You are on page 1of 8

JADUAL PENETAPAN PERATUSAN MASA AKTIVITI PEMBELAJARAN DAN PENILAIAN

IT-020-4:2013-COMPUTER SYSTEM ADMINISTRATION


IT-020-4:2013-C01 SERVER CONFIGURATION

Pecahan Masa (%) Pecahan Masa (Jam)


Kod CU Jumlah Jam (Y)
Bersemuka Kendiri Penilaian Bersemuka Kendiri Penilaian
Jumlah
(A) (B) (C) (A/100 X Y) (B/100 X Y) (C/100 X Y)
IT-020-4:2013-C01 260 60 18 22 100 156 47 57
IT-020-4:2013-C02 240 60 18 22 100 144 43 53
IT-020-4:2013-C03 200 60 19 21 100 120 38 42
IT-020-4:2013-C04 200 60 20 20 100 120 40 40
IT-020-4:2013-C05 140 60 20 20 100 84 28 28
IT-020-4:2013-E01 200 60 20 20 100 120 40 40
1240 744 236 260
1240
JADUAL PEMBAHAGIAN MASA PEMBELAJARAN BERSEMUKA
IT-020-4:2013-COMPUTER SYSTEM ADMINISTRATION
IT-020-4:2013-C01 SERVER CONFIGURATION

Theory Training Theory Lesson Plan Masa Bersemuka Practical Training Practical Lesson Plan Masa Bersemuka
Work Activities
Hours (Tajuk) ( Teori ) Hours (Tajuk) ( Amali )

PENGENALAN KEPADA PERANCANGAN


6.3
PENYEBARAN PELAYAN PASANG PERISIAN OPERATING SISTEM
1. Plan Server Deployment 21 31 18.6
PENGENALAN KEPADA DOKUMENTASI PELAYAN
6.3
PELAYAN
PENGENALAN KEPADA PEMANTAUAN
2. Monitor Server Installation 12 7.2 19 LAKUKAN PROSES PEMULIHAN PELAYAN 11.4
PEMASANGAN
PENGENALAN KEPADA PEMASANGAN
7.7
PATCH LAKSANAKAN PEMASANGAN PATCH
19.4
PENGENALAN KEPADA KONFIGURASI
7.7
PELAYAN
PENGENALAN KEPADA PEMULIHAN
3. Carry Out Server Configuration 64 7.7 97
PELAYAN PASANG PERISIAN PEMANTAUAN
19.4
PENGENALAN KEPADA PENGUJIAN PELAYAN
7.7
PELAYAN
BUAT UJIAN PENERIMAAN PENGGUNA
PENGENALAN KEPADA UAT PELAYAN 7.7 19.4

PENGENALAN KEPADA DOKUMEN


4. Produce Server Configuration Report 6 3.6 10 RANGKA KAD JAMINAN PRODUK PELAYAN 6
PELAYAN
103 61.9 157 94.2 156

260
JADUAL PEMBAHAGIAN MASA PEMBELAJARAN BERSEM
IT-020-4:2013-COMPUTER SYSTEM ADMINISTRATION
IT-020-4:2013-C01 SERVER CONFIGURATION
Masa
Theory Lesson Plan
Work Activities Bersemuka
(Tajuk)
( Teori )

PENGENALAN KEPADA PERANCANGAN


6.3
PENYEBARAN PELAYAN
1. Plan Server Deployment
PENGENALAN KEPADA DOKUMENTASI
6.3
PELAYAN

PENGENALAN KEPADA PEMANTAUAN


2. Monitor Server Installation 7.2
PEMASANGAN

PENGENALAN KEPADA PEMASANGAN


7.7
PATCH

PENGENALAN KEPADA KONFIGURASI


7.7
PELAYAN

PENGENALAN KEPADA PEMULIHAN


3. Carry Out Server Configuration 7.7
PELAYAN
3. Carry Out Server Configuration

PENGENALAN KEPADA PENGUJIAN


7.7
PELAYAN

PENGENALAN KEPADA UAT PELAYAN 7.7

PENGENALAN KEPADA DOKUMEN


4. Produce Server Configuration Report 3.6
PELAYAN

61.9
AGIAN MASA PEMBELAJARAN BERSEMUKA
013-COMPUTER SYSTEM ADMINISTRATION
0-4:2013-C01 SERVER CONFIGURATION
Masa
Practical Lesson Plan
Bersemuka
(Tajuk)
( Amali )

PASANG PERISIAN OPERATING SISTEM


18.6
PELAYAN

LAKUKAN PROSES PEMULIHAN PELAYAN 11.4

LAKSANAKAN PEMASANGAN PATCH 19.4

PASANG PERISIAN PEMANTAUAN


19.4
PELAYAN
PASANG PERISIAN PEMANTAUAN
19.4
PELAYAN

BUAT UJIAN PENERIMAAN PENGGUNA 19.4

RANGKA KAD JAMINAN PRODUK PELAYAN 6

94.2
JADUAL PEMBAHAGIAN WIM (TEORI)
IT-020-4:2013-COMPUTER SYSTEM ADMINISTRATION
IT-020-4:2013-C01 SERVER CONFIGURATION

Theory Lesson Plan Information Sheet Assignment Sheet


Work Activities
(Tajuk) (Tajuk) ( Tajuk )

(IT-020-4:2013-C01/P(1/9)PM IT-020-4:2013-C01/P(1/9) IT-020-4:2013-C01/T(1/9)


(PENGENALAN KEPADA PERANCANGAN (PENGENALAN KEPADA PERANCANGAN (PENGENALAN KEPADA PERANCANGAN
PENYEBARAN PELAYAN) PENYEBARAN PELAYAN) PENYEBARAN PELAYAN)
1. Plan Server Deployment
IT-020-4:2013-C01/P(2/9)PM IT-020-4:2013-C01/P(2/9) IT-020-4:2013-C01/T(2/9)
(PENGENALAN KEPADA DOKUMENTASI (PENGENALAN KEPADA (PENGENALAN KEPADA DOKUMENTASI
PELAYAN ) DOKUMENTASI PELAYAN ) PELAYAN )
IT-020-4:2013-C01/P(3/9)
IT-020-4:2013-C01/P(3/9)PM IT-020-4:2013-C01/T(3/9)
2. Monitor Server Installation (PENGENALAN KEPADA PEMANTAUAN (PENGENALAN KEPADA
(PENGENALAN KEPADA PEMANTAUAN
PEMASANGAN) PEMANTAUAN PEMASANGAN)
PEMASANGAN)
IT-020-4:2013-C01/P(4/9)PM IT-020-4:2013-C01/P(4/9) IT-020-4:2013-C01/T(4/9)
(PENGENALAN KEPADA PEMASANGAN (PENGENALAN KEPADA PEMASANGAN (PENGENALAN KEPADA PEMASANGAN
PATCH ) PATCH) PATCH )

IT-020-4:2013-C01/P(5/9) IT-020-4:2013-C01/T(5/9)
IT-020-4:2013-C01/P(5/9)PM (PENGENALAN
(PENGENALAN KEPADA KONFIGURASI (PENGENALAN KEPADA KONFIGURASI
KEPADA KONFIGURASI PELAYAN)
PELAYAN) PELAYAN)

IT-020-4:2013-C01/P(6/9)PM IT-020-4:2013-C01/P(6/9) IT-020-4:2013-C01/T(6/9)


3. Carry Out Server Configuration (PENGENALAN KEPADA PEMULIHAN (PENGENALAN KEPADA PEMULIHAN (PENGENALAN KEPADA PEMULIHAN
PELAYAN) PELAYAN) PELAYAN)

IT-020-4:2013-C01/P(7/9)PM IT-020-4:2013-C01/P(7/9) IT-020-4:2013-C01/T(7/9)


(PENGENALAN KEPADA PENGUJIAN (PENGENALAN KEPADA PENGUJIAN (PENGENALAN KEPADA PENGUJIAN
PELAYAN) PELAYAN) PELAYAN)

IT-020-4:2013-C01/P(8/9)PM IT-020-4:2013-C01/P(8/9) IT-020-4:2013-C01/T(8/9)


(PENGENALAN KEPADA UAT PELAYAN) (PENGENALAN KEPADA UAT PELAYAN) (PENGENALAN KEPADA UAT PELAYAN)

IT-020-4:2013-C01/P(9/9)PM IT-020-4:2013-C01/P(9/9) IT-020-4:2013-C01/T(9/9)


4. Produce Server Configuration Report (PENGENALAN KEPADA DOKUMEN (PENGENALAN KEPADA DOKUMEN (PENGENALAN KEPADA DOKUMEN
PELAYAN) PELAYAN ) PELAYAN)
JADUAL PEMBAHAGIAN WIM (AMALI)
IT-020-4:2013-COMPUTER SYSTEM ADMINISTRATION
IT-020-4:2013-C01 SERVER CONFIGURATION

Practical Lesson Plan Work Sheet


Work Activities
(Tajuk) ( Tajuk )

IT-020-4:2013-C01/K(1/6)PM IT-020-4:2013-C01/K(1/6)
1. Plan Server Deployment (PASANG (PASANG PERISIAN
PERISIAN OPERATING SISTEM PELAYAN) OPERATING SISTEM PELAYAN)

IT-020-4:2013-C01/K(2/6)PM IT-020-4:2013-C01/K(2/6)
2. Monitor Server Installation (LAKUKAN PROSES (LAKUKAN PROSES
PEMULIHAN PELAYAN) PEMULIHAN PELAYAN)

IT-020-4:2013-C01/K/(3/6)PM IT-020-4:2013-C01/K(3/6)
(LAKSANAKAN (LAKSANAKAN PEMASANGAN
PEMASANGAN PATCH) PATCH)

IT-020-4:2013-C01/K(4/6)PM IT-020-4:2013-C01/K(4/6)
3. Carry Out Server Configuration (PASANG PERISIAN (PASANG PERISIAN
PEMANTAUAN PELAYAN) PEMANTAUAN PELAYAN)

IT-020-4:2013-C01/K(5/6)PM IT-020-4:2013-C01/K(5/6)
(BUAT UJIAN (BUAT UJIAN
PENERIMAAN PENGGUNA) PENERIMAAN PENGGUNA)
IT-020-4:2013-C01/K(6/6)PM IT-020-4:2013-C01/K(6/6)
4. Produce Server Configuration Report (RANGKA KAD JAMINAN (RANGKA KAD JAMINAN PRODUK
PRODUK PELAYAN) PELAYAN)

You might also like