICAL ACCOMPLISHMENT REPORT
As of February 13, 2017

Project Title : Construction of Multi-Purpose Building Guinhalinan,Barobo,SDS (Phase II ) Legend: - Programmed


Limits :
Location : Barobo, Surigao Del Sur - This Month
Contractor :
Percent
Accomplis
Percent Amount Program Qty Programmed PERCENTAGE PROGRAMED age
Item No. Description hment to
Program Actual Expenditures This Month Unit 10 20 30 40 50 60 70 80 90 100 Accompl
Date(%)
P- - 1,600.87 ished
900(1)c1 Structural Concrete ( Class ''A'', 28 days) #N/A sq.m. #DIV/0! #DIV/0!
A- -
P- - 5,217.36
B.5 Project Billboard/Sign Board #N/A ea #DIV/0! #DIV/0!
A- -
P- #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
A- #N/A
P- - 231.17
801(1) Removal of Structure and Obstruction #N/A L.s. #DIV/0! #DIV/0!
A- -
P- - 513.80
803)1)b Structure Excavation #N/A cu.m. #DIV/0! #DIV/0!
A- -
P- - 2,333.80
804(1)a Embankment ( From Structure Excavation) #N/A cu.m. #DIV/0! #DIV/0!
A- -
P- - 10,761.64
804(1)b Embankment ( From Borrow) #N/A cu.m. #DIV/0! #DIV/0!
A- -
P- - 114.37
804(4) Gravel Fill #N/A cu.m. #DIV/0! #DIV/0!
A- -
106,650.01
P- #N/A #DIV/0!
T O T A L #N/A
A #N/A

Prepared by: Noted:

MATEO T. FUDALAN JULIUS S. URIARTE


Engineer II Chief Construction Section
Project Engineer II
MONTHLY GRAPHICAL ACCOMPLISHMENT REPORT
As of February 13, 2017

Project Title : Construction of Multi-Purpose Building Guinhalinan,Barobo,SDS (Phase II ) Legend: - Programmed


Limits :
Location : Barobo, Surigao Del Sur - This Month
Contractor :
Percent
Accomplis
Percent Amount Program Qty Programmed PERCENTAGE PROGRAMED age
Item No. Description hment to
Program Actual Expenditures This Month Unit 10 20 30 40 50 60 70 80 90 100 Accompl
Date(%)
P- - 1,600.87 ished
900(1)c1 Structural Concrete ( Class ''A'', 28 days) #N/A sq.m. #DIV/0! #DIV/0!
A- -
P- - 5,217.36
B.5 Project Billboard/Sign Board #N/A ea #DIV/0! #DIV/0!
A- -
P- #N/A #N/A
#N/A #N/A #N/A #N/A #N/A #N/A
A- #N/A
P- - 231.17
801(1) Removal of Structure and Obstruction #N/A L.s. #DIV/0! #DIV/0!
A- -
P- - 513.80
803)1)b Structure Excavation #N/A cu.m. #DIV/0! #DIV/0!
A- -
P- - 2,333.80
804(1)a Embankment ( From Structure Excavation) #N/A cu.m. #DIV/0! #DIV/0!
A- -
P- - 10,761.64
804(1)b Embankment ( From Borrow) #N/A cu.m. #DIV/0! #DIV/0!
A- -
P- - 114.37
804(4) Gravel Fill #N/A cu.m. #DIV/0! #DIV/0!
A- -
106,650.01
P- #N/A #DIV/0!
T O T A L #N/A
A #N/A

Prepared by: Noted:

MATEO T. FUDALAN JULIUS S. URIARTE


Engineer II Chief Construction Section
Project Engineer II
SUMMARY OF MPB'S
3 4 5 6 7 8 ###10 11 12 13 14 15 16 17
javier Kinayan
ITEM NO. DESCRIPTION UNIT QTY AMOUNT Unit Cost DESCRIPTION Unit qty amount unit cost
1.1 1 B.3 Permits and Clearances ea 1.00 25,000.00 25,000.00 B.3 Permits and Clearances ea 1.00 20,000.00 20,000.00 B.5
2.1 2 B.5 Project Billboard/Sign Board ea 1.00 5,217.37 5,217.37 B.5 Project Billboard/Sign Board ea 1.00 5,217.36 5,217.36 B.7(2)
3.1 3 B.7(2) Occupational Safety and Health L.s. 1.00 63,750.00 63,750.00 B.7(2) Occupational Safety and Health L.s. 1.00 63,750.00 63,750.00 1032(1)c
4.1 4 801(1) Removal of Structure and Obstruction L.s. 1.00 15,692.25 15,692.25 803(1)b Structure Excavation cu.m. 52.09 12,041.64 231.17 1014(1)b1

5.1 5 803)1)b Structure Excavation cu.m. 14.76 3,010.30 203.95 804(1)a Embankment (From Structure Excavation) cu.m. 32.91 16,909.15 513.80 1013(1)a1
6.1 6 804(1)a Embankment ( From Structure Excavation) cu.m. 9.82 14,123.51 1,438.24 804(4) Gravel Fill cu.m. 4.30 10,035.34 2,333.80 1013(2)b1
7.1 7 804(1)b Embankment ( From Borrow) cu.m. 10.27 20,429.90 1,989.28 900(1)c1 Structural Concrete ( Class ''A'', 28 days) sq.m. 27.09 291,532.82 10,761.64 1047(1)
8.1 8 804(4) Gravel Fill cu.m. 0.97 2,931.69 3,022.37 902(1)a1 Reinforcing Steel (Deformed), Grade 40 kgs 4,557.05 521,189.80 114.37
9.1 9 900(1)c1 Structural Concrete ( Class ''A'', 28 days) sq.m. 23.38 215,638.64 9,223.21 1046(1)a2 150mm CHB Load Bearing (Including ReiforcingSteel) sq.m. 15.18 24,301.20 1,600.87
10.1 10 902(1)a1 Reinforcing Steel (Deformed), Grade 40 kgs 3,484.97 379,687.48 108.95
11.1 11 1046(1)a1 100mm CHB Load Bearing (Including ReiforcingSteel) sq.m. 16.82 25,420.23 1,511.31
12.1 12 1046(1)a2 150mm CHB Load Bearing (Including ReiforcingSteel) sq.m. 28.68 42,631.67 1,486.46
13.1 13 1027(1) Cement Plaster Finish sq.m. 212.59 29,581.89 139.15
14.1 14 1051(6) Railings L.s. 1.00 121,883.78 121,883.78

964,998.71 964,977.31
mamis units qty amount unit cost

Project Billboard/Sign Board L.s 1.00 5,217.37 5,217.37


Occupational Safety and Health L.s 1.00 75,000.00 75,000.00
Painting Steel sq.m. 238.97 13,212.65 55.29
Prepainted Metal Sheet (Corrugated), above 0.427 mm Long Span sq.m. 175.00 174,642.31 997.96

Fabricated Metal Roofing Accesory (Gauge 26-RIdge Roll) l.m. 8.00 11,505.92 1,438.24
Fabricated Metal Roofing Accesory (Gutters, 0.60 mm thk) l.m. 64 87,861.12 1,372.83
Structural Steel L.s 1.00 597,559.89 597,559.89

964,999.26