1 2 3 4 5 6 7 8
1 Jindal Organization 21.05.2001 1- Rail & Beam Mill 75000 TPA 1900.00 Raigarh Greenfield
New Delhi 2- C.P.P. 110 MW Projects
3- Steel Products 205000 TPA
4- Coal Washery 2500000 TPA
5- Aluminium Plant 50000 TPA
6- Ferro Chrome Plant 60000 TPA
7- DRI Plant 450000 TPA
8- Mini Blast Furnace 250000 TPA
9- Development of additional coal
mines
2 Monnet Group of 21.05.2001 1- Steel Products 300000 TPA 570.00 Raipur Greenfield
Companies, Mandir 2- C.P.P. 55 MW Projects
Hasoud, Raipur 3- Sponge Iron 300000 TPA
4- Structural Rolling Mill 300000 TPA
5- Ferro Alloys 50000 TPA
1- Steel Bar & Section making 150000 TPA 590.00 Raigarh Greenfield
2- Sponge Iron Plant 300000 TPA Projects
3- Steel Ingot Making Facility 150000 TPA
4- Coal Mining & Washery 110000 MT
5- Power Plant 70.5 MW
3 Bharat Aluminium 29.05.2002 1- Expansion of Aluminium Smelter 300000 TPA 6000.00 Korba Greenfield
Company Plant Projects
2- Power Plant 600 MW
4 Jindal Steel & Power 23.10.2002 1- Private Industrial State Raigarh 11.00 Raigarh Greenfield
Ltd., Raigarh Projects
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 1 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
5 M.S.P. Steel & 03.02.2003 1- Sponge Iron Plant 400000 MT 175.59 Raigarh Greenfield
Power Pvt. Ltd., 2- M.S. Ingot/Billets Plant 210000 MT Projects
Kolkata 3- Power Plant 20 MW
4- Coal Washery 72000 TPA
5- Captive Coal Mines 600000 TPA
6 Sunil Sponge Iron 03.02.2003 1- Sponge Iron Plant 90000 TPA 105.11 Raigarh Greenfield
Ltd. Kolkata 2- Steel Plant 100000 TPA Projects
3- Power Plant 14 MW
7 Ind Agro Synergy 05.03.2003 1- Sponge Iron, Stell Billet 400000 TPA 413.00 Raigarh Greenfield
Ltd. , Nagpur 2- Power Plant 8 MW Projects
3- Coal Washery 1.26 MTPA
8 Anjani Steel (P) Ltd., 17.07.2003 1- Sponge Iron Plant 180000 TPA 185.00 Raigarh Greenfield
AIlahabad 2- Captive Power Plant 10 MW Projects
3- Steel Plant 150000 TPA
4- Coal Mines
9 Superior Sponge Iron 29.08.2003 1- Sponge Iron Plant 200000 TPA 330.00 Durg Greenfield
Pvt. Ltd. & Other 2- Power Plant 24 MW Projects
Associate 3- Pig Iron Plant 150000 TPA
Companies 4- Steel Melting Shop 300000 TPA
5- Rolling Mill 225000 TPA
6- Coke Oven Unit 100000 TPA
10 Navbharat Group of 8.9.2003 1- Sponge Iron Project 500000 TPA 1460.00 Raipur And Greenfield
Companies Raipur 2- Captive Power Plant 16 MW Bastar Projects
3- Steel Plant
4- Coal Mining & Washery 5000000 TPA
5- Power Plant 200 MW
6- Integrated Sugar Plant 2500 TCD
11 Akshay Investment 8.9.2003 1- Sponge Iron Plant 90000 TPA 115.00 Rajnadgaon Greenfield
Pvt. Ltd., Raipur 2- Captive Power Plant 14 MW Projects
3- Induction Furnance Unit 105000 TPA
4- Captive Coal Mines
5- Captive Iron Ore Mines
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 2 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
12 Shri Bajrang Power 8.9.2003 1- Sponge Iron Plant 90000 TPA 130.00 Raipur Greenfield
& Ispat Ltd. Raipur 2- Power Plant 25 MW Projects
3- Pig Iron Plant (Mini Blast Furnace ) 60000 MT
13 Godavari Power & 16.08.2004 1- Sponge Iron Plant 650000 TPA 493.00 Raipur Greenfield
Ispat Ltd., Raipur 2- Steel Billets / Ingots 550000 TPA Projects
3- Power Plant 50 MW
4- Ferro Alloys 33000 TPA
5- HB/GI/Barbed & other Wires 30000 TPA
6- Iron Ore & Coal Mines 3000000 TPA
14 Vandana Global 16.08.2004 1- Sponge Iron 351000 MT 426.00 Raipur Greenfield
Ltd., Raipur 2- Power Plant 80 MW Projects
3- Furnesh (Ingots/ Billets) 167520 MT
4- Crusher Plant 360000 MT
5- Ferro Alloys (Silico Maganies) 48000 MT
15 S.K.S. Ispat Pvt. 16.08.2004 1- Sponge Iron 270000 TPA 295.47 Raipur Greenfield
Ltd., Mumbai 2- Power Plant 25 MW Projects
3- Steel Melting Shop 210000 TPA
4- Rolling Mill 210000 TPA
16 Jindal Steel & Power 07.01.2005 1- Plate Mill 1000000 TPA 2595.00 Raigarh Greenfield
Ltd., Raigarh 2- Blast Furnance 1225000 TPA Projects
3- Rolling Mill for Re-Bar, TMT and 70000 TPA
Wire Rce
4- Power Plant 99 MW
5- Steel Melting Shop 1225000 TPA
6- Sinter Plant 2500000 TPA
7- Cock Oven Plant 800000 TPA
8- Oxygen Plant 2 x 380 TPD
9- Lime & Dolomite Kiln 3 x 330 TPD
10- Railway Line from Captive Coal -
Mines to Plant Site
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 3 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
17 Chhattisgarh 07.01.2005 1- Sponge Iron Plant 120000 TPA 2010.00 Raipur Greenfield
Electricity Company 2- Power Plant 250 MW Projects
Ltd., Raipur 3- Steel Plant 1000000 TPA
4- Cock Oven 400000 TPA
5- Pelletizing and Sintering 1800000 TPA
6- Coal Mining & Coal Washery -
18 Prakash Industries 07.01.2005 1- Cock based Sponge Iron Plant (DRI 400000 TPA 1017.00 Janjgir Champa Greenfield
Limited, Champa Plant) & Raipur Projects
2- Captive power plant (Co-generation 25 MW
of power)
3- Captive power plant, coal based 190 MW
(fluidized bed boiler & thermal
boiler)
4- Steel Billets/Blooms/Ingots making 900000 TPA
facility (Steel melting shop-II)
5.a- Development of captive coal mines 1000000 TPA
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 4 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
19 Chhattisgarh Steel & 07.01.2005 1- Power Generation (3 x 30 MW Coal 112.5 MW 464.88 Janjgir Champa Greenfield
Power Ltd., Raipur + 3 x 7.5 MW WHR based) Projects
2- Sponge Iron (3 x 350 TPD) 380000 TPA
20 Pushp Steel & 07.01.2005 1- Sponge Iron Plant (350 TPD x 3) 315000 TPA 380.00 Durg Greenfield
Mining Pvt. Ltd., 2- Captive Power Plant (8 x 3) 24 MW Projects
Delhi 3- Low Pollution (Euro-IV & V)
compliant automotive parts made out
of captive materials
21 Salasalar Sponge & 07.01.2005 1- Sponge Iron Plant 120000 TPA 287.51 Raigarh Greenfield
Power Limited, 2- Coal Washery 576000 TPA Projects
Raipur 3- Power Plant 30 MW
4- Steel Plant 100000 TPA
5- Ferro Alloys 20000 TPA
22 Shree Radhe 07.01.2005 1- Sponge Iron Plant 260000 TPA 232.50 Bilaspur Greenfield
Industries Ltd., 2- Captive Power Plant 34 MW Projects
Bilaspur 3- Steel Melting Shop 50000 TPA
23 Satyarth Steel & 07.01.2005 1- Coal based Sponge Iron Plant 219999 TPA 175.00 Raipur Greenfield
Power Pvt. Ltd., 2- Captive Power Plant 131400 MW Projects
Raipur 3- Steel Plant (Induction Furnace) 182500 Tonne
4- Re-Rolled Products 31400 TPA
24 API Ispat & 07.01.2005 1- Sponge Iron Plant (350 TPD x 3) 315000 TPA 158.00 Raipur Greenfield
Powertech (P) Ltd., 2- Power Plant 16 MW Projects
New Delhi 3- Steel Ingots (12 MT x 2) 86400 TPA
25 Topworth Steels Pvt. 07.01.2005 1- Sponge Iron Plant 120000 TPA 129.00 Durg Greenfield
Ltd., Mumbai 2- Power Plant 15 MW Projects
3- Steel Melting Shop, Concast rolling 100000 TPA
mill
26 Crest Steel & Power 07.01.2005 1- Sponge Iron Plant 210000 TPA 116.50 Rajnadgaon Greenfield
(P) Ltd., Bhilai 2- Thermal Power Plant 16 MW Projects
3- Ferro Alloys 18 MVA
27 Tata Steels Ltd., 06.04.2005 1- Integreated Steel Plant with 630 MW 5000000 TPA 10000.00 Bastar Greenfield
Mumbai CPP Projects
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 5 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
28 Essar Steel 07.05.2005 1- Integreated Steel Plant with 100 MW 3200000 TPA 7000.00 South Bastar Greenfield
Chhattisgarh Ltd., CPP (Dantewada) Projects
Hazira
29 Shri Bajrang Power 06.10.2006 1- Coke Oven Battery 2.00 mTPA 1400.00 Raipur Brownfield
& Ispat Ltd. Raipur 2- Sinter Plant 2.27 LTPA Projects
3- Blast Furnace with Pig Casting 2.31 LTPA
Machine
4- Steel Melting and Continuous 2.70 LTPA
Casting Shop
5- Sponge Iron (DRI) Plant 6.00 LTPA
6- Captive Power Plant 100 MW
7- Re Bar Mill 1.00 LTPA
8- Section Mill 1.00 LTPA
9- Oxygen Plant 0.60 mCMPA
10- Bauxite Calcinations Plant 3.00 LTPA
11- Coal Washery 5.00 mTPA
12- Pelletization Plant 1.00 mTPA
13- Ferro Alloys 36000 TPA
30 Ind Synergy Ltd. , 06.10.2006 1- Sponge Iron 4.00 LTPA 960.00 Raigarh Brownfield
Nagpur 2- Captive Power Plant 132 MW Projects
3- Coke Oven & Washery 210 MT/hr
4- Blast Furnace 450.00 Cu.Mtr
31 S.K.S. Ispat Pvt. 06.10.2006 1- Sponge Iron 3.30 LTPA 1175.00 Raipur Brownfield
Ltd., Mumbai 2- Captive Power Plant 130 MW Projects
3- SMS / Concast 2.37 LTPA
4- Rolling Mill 1.60 LTPA
5- Ferro Alloys 2x9 MVA
6- Coal Washery 1.00 mTPA
7- Sponge Iron 2nd phase 5.00 LTPA
8- Coke Oven / Sinter Plant 11.00 LTPA
9- Arc Furnace 8.00 LTPA
10- Oxygen Plant 10.00 TPD
11- Rolling Mill Special Steel 6.00 LTPA
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 6 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
32 Raipur Alloys & 06.10.2006 1- Sponge Iron 5.00 LTPA 720.00 Raipur Brownfield
Steel Limited, Raipur 2- Steel 2.40 LTPA Projects
3- Captive Power Plant 40 MW
4- Structural Rolling Mill 2.00 LTPA
5- Coal Washery 4.00 LTPA
33 Lafarge India Private 06.10.2006 1- Clinker 1.50 mTPA 515.00 Raipur Brownfield
Limited, Sonadih, 2- Blended Cement 0.10 mTPA Projects
34 Raipur
Ambuja Cement 07.12.2006 1- Blended Cement *1.70 mTPA 1288.89 Raipur Brownfield
Eastern Limited, 2- Clinker 2.72 mTPA Projects
Raipur 3- Captive Power Plant 48 MW
35 Shri Bajrang 21.12.2006 1- Ribd Bar Mill 1.25 LTPA 109.41 Raipur Brownfield
Metalics & Power 2- Captive Power Plant 12 MW Projects
Ltd., Raipur 3- Pig Iron 0.60 MW
36 Rajesh Strips Ltd., 16.01.2007 1- Steel Melting Shop 3.00 LTPA 120.00 Raipur Brownfield
Raipur 2- Structural Mill 1.50 LTPA Projects
37 Rajesh Strips Ltd., 16.01.2007 1- Captive Power Plant 50 MW 200.00 Raipur Greenfield
Raipur Projects
38 Emami Paper Mills 30.03.2007 1- Clinker 2.70 mTPA 1600.00 Raipur Greenfield
Ltd., Kolkata 2- Cement 4.05 mTPA Projects
3- Power 50x2 MW
39 ACC Limited, Durg 30.03.2007 1- Clinker 1.25 mTPA 400.00 Durg Brownfield
2- Cement 2.50 mTPA Projects
40 ACC Limited, Durg 30.03.2007 1- Clinker 2.72 mTPA 1400.00 Bilaspur Greenfield
2- Cement 4.05 mTPA Projects
41 Grasim Industries 30.03.2007 1- Clinker 0.45 mTPA 180.00 Raipur Brownfield
Ltd., Raipur 2- Cement 0.94 mTPA Projects
3- Captive Power Plant 30 MW
42 Grasim Industries 30.03.2007 1- Clinker 2.72 mTPA 1200.00 Raipur Greenfield
Ltd., Raipur 2- Cement 3.50 mTPA Projects
43 Monnet Ispat & 30.03.2007 1- Clinker 1.00 mTPA 1400.00 Raigarh Greenfield
Energy Ltd., Raipur 2- Cement 1.50 mTPA Projects
1- Clinker 1.40 mTPA Raipur Greenfield
2- Cement 2.00 mTPA Projects
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 7 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
44 Jindal Steel & Power 30.03.2007 1- Clinker 1.00 mTPA 720.00 Raigarh Greenfield
Ltd., Raigarh 2- Cement 2.00 mTPA Projects
3- Power 30 MW
45 Rungta Mines Ltd., 30.03.2007 1- Clinker 1.00 mTPA 400.00 Raipur Greenfield
Chaibasa 2- Cement 1.49 mTPA Projects
46 (Jharkhand)
Century Cement, 30.03.2007 1- Clinker 0.20 mTPA 109.60 Raipur Brownfield
Raipur 2- Cement 0.60 mTPA Projects
3- Captive Power Plant 11 MW
47 Jindal Steel & Power 04.05.2007 1- Blast Furnace 3.20 mTPA 8000.00 Raigarh Brownfield
Ltd., Raigarh 2- BOF 3.00 mTPA Projects
3- Ladle Refining Furnace 2x120 MT
4- Casters 2x1.5 mTPA
5- Rolling Mill 3.00 mTPA
6- Oxygen Plant 2800.00 TPD
7- Power Plant 600 MW
8- Railway Siding, RMH, Lime Plant &
Others
48 Bhushan Power & 04.05.2007 1- Integrated Steel Making Facilities 1.20 mTPA 5500.00 Janjgir Champa Greenfield
Steel Ltd., New 2- Captive Power Plant 300 MW & Raigarh Projects
Delhi 3- Rolled Product 4.20 LTPA
4- Wire Drawing 1.80 LTPA
5- Galvanise Wire 1.20 LTPA
6- Steel Casting 1.20 LTPA
7- Forging 0.60 LTPA
8- Alloy Steel/ Stainless Steel Bright 1.20 LTPA
Bar
9- Seamless Pipe 1.80 LTPA
10- Slag Cement Plant 5.00 LTPA
49 Monnet Ispat & 04.05.2007 1- Electric Furnace (Steel Mill) 1.55 mTPA 2087.00 Raigarh Brownfield
Energy Ltd., Raipur 2- Captive Power Plant 170 MW Projects
3- Ferro Alloys Plant 0.075 mTPA
4- Rolling Mill & Plate Mill 1.50 mTPA
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 8 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
49 Monnet Ispat & 04.05.2007
Signing 2087.00
Investment Raigarh
Distt. Brownfield
Energy Ltd., Raipur (Rs. Crore) Projects
1 2 3 4 5 6 7 8
5- Blast Furnace 1.00 mTPA
6- Pelletization Plant 1.80 mTPA
7- Coal Benefication Plant 1.00 mTPA
8- Sinter Plant 0.75 mTPA
9- Sponge Iron Plant for CAPTIVE 0.40 mTPA
USE
50 Vandana Ispat Ltd. 04.05.2007 1- Integrated Steel Plant 8.30 LTPA 1310.00 Rajnadgaon Greenfield
2- Steel Melting Shop 7.50 LTPA Projects
3- Sinter Plant 5.05 LTPA
4- Captive Power Plant 120 MW
5- Rolled Product / Rolling Mill 6.90 LTPA
6- High Grade Iron Ore Pallets 6.00 LTPA
7- Oxygen Plant 60.00 CM
8- Coke Oven Battary 20.00 LTPA
9- Ferro Alloys 48.00 LTPA
10- Coal Tar Products 0.75 LTPA
11- Fly Ash Based Products 1.08 LTPA
12- Coal Washery 12.00 LTPA
51 Topworth Steels Pvt. 04.05.2007 1- Blast Furnace (450 M³) 5.00 LTPA 1225.74 Durg Brownfield
Ltd., Mumbai 2- Sintering Plant (1x60M²) 5.80 LTPA Projects
3- Coke Oven Plant 4.00 LTPA
4- Electric Arc Furnace 70 MW
5- Ferro Alloys (2x9 MVA) 30000 TPA
6- Pelletisation Plant 10.00 LTPA
7- Rolling Mill for Strips 1.00 LTPA
8- Rolling Mill for Special Steels 3.00 LTPA
9- Oxygen Plant 1500 Nm3/Hr
10- Captive Power Plant 80 MW
52 M.S.P. Steel & 04.05.2007 1- Pig Iron 4.00 LTPA 850.00 Raigarh Brownfield
Power Pvt. Ltd., 2- Pellet Plant 6.00 LTPA Projects
Kolkata 3- Billets 3.00 LTPA
4- DRI - (Captive Use) 3.00 LTPA
5- Re-Rolled Products 3.00 LTPA
6- Captive Power Plant 60 MW
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 9 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
53 Salasalar Sponge & 04.05.2007 1- Steel Plant 1.00 LTPA 230.60 Raigarh Brownfield
Power Limited, 2- Captive Power Plant 48 MW Projects
Raipur 3- Coal Washery 4.24 LTPA
54 Lafarge India Private 07.06.2007 1- Clinker 1.60 mTPA 947.50 Janjgir Champa Brownfield
Limited, Mumbai 2- Cement 1.00 mTPA Projects
3- Captive Power Plant 23 MW
55 Shri Cement 07.06.2007 1- Clinker 1.90 mTPA 1000.00 Raipur Greenfield
Limited, Bewar, Dist 2- Cement 2.20 mTPA Projects
- Ajmer (Rajsthan)
56 Singhal Enterprises 23.06.2007 1- Pig Iron (With Sinter 50 Sqm) 2.40 LTPA 500.00 Raigarh Greenfield
Pvt. Ltd., Raigarh 2- Sponge Iron (Captive) 2.00 LTPA Projects
3- Captive Power Plant 60 MW
4- Steel 3.00 LTPA
5- Re-Rolled Mill 2.00 LTPA
6- Coal Washery 1.20 LTPA
57 Anjani Steel (P) Ltd., 02.08.2007 1- Integreated Steel Plant 2.50 LTPA 410.00 Raigarh Brownfield
AIlahabad 2- Ferro Alloys 0.50 LTPA Projects
3- Captive Power Plant 60 MW
58 Jai Balaji Industries 02.08.2007 1- Captive Power Plant 20 MW 280.00 Durg Brownfield
Ltd. (HEG Limited), 2- Sponge Iron Plant 3.50 LTPA Projects
Durg
59 Mangal Sponge & 02.08.2007 1- Sponge Iron Plant 1.20 LTPA 140.00 Bilaspur Brownfield
Steel (P) Ltd., 2- Captive Power Plant 16 MW Projects
Bilaspur 3- Induction Furnace 1.00 LTPA
4- Rolling Mill 0.60 LTPA
60 S.K.Sarawagi & 02.08.2007 1- Sponge Iron Plant 2.10 LTPA 330.00 Raipur Greenfield
Company Ltd., 2- Captive Power Plant 16 MW Projects
Kolkata 3- Steel 1.00 LTPA
4- Rolling Mill 0.60 LTPA
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 10 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
61 Bharat Aluminium 09.08.2007 1- Aluminum Smelter 6.50 LTPA 8100.00 Korba Brownfield
Company Ltd., Projects
Korba
62 Electrosteel Casting 29.11.2007 1- Clinker 2.00 mTPA 1150.00 Kabirdham Greenfield
Ltd, Rajgangpur, 2- Cement 3.00 mTPA Projects
63 Orisa
Maanheruka Cement 01.07.2008 1- Clinker 0.50 mTPA 300.00 Rajnadgaon Greenfield
Ltd, Kolkata 2- Cement 0.75 mTPA Projects
64 SKS Ispat & Power 01.07.2008 1- Clinker 1.00 mTPA 680.00 Bilaspur Greenfield
Ltd., Raipur 2- Cement 2.00 mTPA Projects
3- Captive Power Plant 40 MW
62 Singhal Steels Pvt. 01.07.2008 1- Clinker 1.00 mTPA 600.00 Bilaspur Greenfield
Ltd., Raipur 2- Cement 1.40 mTPA Projects
3- Captive Power Plant 25 MW
66 Prakash Industries 01.07.2008 1- Clinker 1.00 mTPA 485.00 Janjgir Champa Greenfield
Limited, Champa 2- Cement 2.00 mTPA Projects
67 Sarda Energy & 01.07.2008 1- Clinker 1.00 mTPA 550.00 Durg Greenfield
Minerals Ltd., 2- Cement 2.00 mTPA Projects
Raipur
68 Topworth Cement 01.07.2008 1- Clinker 1.00 mTPA 666.31 Durg Greenfield
Pvt. Ltd., Mumbai 2- Cement 2.00 mTPA Projects
3- Captive Power Plant 40 MW
69 Godawari Power & 01.07.2008 1- Clinker 1.00 mTPA 628.00 Durg Greenfield
Ispat Ltd., Raipur 2- Cement 2.00 mTPA Projects
3- Captive Power Plant 50 MW
70 Adhunik Corporation 07.08.2008 1- Clinker 1.00 mTPA 700.00 Raipur Greenfield
Ltd., Kolkata 2- Cement 1.50 mTPA Projects
3- Captive Power Plant 50 MW
71 Aryan Ispat & Power 07.08.2008 1- Clinker 1.00 mTPA 593.98 Bilaspur Greenfield
Pvt. Ltd., Bilaspur 2- Cement 1.50 mTPA Projects
3- Captive Power Plant 1.50 mTPA
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 11 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
72 Shri Bajrang 07.08.2008 1- Clinker 1.00 mTPA 735.00 Durg Greenfield
Metalics & Power 2- Cement 1.50 mTPA Projects
Ltd., Raipur 3- Captive Power Plant 50 MW
73 Jai Prakash 07.08.2008 1- Clinker 1.50 mTPA 1005.00 Raipur Greenfield
Associates Ltd., New 2- Cement 2.00 mTPA Projects
Delhi 3- Captive Power Plant 25 MW
74 Kasturi Cement Pvt. 07.08.2008 1- Clinker 0.35 mTPA 150.00 Raipur Greenfield
Ltd., Raipur 2- Cement 0.50 mTPA Projects
75 K.P.Cement 07.08.2008 1- Clinker 0.50 mTPA 325.00 Durg Greenfield
Menuifacturing Co. 2- Cement 0.75 mTPA Projects
76 Pvt.
MSPLtd.,
SteelDurg
& Power 07.08.2008 1- Clinker 1.00 mTPA 800.00 Durg Greenfield
Ltd., Kolkata 2- Cement 1.50 mTPA Projects
3- Captive Power Plant 50 MW
77 Shyam Century 07.08.2008 1- Clinker 1.00 mTPA 550.00 Janjgir Champa Greenfield
Ifrastructure Ltd., 2- Cement 1.50 mTPA Projects
Raipur
78 Ultratech Cement 07.08.2008 1- Clinker 2.00 mTPA 1100.00 Raipur Greenfield
Ltd., Raipur 2- Cement 3.00 mTPA Projects
3- Captive Power Plant 50 MW
79 Aarti Sponge & 08.08.2008 1- Sponge Iron Plant 1.05 LTPA 305.00 Raipur Greenfield
Power Ltd., Raipur 2- Captive Power Plant 10 MW Projects
3- Steel Melting Shop 0.90 LTPA
4- Rolling Mill 2.00 LTPA
5- Palletizing & Benificiation Plant 6.00 LTPA
6- Fly Ash Bricks 3 LTPA
80 API Ispat & 08.08.2008 1- Coke Oven Plant (Non Recovery) 3.00 LTPA 1015.00 Raipur Greenfield
Powertech (P) Ltd., 2- Sinter Plant 3.96 LTPA Projects
Raipur 3- Blast Furnace 2.45 LTPA
4- Palletizing Plant 6.00 LTPA
5- Sponge Iron Plant 5.25 LTPA
6- Electric Arc Furnace 2.73 LTPA
7- Rolling Mill - Bar 1.00 LTPA
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 12 of 30
80 API Ispat & 08.08.2008 1015.00 Raipur Greenfield
Powertech (P) Ltd., Projects
S.No. Raipur
Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
8- Section Mill 1.00 LTPA
9- Captive Power Plant 80 MW
10- Coal Washery 20.00 LTPA
11- Ferro Alloys Plant 0.36 LTPA
81 Jai Balaji Industries 08.08.2008 1- Iron Ore Pellet Plant 1.20 mTPA 1450.00 Durg Greenfield
Ltd., Kolkata 2- Sinter Plant 0.458 mTPA Projects
3- DRI Plant 0.60 mTPA
4- Mini Blast furnace 0.458 mTPA
5- Captive Power Plant 96 MW
6- Coal Washery 1.549 mTPA
7- Steel Melt Shop 1.00 mTPA
8- Rolling Mill 0.50 mTPA
82 Baldev Alloys Pvt. 08.08.2008 1- Sponge Iron Plant 4.50 LTPA 430.00 Baster & Greenfield
Ltd., Raipur 2- Captive Power Plant 40 MW Raipur Projects
3- Palletizing & Benificiation Plant 3.00 LTPA
4- SMS Plant 2.00 LTPA
83 Crest Steel & Power 08.08.2008 1- Sponge Iron Plant 0.75 mTPA 1536.00 Rajnadgaon Brownfield
(P) Ltd., Mumbai 2- Captive Power Plant 90 MW Projects
3- Steel Melting Shop 5.00 LTPA
4- Electric Arc Furnace 3.20 LTPA
5- Coal Washery 3.00 mTPA
6- Rolling Mill 6.00 LTPA
7- Iron Ore Crushing Plant 1.80 mTPA
8- Wire Rod Mill 2.00 LTPA
9- Ferro Alloys Plant 0.60 LTPA
84 Godawari Power & 08.08.2008 1- DRI Plant 6.00 LTPA 1570.00 Raipur Brownfield
Ispat Ltd., Raipur 2- Pig Iron 2.00 LTPA Projects
3- Steel Billet 6.00 LTPA
4- Steel Rolled Products 5.00 LTPA
5- Captive Power Plant 100 MW
6- Ferro Alloys Plant 0.20 LTPA
7- Calcination Plant 1.00 LTPA
8- Palletizing Plant 30.00 LTPA
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 13 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
85 Jindal Steel & Power 08.08.2008 1- Pallet Plant 7.00 mTPA 18300.00 Raigarh Brownfield
Ltd., Raigarh 2- Coal Gaisifires 18 Unit Projects
3- DRI Plant 5.20 mTPA
4- Electric Arc Furnace 2 x 250 t
5- Ladle Furnace 4 x 250 t
6- Slab Caster 3 x 1 Sreand
7- Rolling Mill 2.00 mTPA
8- Hot Strip Mill 2.00 mTPA
9- Oxygen Plant 4000 TPD
10- Captive Power Plant 1000 MW
11- Utility, Electrical, RMH etc. As required to cater to
12- Railway Siding, Infrastructure, As required to cater to
Transport etc. above major
13- Ancillary facilities necessary for the production- facilities.
above units
86 Khetan Sponge & 08.08.2008 1- Sponge Iron Plant 0.90 LTPA 209.00 Raipur Brownfield
Infrastructure Pvt. 2- Palletization Plant 3.00 LTPA Projects
Ltd., Raipur 3- Induction Furnace 0.60 LTPA
4- Rolling Mill 0.58 LTPA
5- Coal Washery 1.00 MTPA
6- Captive Power Plant 16 MW
87 Nalwa Steel & 08.08.2008 1- DRI Plant (Coal Based) 3.30 LTPA 3100.00 Raigarh Brownfield
Power Ltd., Raigarh 2- Blast Furnace 3.19 LTPA Projects
3- Sinter Plant 3.68 LTPA
4- Steel Melting Shop 3.36 LTPA
5- Captive Power Plant (WHRB) 25 MW
6- Captive Power Plant (AFBC) 51 MW
7- DRI Plant (Gas Based) 2.00 mTPA
8- Coal Gasification Plant 1790 million
Nm3/Yr
9- Structural Mill 2.00 LTPA
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 14 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
88 Jayswal Neco 08.08.2008 1- Sponge Iron Plant 0.60 mTPA 2020.00 Bilaspur Greenfield
Industries Ltd., 2- Steel Billets 0.70 mTPA Projects
Raipur 3- Rolling Mill 0.65 mTPA
4- Pig Iron 0.35 mTPA
5- Captive Power Plant 90 MW
6- Coke Oven 0.20 mTPA
7- Sinter Plant 0.40 mTPA
89 Nova Iron & Steel 08.08.2008 1- Sponge Iron Plant 0.60 mTPA 606.00 Bilaspur Brownfield
Ltd., Bilaspur 2- Captive Power Plant (WHRB) 40 MW Projects
3- Captive Power Plant (Coal 24 MW
Middings)
90 Raipur Power & 08.08.2008 1- Sponge Iron Plant 1.35 LTPA 135.00 Durg Greenfield
Steel Ltd., Ludhiana 2- Captive Power Plant 12 MW Projects
3- Induction Furnace 0.90 LTPA
4- Rolling Mill 0.90 LTPA
91 Rashmi Ispat Private 08.08.2008 1- Sponge Iron Plant 3.15 LTPA 550.00 Raigarh Greenfield
Limited, Raipur 2- Steel Melting Shop 2.10 LTPA Projects
3- Captive Power Plant 40 MW
4- Pig Iron 0.90 LTPA
5- Ferro Alloys Plant 0.60 LTPA
6- Rolling Mill 1.20 LTPA
7- Coal Washery 6.00 LTPA
92 Real Ispat & Power 08.08.2008 1- Sponge Iron Plant *0.72 mTPA 1190.00 Raipur Greenfield
Ltd., Raipur 2- Blast Furnace 0.30 mTPA Projects
3- Captive Power Plant *162 MW
4- SMS with CCM 0.30 MTPA
5- Rolling Mill 0.30 MTPA
6- Oxygen Plant 3.00 MCMPA
7- Coke Oven Plant 0.30 mTPA
8- Sinter Plant 0.30 MTPA
9- Palletization Plant 0.60 mTPA
10- Ferro Alloys Plant 0.06 mTPA
11- Coal Washery 1.70 mTPA
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 15 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
93 R.L. Steel & Energy 08.08.2008 1- Sponge Iron Plant 4.00 LTPA 293.00 Raigarh Greenfield
Ltd., New Delhi 2- Captive Power Plant 18 MW Projects
3- Steel Melting Shop 1.00 LTPA
94 Satya Power & Ispat 08.08.2008 1- Sponge Iron Plant 800.00 TPD 376.00 Bilaspur Brownfield
Pvt. Ltd., Bilaspur 2- Captive Power Plant 74 MW Projects
3- Induction Furnace 72.00 TPH
4- Ladle Furnace 8.00 TPH
5- Coal Washery 100.00 TPH
85 Shree Shyam Sponge 08.08.2008 1- Sponge Iron Plant 1.35 LTPA 205.00 Raipur Brownfield
& Power Ltd., 2- Captive Power Plant 12 MW Projects
Raipur 3- Pig Iron & Sinter Plant 1.80 LTPA
96 Surya Global Steel & 08.08.2008 1- Coal Washery 1.90 MTPA 3000.00 Durg Greenfield
Genpower Ltd., New 2- Sinter Plant 6.00 LTPA Projects
Delhi 3- DRI Plant 14.00 LTPA
4- Blast Furnace with PCM 6.00 LTPA
5- Steel Melting & Continuous Casting 20.00 LTPA
Shop
6- Rolling Mill 10.00 LTPA
7- Captive Power Plant 250 MW
97 Visa Steel Limited, 08.08.2008 1- Blast Furnace with Sinter 1.50 mTPA 4750.00 Raigarh Greenfield
Raipur 2- Ferro Alloys Plant 0.10 mTPA Projects
3- Coke Oven 0.40 mTPA
4- Sponge Iron Plant 1.00 mTPA
5- Coal Washery 2.00 mTPA
6- SMS & Rolling Mill 2.50 mTPA
7- Pellet Plant 1.20 mTPA
8- Captive Power Plant 500 MW
98 Maa Mahamaya 12.08.2008 1- Sponge Iron Plant 4.05 LTPA 600.00 Raigarh Greenfield
Industries Limited, 2- Steel Melting Shop 2.16 LTPA Projects
Dhamtari 3- Captive Power Plant 60 MW
4- Rolling Mill 2.00 LTPA
5- Palletizing Plant 6.00 LTPA
6- Coal Washery 1.44 LTPA
7- Ferro Alloys 0.25 LTPA
8- Pig Iron 0.90 LTPA
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 16 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
99 NMDC Limited, 03.09.2008 1- Integrated Steel Plant 3.00 mTPA 15525.00 Baster Greenfield
Hyderabad Projects
100 K. Energy Company 12.09.2008 1- Sponge Iron Plant 2.10 469.00 Korba Greenfield
Limited, Raipur 2- Induction Furnace 1.92 Projects
3- Rolling Mill 1.80
4- Captive Power Plant 60
101 Prakash Industries 12.09.2008 1- Blast Furnace 1.15 mTPA 2750.00 Janjgir Champa Greenfield
Limited, Hissar 2- Sponge Iron Plant 1.60 mTPA Projects
3- Steel Melting Shop 2.00 mTPA
4- Oxygen Plant 400 TPD
5- Duble Strand Wire Rod & Bar Mill 1.00 mTPA
102 Singhal Steels Pvt. 01.10.2008 1- Palletizing Plant 3.00 LTPA 700.00 Raigarh Greenfield
Ltd., Kolkata 2- Blast Furnace 3.00 LTPA Projects
3- Sponge Iron Plant 2.00 LTPA
4- Induction Furnace 2.59 LTPA
5- Electric Arc Furnace 3.00 LTPA
6- Captive Power Plant (WHRB) 16 MW
7- Captive Power Plant (FBC) 30 MW
8- Coal Washery 5.00 LTPA
103 MSP Steel & Power 01.10.2008 1- Sponge Iron Plant 9.00 LTPA 4930.00 Raigarh Greenfield
Ltd., Kolkata 2- Blast Fuenace (2x325 m2) 7.00 LTPA Projects
3- Steel Melting Shop 15.00 LTPA
4- HR Mill 12.00 LTPA
5- Wire Rod Mill 5.00 LTPA
6- Ferro Alloys Plant 1.50 LTPA
7- Captive Power Plant (WHRB) 108 MW
8- Captive Power Plant (AFBC) 200 MW
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 17 of 30
103 MSP Steel & Power 01.10.2008 4930.00 Raigarh Greenfield
Ltd., Kolkata Projects
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
9- Coal Washery 20.00 LTPA
10- Sintering Plant (2x30 m2) 7.50 LTPA
11- Coke Oven (Non-recovery) 5.00 LTPA
12- Palletizing Plant 15.00 LTPA
104 Mahendra Sponge & 01.10.2008 1- Sponge Iron Plant 2.70 LTPA 485.00 Durg / Greenfield
Power Pvt. Ltd., 2- Steel Billet 1.50 LTPA Rajnadgaon Projects
Raipur 3- Coal Washery 10.00 LTPA
4- Ferro Alloys Plant 0.30 LTPA
5- Captive Power Plant 40 MW
6- Pig Iron Plant 1.20 LTPA
7- Palletization & Beneficiation Plant 3.00 LTPA
8- TMT / Structural Rolling Mill 2.50 LTPA
105 Hind Energy & Coal 03.10.2008 1- Sponge Iron Plant 4.05 LTPA 505.00 Janjgir Champa Greenfield
Benificiation (India) 2- Steel Melting Shop 2.16 LTPA Projects
Pvt. Ltd., Bilaspur 3- Captive Power Plant 50 MW
4- Rolling Mill 2.00 LTPA
5- Palletization Plant 6.00 LTPA
6- Coal Washery 14.40 LTPA
106 Solar Industries 03.10.2008 1- Ammonia 5.94 LTPA 5487.00 Korba Greenfield
Limited, Nagpur 2- Di Methyl Eher (DME) 9.29 LTPA Projects
3- Captive Power Plant 70 MW
4- Coal Washery 0.14 LTPA
107 Shanti G.D. Ispat & 08.10.2008 1- Clinker 1.00 mTPA 550.00 Janjgir Champa Greenfield
Power Pvt. Ltd., 2- Cement 1.50 mTPA Projects
Raipur 3- Captive Power Plant 25 MW
108 Mars Power & Steel 05.09.2009 1- Ferro Alloys Plant 0.30 LTPA 201.00 Raigarh Greenfield
Limited, Raipur 2- Captive Power Plant 35 MW Projects
109 Sky Alloys & Power 11.09.2009 1- Induction Furnace 1.00 LTPA 270.00 Raigarh Greenfield
Pvt. Ltd., Raipur 2- Rolling Mill 1.00 LTPA Projects
3- Ferro Alloys Plant 0.30 LTPA
4- Captive Power Plant 35 MW
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 18 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
110 Lanco Solar Pvt. 24.02.2010 1- Polycrystalline Silicon 3750 TPA 4250.00 Rajnandgaon Greenfield
Ltd., Hyderabad 2- Silicon Ingots/Wafer and Modules 250 MW Projects
Equivalent
112 Rashi Strips Private 17.06.2010 1- DRI Plant with Gasification 1.00 mTPA 2200.00 Bilaspur Greenfield
Limited, New Delhi 2- Steel Melting Shop 0.90 mTPA Projects
3- Rolling Mill 0.90 mTPA
4- Ferro Alloys 0.06 mTPA
5- Coal Washery 2.40 mTPA
6- Beneficiation & Palletization of Iron 2.00 mTPA
Ore
7- Captive Power Plant 200 MW
8- Fly Ash Bricks 30 million
Nos
9- Railway Siding Infrastructure
113 Gontermann Piepers 14.06.2010 1- Pallet Plant 1.20 mTPA 270.00 South Bastar Greenfield
(India) Limited, (Dantewada) Projects
Parganas (South),
West Bemgal
114 J.K.Lakshmi Cement 28.07.2010 1- Clinker 3.00 mTPA 1000.00 Durg Greenfield
Limited, 2- Cement 3.00 mTPA Projects
Jaykaypuram, Sirohi,
3- Captive Power Plant 2x20 MW
Rajsthan
115 Indus Best Mega 19.02.2015 1- Mega Food Park 125.50 Raipur Greenfield
Food Park Pvt. Ltd. Projects
New Delhi
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 19 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
116 Shree Cement Ltd., 07.03.2015 1- Clinker 3.00 mTPA 1900.00 Baloda Bazar Greenfield
Beawar, Dist.- Ajmer 2- Cement 3.00 mTPA Projects
3- Captive Power Plant (WHR-25 MW, 50 MW
Thermal Power - 25Mw)
117 Steel Authority of 09.05.2015 1- Ultra Mega Steel Plant (3+3 or MTPA 18000.00 Jagdalpur, Greenfield
India Ltd. And 4+2) Bastar Projects
NMDC Ltd.
118 Steel Authority of 09.05.2015 1- Development of Rowghat to - 2000.00 Greenfield
India Ltd. And Jagdalpur Rail Line (Phase-II) Projects
NMDC Ltd. And
IRCON International
Ltd.
119 NMDC Limited, 09.05.2015 1- Iron Ore Processing Plant 10 mTPA 4000.00 Bastar Greenfield
Hyderabad 2- Pellet Plant 2 mTPA Projects
3- Other Associated Facilities for -
Benefication & Pellet Plant like
Water and Electic Supply And Iron
Ore concentrate pipe line
transportation
120 Steel Authority of 09.05.2015 1- Pellet Plant 1 mTPA 826.00 Balod Greenfield
India Ltd. Projects
121 BMS Starch Pvt. Ltd. 04.06.2015 1- Native Starch 30000 MT 105.00 Jagdalpur, Greenfield
2- Liquid Glucose 20000 MT Bastar Projects
3- Modified Starch 12000 MT
4- Malta Dextrin 7000 MT
5- Gluten 5000 MT
6- Germs 7000 MT
122 Kakkar Udyog Ltd. 04.06.2015 1- Corn Starch Plant for Manufacturing 120000 TPA 100.00 Dhamtari Greenfield
of Starch, Liquid Glucose, Modified Projects
Starch, Malto Dextrin, Germs,
Gluten, Fiber & Fodder etc.
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 20 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
123 Indian Agro And 04.06.2015 1- Maize Starch 180000 MT 375.00 Rajnandgaon Greenfield
Food Industries Ltd. 2- Chicken Processing Plant 90000 MT Projects
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 21 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
126 Agrizone 19.06.2015
Signing 50.00
Investment -
Distt. Greenfield
Biotechnologies Pvt. (Rs. Crore) Projects
Ltd.
1 2 3 4 5 6 7 8
2- Development of processing centers -
for Organic Vegetables, Floriculture,
Medicinal Plants, other units and
development of export facility and
International market development fir
the project, development of product
brands etc.
127 Galf Ispat Limited, 21.07.2015 1- Special Grade Alumina Project - 889.00 - Greenfield
New Delhi Projects
128 MSV Stone LLP, 05.08.2015 1- Stone Cutting and policing 120 Lac Sq.Ft. 58.80 - Greenfield
Jaipur Projects
129 Kuber Laxmi Pvt. 05.08.2015 1- Development of Defence Technogy - - Greenfield
Ltd., Singapore City Projects
130 Abis Exports India 05.08.2015 1- Poultry feed, Cattel feed, Animal 3,00,000 MT 112.00 - Greenfield
Pvt. Ltd., feed & Premix Production Unit Projects
Rajnadgaon
131 Adani Enterprises 24.08.2015 1- Urea (3,850 TPD UREA ( 1.3 - 25000.00 - Greenfield
Ltd., Hyderabad MMTPA )-PHASE I) Projects
Urea (3,850 TPD UREA ( 1.3 -
MMTPA )-PHASE II)
2- SNG 4 MMSC MD
3- Captive Power Plant 1000 MW
132 Satya Sai Agroils 24.08.2015 1- Rice Bran Solvent Extraction Plant 3,30,000 MT 200.00 - Greenfield
Pvt. Ltd., Hyderabad Projects
2- Physical Refinery and Packing Plant 66000 MT
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 22 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
133 The Brondgias, 05.11.2015 1- Solar Photovoltaics, Bio- - 60.00 - Greenfield
Delhi metric/identity Devices, Avionics, Projects
Power Supply for ESDM Products,
Electronics Manufacturing Services,
Goods Produces.
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 23 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
140 Giant Souk, Delhi 05.11.2015 (Rs.65.00
Crore) - Greenfield
Projects
1 2 3 4 5 6 7 8
2- Goods Produces on SKD / OEM / -
ODM and Export,Research &
Development such as System Design,
Parameter Design, Tolerance Design,
and Experiment Design.
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 24 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
143 Worf Technology, 05.11.2015
Signing 60.00
Investment -
Distt. Greenfield
Delhi (Rs. Crore) Projects
1 2 3 4 5 6 7 8
2- Goods Produces on SKD / OEM / -
ODM and Export, Research &
Development such as System Design,
Parameter Design, Tolerance Design,
and Experiment Design.
144 Techno World, Delhi 05.11.2015 1- Mobile Set & Accessories, Industrial - 60.00 - Greenfield
Electronics / Automotive Electronics, Projects
Medical Electronics, Nano
Electronics
2- Goods Produces on SKD / OEM / -
ODM and Export, Research &
Development such as System Design,
Parameter Design, Tolerance Design,
and Experiment Design.
145 Lanco Solar Pvt. Ltd. 23.11.2015 1- PV Cells 100 MW (Equivalent) 290.00 - Greenfield
, Hyderabad Projects
146 Ministry of Rail, 09.02.2016 1- Rail Coridor - 9711.48 - Greenfield
Govt. of India and Projects
Govt. of
Chhattisgarh (JV)
[49 : 51]
147 Asia Pacific 6-12 April, 1- Rooftop Solar & Solar Power Plant - 3900.00 - Greenfield
Generation Limited, 2016 Project Projects
China (Proposed Investment - 600 Million
USD) @65/-
148 China Henan 6-12 April, 1- Electric Vehicles Production Line - 3250.00 - Greenfield
Bumper of New 2016 (Proposed Investment - 500 Million Projects
Energy Vehicles Co. USD)
Ltd., China
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 25 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
149 Guangzhou Iuan 6-12 April, 1- Security Cameras & Digital & - 325.00 - Greenfield
Optical & Electrical 2016 Network Video Projects
Tech Joint Stock Co. (Proposed Investment - 50 Million
Ltd., China USD)
150 Hong Kong Jinyuan 6-12 April, 1- Jinyuan Cement Plant - 6500.00 - Greenfield
International 2016 (Proposed Investment - 1000 Million Projects
Development Ltd., USD)
China
151 Kootion Technology 6-12 April, 1- USB Flash Drive Mfg. - 325.00 - Greenfield
Co. Ltd., China 2016 (Proposed Investment - 50 Million Projects
USD)
152 Risen Energy Co. 6-12 April, 1- Solar Photovoltaic Projects - 650.00 - Greenfield
Ltd., China 2016 (Proposed Investment - 100 Million Projects
USD)
153 Shenzhen Fluence 6-12 April, 1- LED Lights for Housing - 650.00 - Greenfield
Technology PLC, 2016 (Proposed Investment - 100 Million Projects
China USD)
154 Arctech Solar 6-12 April, 1- Production of Module Mounting - 2600.00 - Greenfield
Holding Co. Ltd., 2016 Structure & Solar Tracker Projects
China (Proposed Investment - 400 Million
USD)
155 Chongquing 6-12 April, 1- Railway Wagon Factory - 130.00 - Greenfield
Changzheng Heavy 2016 (Proposed Investment - 20 Million Projects
Industry Co. Ltd., USD)
China
156 Metech Inc., China 6-12 April, 1- Fly ash lightweigt Aggregate Plant - 162.50 - Greenfield
2016 (Proposed Investment - 25 Million Projects
USD)
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 26 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
157 Zhongli Talesun 6-12 April, 1- Renewables/Solar Module Mfg. - 3250.00 - Greenfield
Solar Co. Ltd., China 2016 (Proposed Investment - 500 Million Projects
USD)
158 Asquare Food and 04.05.2016 1- Grinding and Processing of Spices - 25.30 Raipur Greenfield
Beverage Private Projects
Limited, Raipur
159 C.G. Coal and Power 04.05.2016 1- Coal Washery 2x2 mTPA 60.00 Korba Greenfield
Limited, Raipur Projects
160 Ligaro Electronics 04.05.2016 1- LED Electronics Manufacturing Unit - 18.00 Naya Raipur Greenfield
Technologies Private Projects
Limited, Raipur
161 SDSL Electronics 04.05.2016 1- LED Bulb, Tube Lights, Panels, - 24.00 Naya Raipur Greenfield
Private Limited, New Street Lights and Flood Lights. Projects
Delhi
162 Tirumala Balaji 04.05.2016 1- Manufacturing of SGCI Inserts - 20.00 - Greenfield
Smelters Private 2- Manufacturing of Elastic Rail Clip - Projects
Limited, Kolkata
163 APL Apollo Tubes 04.05.2016 1- Galvanised and Pre-Galvanizsd Steel 60000 MT 75.00 Raipur Greenfield
Limited Tubes, Hollow Sections & Projects
Galvanised Sheets
164 Beesons, Raipur 04.05.2016 1- LED Bulb, Multimedia Speakers, - 14.00 Naya Raipur Greenfield
Mobile Handsets, LED & LCD TV. Projects
165 Bharat Petroleum 07.05.2016 1- LPG Bottling Plant - 74.00 Raipur Greenfield
Corporation Limited, Projects
Mumbai
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 27 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
166 R.R. Ispat (A unit of 12.09.2016 1- Galvanizing Plant - 25.00 Raipur Greenfield
Godawari Power & a. Fabrication & Galvanizing of TLT 80000 TPA Projects
Ispat Limited), b. Galvanizing Wire of TLT 30000 TPA
Raipur 2- Annealing & Winding of Wires 30000 TPA
3- Semi Finished Iron Powder Plant 10000 TPA
4- Semi Finished Copper Powder Plant 5000 TPA
167 Lanco Solar Energy 12.09.2016 1- Solar PV Cells and Module 630 MW Equivalent 1435.70 Rajnadgaon Greenfield
Private Limited, Each Projects
Hyderabad and 2
other foreign
companies
168 Neco Industries 12.09.2016 1- Cement 3 mTPA 1832.00 Baloda Bazar Greenfield
Limited, Nagpur 2- Captive Power Plant 60 MW Projects
169 Osheen Electronics 12.09.2016 1- LED Bulbs, Tube Lights, Panels, - 29.00 Naya Raipur Greenfield
Private Limited, Street Lights Projects
Raipur
170 Ranju Infracon 12.09.2016 1- Coal Washery 60 LTPA 80.00 Raigarh Greenfield
Private Limited, 2- Railway Siding Projects
Raigarh
171 Agamen 06.10.2016 1- ESDM - 195.00 - Greenfield
Microelectronics Inc. (Proposed Investment - 30 Million Projects
, Taiwan USD)
172 Golden Point 07.10.2016 1- ESDM - 325.00 - Greenfield
Technology, Taiwan (Proposed Investment - 50 Million Projects
USD)
173 Guizhou Maritime 14.12.2016 1- Integrated Infrastructure Project in - - Greenfield
International Chhattisgarh Projects
Investment
Corporation, China
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 28 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
174 Hindustan Petroleum 03.01.2017 1- POL Depot - 324.00 Janjgir Champa Greenfield
Corporation Limited, Projects
Mumbai
175 Millanium Infratech 03.01.2017 1- LED Lights - 11.00 Naya Raipur Greenfield
Private Limited, Projects
Raipur
176 Sung Ha Telecom 30.05.2017 1- Mobile phone production - 130.00 - Greenfield
Co. Ltd., Koria Proposed Investment - 20000000 Projects
USD
177 Arkas Biocon Private 10.07.2017 1- Starch and It's Derivatives Plant 200 TPD 100.22 - Greenfield
Limited, New Delhi Projects
178 Smartron India 10.07.2017 1- Mobile Manufacturing Unit 200000 Nos 100.00 Naya Raipur Greenfield
Private Limited, Projects
Hyderabad
179 Forstar Techno 10.07.2017 1- Tablet PC 6000000 Nos 170.00 Naya Raipur Greenfield
Solution Private 2- Smart Phone 12000000 Nos Projects
Limited, Naya 3- Desktop Computer 700000 Nos
Raipur 4- POS Machine 2500000 Nos
5- Biometric Devices 2000000 Nos
180 Wattson Electronics, 10.07.2017 1- BLDC Fan 3750 Nos 16.15 Naya Raipur Greenfield
Bangalore 2- BLDC Air Cooler 3750 Nos Projects
3- OTG Computer 5000 Nos
4- Home Automation Product 3750 Nos
5- Industrial Product 5000 Nos
6- Smart Energy Meter 3700 Nos
181 Patanjali Ayurved 24.12.2017 1- Food Processing, Fruit and Vegetable - 570.50 - Greenfield
Limited, New Delhi Processing and Non Timber Forest Projects
Produce Processing
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 29 of 30
S.No. Name of unit Date of Name of Products Annual Capacity Proposed Proposed Remarks
Signing Investment Distt.
(Rs. Crore)
1 2 3 4 5 6 7 8
182 Manorama Industries 24.12.2017 1- Mfg. of Vegetable Oil & Fats 50000 Ton 57.00 - Greenfield
Private Limited, Projects
Mumbai
183 Aakriti Super Snacks 24.12.2017 1- Bread and Biscuits - 15.80 - Brownfield
Private Limited, Projects
Raipur
184 Winsor Essex 10.06.2019 1- Cluster Development in Chhattisgarh - - - Greenfield
Economic and Facilitate Technology Tie-ups Projects
Development Corpn. and business collaboration between
And Canadian companies having opration in
Association of Mold Windsor and Chhattisgarh
Maker, Windsor,
Canada
185 Windsor Essex 10.06.2019 1- Agriculture and Food Processing and - - - Greenfield
Regiomal Chember Related Technology, Trade and Projects
of Commerce, Investment
Windsor, Canada
186 Shree Cement Ltd., 23.09.2019 1- Clinker 8.3 mTPA 2000.00 - Both
Beawar, Dist.- Ajmer 2- Cement 13.5 mTPA Brownfield
3- Captive Power Plant 170 MW & Greenfield
Projects
187 R.R. Ispat, Unit-2, 23.09.2019 1- Manufacturing of Other Fabricated 100000 TPA 19.85 - Greenfield
(A unit of Godawari Metal Products Projects
Power & Ispat
Limited), Raipur
TOTAL 269676.89
SIPB2\MoU\MOU_List_English\Live_(03-04-2018) Page 30 of 30