You are on page 1of 8

Bagi NOSS yang tiada pemberat (weightage)

LANGKAH PENGIRAAN JADUAL PEMBAHAGIAN MASA PEMBELAJARAN BERSEMUKA

1. Kira masa selepas penjajaran COPTPA untuk setiap WA


Competency Unit for IT-020-3:2013 COMPUTER SYSTEM OPERATION

Penjajaran Jam
Training Latihan Untuk
CU Code Competency Unit Hours Dilaksanakan
(Dari NOSS) Bagi Pematuhan
COPTPA (Jam)
IT-020-3:2013-C01 COMPUTER SYSTEM SET-UP 300 460

IT-020-3:2013-C02 COMPUTER SYSTEM MAINTENANCE  120 184

IT-020-3:2013-C03 COMPUTER SYSTEM REPAIR 180 276

IT-020-3:2013-C04 SERVER INSTALLATION 240 368

IT-020-3:2013-C05 SERVER MAINTENANCE 180 276

IT-020-3:2013-C06 COMPUTER NETWORK CONNECTIVITY SET-UP 120 184

IT-020-3:2013-C07 MOBILE DEVICE CONFIGURATION 60 92

Jumlah Tempoh Latihan 1200 1840


Bagi NOSS yang tiada pemberat (weightage)

Training Hours For IT-020-3:2013 COMPUTER SYSTEM OPERATION

Masa Asal Dari CoCU Masa Selepas Penjajaran COPTPA

Work Activities Training Hour Training Hour


Training Hour Training Hour
(Related (Related
(Related Skills) (Related Skills)
Knowledge) Knowledge)
1. Identify computer maintenance re-
quirements 5 13 5/120 x 184 = 8 13/120 x 184 = 20

2. Carry out computer preventive main-


tenance 14 34 14/120 x 184 = 21 34/120 x 184 = 52

3. Perform computer corrective mainten-


14 34 14/120 x 184 = 21 34/120 x 184 = 52
ance
4. Prepare computer maintenance report 2 4 2/120 x 184 = 3 4/120 x 184 = 6
JUMLAH 120 184
Bagi NOSS yang tiada pemberat (weightage)

2. Lengkapkan jadual berikut

JADUAL PENETAPAN PERATUSAN MASA AKTIVITI PEMBELAJARAN DAN PENILAIAN


IT-020-3:2013 COMPUTER SYSTEM OPERATION

IT-020-3:2013-C03 COMPUTER SYSTEM MAINTENANCE

Pecahan Masa (%) Pecahan Masa (Jam)


Jumlah Bersemuk
Kod CU Jam Kendiri Penilaian Bersemuka Kendiri Penilaian
a
(Y) Jumlah
(B/100 X
(A) (B) (C) (A/100 X Y) (C/100 X Y)
Y)
IT-020-3:2013-C02 184 70 20 10 100 193 42 41
Bagi NOSS yang tiada pemberat (weightage)

3. Kira masa bersemuka teori dan amali yang diperolehi. Rujuk % bersemuka pada JADUAL PENETAPAN
PERATUSAN MASA AKTIVITI PEMBELAJARAN DAN PENILAIAN.
Rumus : % Pecahan Masa Bersemuka x Jam (Teori) WA berkenaan

Kiraan Masa Kiraan Masa


Aktiviti Kerja Pelan Mengajar Teori untuk Bersemuka Pelan Mengajar Amali untuk Bersemuka
Rujukan (Teori) Rujukan (Amali)
IT-020-3:2013-C02/KP(/)PM
1. Identify computer () 70% x 8 IT-020-3:2013-C02/KK(/)PM 70% x 20
maintenance 6 14
= 5.6 () = 14
reqiurements

2. Carry out computer IT-020-3:2013-C02/KP(/)PM 70% x


() IT-020-3:2013-C02/KK(/)PM 70% x 52
preventive 21 15 36
() = 36.4
maintenance = 14.7
IT-020-3:2013-C02/KP(/)PM
()

3. Perform computer IT-020-3:2013-C02/KP(/)PM 70% x


() IT-020-3:2013-C02/KK(/)PM 70% x 52
corrective 21 15 36
() = 36.4
maintenance = 14.7
IT-020-3:2013-C02/KP(/)PM
()
Bagi NOSS yang tiada pemberat (weightage)

4. Prepair computer IT-020-3:2013-C02/KP(/)PM 70% x 3 IT-020-3:2013-C02/KK(/)PM 70% x 6


2 4
maintenance report () = 2.1 () = 4.2

JUMLAH : 38 + 90 = 128
38 90
Pastikan = Pecahan Masa (Jam)

4. Lengkapkan Jadual Pembahagian Masa Pembelajaran Bersemuka dengan masa bersemuka teori dan
amali yang dIperolehi.

JADUAL PEMBAHAGIAN MASA PEMBELAJARAN BERSEMUKA

IT-020-3:2013 COMPUTER SYSTEM OPERATION

IT-020-3:2013-C03 COMPUTER SYSTEM REPAIR

Masa Masa
Pelan Mengajar Teori Pelan Mengajar Amali
Aktiviti Kerja Bersemuka Bersemuka
(Teori) (Amali)
1. Identify computer
IT-020-3:2013-C02/KP(/)PM IT-020-3:2013-C02/KK(/)PM
maintenance 4 10
() ()
requirements

2. Carry out computer pre- IT-020-3:2013-C02/KP(/)PM I IT-020-3:2013-C02/KK(/)PM


4 24
ventive maintenance () ()

3. Perform computer cor- IT-020-3:2013-C02/KP(/)PM IT-020-3:2013-C02/KK(/)PM


8 50
rective maintenance () ()
Bagi NOSS yang tiada pemberat (weightage)

IT-020-3:2013-C02/KP(/)PM
6
()

6
IT-020-3:2013-C02/KP(/)PM
()

4. Perform computer cor- 4 9


IT-020-3:2013-C02/KP(/)PM IT-020-3:2013-C02/KK(/)PM
rective maintenance () ()
Bagi NOSS yang tiada pemberat (weightage)

Masa Masa
Pelan Mengajar Teori Pelan Mengajar Amali
Aktiviti Kerja Bersemuka Bersemuka
(Teori) (Amali)
1. Analyse job order / IT-020-3:2013-C01/KP(/)PM
() IT-020-3:2013-C01/KK(/)PM
change request 4 ()
10

2. Prepare computer IT-020-3:2013-C01/KP(/)PM


set-up tools, computer ()
hardware parts and 4 IT-020-3:2013-C01/KK(/)PM () 24
computer software
IT-020-3:2013-C01/KP(/)PM
()
8

3. Set-up computer hard- IT-020-3:2013-C01/KP(/)PM


() IT-020-3:2013-C03/KK(/)PM
ware 6 ()
50

IT-020-3:2013-C01/KP(/)PM 6
()

IT-020-3:2013-C01/KP(/)PM 4 9
4. Carry out computer () IT-020-3:2013-C01/KK(/)PM
software installation ()

IT-020-3:2013-C01/KP(/)PM
5. Set-up computer peri- () IT-020-3:2013-C01/KK(/)PM
pherals ()
Bagi NOSS yang tiada pemberat (weightage)

IT-020-3:2013-C01/KP(/)PM
6. Carry out unit function- () IT-020-3:2013-C01/KK(/)PM
ality test ()

IT-020-3:2013-C01/KP(/)PM
7. Prepare computer sys- () IT-020-3:2013-C01/KK(/)PM
tem set-up report ()

You might also like