PEMELIHARAAN RUTIN PLTD SELAYAR NO DOK :

WEEK-33 (14 - 18 AGUSTUS 2023) REV :

PIP UPDK TELLO

NO WORK ORDER NUMBER DESCRIPTION WORK TYPE DUE DATE LABOR JUMLAH LABOR DURASI TOTAL FEEDBACK

PM PLTD SELAYAR

HME

1 SL02-PM-RTN-HME-MJA-AV001 PEMELIHARAAN P1 [DEUTZ 2] CYLINDER HEAD 01-08 HME 15 August 2023 Marwan, Ilyas, Mannimbangi 3 01:00 03:00

2 HME 15 August 2023 Marwan, Mannimbangi, Nurwahidin 3 01:00 03:00


SL02-PM-RTN-HME-MJG-AP001 PEMELIHARAAN P1 [DEUTZ 2] POMPA & MOTOR JACKET - INTERCOOLING WATER
3 SL02-PM-RTN-HME-MJN-AT001 PEMELIHARAAN P1 [DEUTZ 2] FUEL DUPLEX HME 15 August 2023 Marwan, Nurwahidin, Wahab 3 01:00 03:00
4 SL02-PM-RTN-HME-MJP-AA001 HME DUTCHWORK
PEMELIHARAAN P1 [DEUTZ 2] START MASTER VALVE, DISTRIBUTOR, COMPRESSED TANK, 15 August 2023 Marwan, Wahab, Ilyas 3 01:00 03:00
5 SL02-PM-RTN-HME-MJV-AP001 PEMELIHARAAN P1 [DEUTZ 2] PRIMING PUMP & OIL FILTER HME 15 August 2023 Marwan, Ilyas, Mannimbangi 3 01:00 03:00
6 SL02-PM-RTN-HME-PCA-AC001 PEMELIHARAAN P1 [DEUTZ 2] ELEKTROMOTOR RADIATOR DEUTZ #2 HME 15 August 2023 Marwan, Mannimbangi, Nurwahidin 3 01:00 03:00
MAN HOUR REQUARED 120:00 3:00

MAN HOUR AVAILABLE 200


% LOAD BALANCE 60,00%
HLI
1 SL02-PM-RTN-HLI-BAC-GS002 PEMELIHARAAN P1 [DEUTZ 2] VACUM CIRCUIT BREAKER HLI 15 August 2023 Fachrul, Engga 2 01:00 02:00
2 SL02-PM-RTN-HLI-BAT-AH001 HLI
PEMELIHARAAN P1 [DEUTZ 2] HEATING, STORAGE EQUIPMENT, TRANFORMER, ISOLATING LV & HV 15 August 2023 Fachrul, Engga 2 01:00 02:00
3 SL02-PM-RTN-HLI-BBT-GD001 PEMELIHARAAN P1 [DEUTZ 2] EQUPMENT 6,3 KV HV & LV, STATION SERVICE TRAFO HLI 15 August 2023 Fachrul, Engga 2 01:00 02:00
MAN HOUR REQUARED 66:00 4:24

MAN HOUR AVAILABLE 120


% UTILITY 55%
PEMELIHARAAN RUTIN PLTG TELLO NO DOK :

WEEK-33 (14 - 18 AGUSTUS 2023) REV :

PIP UPDK TELLO

NO PM NUMBER WORK ORDER NUMBER DESCRIPTION WORK TYPE DUE DATE LABOR JUMLAH LABOR DURASI TOTAL

HME
GT01-PM-RTN-HME-MBX-AA001
3 202313540 PM GT01 PENGECEKAN VISUAL HYDRAULIC MANIFOLD AUX, VCK3 DAN VAB2 HME 15/08/23 Asmar, Burhanudin 2 01:30 03:00
GT01-PM-RTN-HME-MBV-BR008
4 202313539 PM GT01 PENGECEKAN VISUAL PIPING EVAC PUMP HME 15/08/23 Asmar, Burhanudin 2 01:30 03:00
MAN HOUR REQUARED 24:00
MAN HOUR AVAILABLE 80
% UTILITY 30%

NO PM NUMBER WORK ORDER NUMBER DESCRIPTION WORK TYPE DUE DATE LABOR JUMLAH LABOR DURASI TOTAL

HKI & HLI

7 GT01-PM-RTN-HKI-MBV-AP001 202313587 PM GT01 PENGECEKAN INSTRUMENT DAN CONTROL LUBE QV A HLI-GT 15/08/23 Ahmad, Rahmanda 2 01:00 02:00
8 GT01-PM-RTN-HKI-MBV-BB001 202313588 PM GT01 PENGECEKAN INSTRUMENT DAN CONTROL LEVEL ALARM LH-2 & LEVEL ALARM
HLI-GTQH-1 RESERVOIR TANK
15/08/23 Ahmad, Rahmanda 2 01:00 02:00
9 GT01-PM-RTN-HKI-MBN-BR013 202313583 PM GT01 PENGECEKAN INSTRUMENT DAN CONTROL PRESSURE FUEL FORWADING PIPING
HLI-GT SYSTEM 15/08/23 Ahmad, Rahmanda 2 01:00 02:00
10 GT01-PM-RTN-HLI-MBX-AP001 202313461 PM GT01 PENGECEKAN KELISTRIKAN & SPACE HEATER HYDRAULIC SUPPLY MOTOR-88HQ
HLI-GT 15/08/23 Ahmad, Rahmanda 2 01:00 02:00
11 GT01-PM-RTN-HLI-PGA-AN001 202313462 PM GT01 PENGECEKAN KELISTRIKAN MOTOR FAN 88 FC 1 & 2 HLI-GT 15/08/23 Ahmad, Rahmanda 2 01:00 02:00
12 GT01-PM-RTN-HKI-MBR-GH004 202313586 PM GT01 PENGECEKAN INSTRUMENT DAN CONTROL PRESSURE GENERATOR AIR INLET FILTER
HLI-GT - SELF CLEANING15/08/23
SEQUANCER (34GF-1) Ahmad, Rahmanda 2 01:00 02:00

MAN HOUR REQUARED 40:00


MAN HOUR AVAILABLE 80
% UTILITY 50%
PEMELIHARAAN RUTIN PLTD TELLO NO DOK :

WEEK-33 (14 - 18 AGUSTUS 2023) REV :

PIP UPDK TELLO

NO WORK ORDER NUMBER DESCRIPTION WORK TYPE DUE DATE LABOR JUMLAH LABOR DURASI TOTAL

HLI

6 DT02-PM-RTN-HLI-BBT-GH002 202313748 PEMELIHARAAN P1 PMT TRAFO PS MHI 2 MHI 2 HLI 15 August 2023 Kafrawi, Jabbar 2 02:00 04:00
7 DT02-PM-RTN-HLI-MJY-GH010 202313749 PEMELIHARAAN P1 PRESSURE TRANSMITTER MHI 2 MHI 2 HLI 15 August 2023 Kafrawi, Jabbar 2 02:00 04:00
8 DT02-PM-RTN-HLI-MKA-HA001 202313750 PEMELIHARAAN P1 FRAME MHI 2 MHI 2 HLI 15 August 2023 Kafrawi, Jabbar 2 02:00 04:00
MAN HOUR REQUARED 44:00
MAN HOUR AVAILABLE 80
% UTILITY 55%

HME

7 DT02-PM-RTN-HME-MJG-AH001 202313751 PEMELIHARAAN P1 PRIMARY COOLING WATER PUMP A MHI 2 MHI 2 HME 15 August 2023 Azwar, Ilham 2 01:00 02:00
8 DT02-PM-RTN-HME-MJG-AH022 202313752 PEMELIHARAAN P1 RADIATOR EQUIPMENT MHI 2 MHI 2 HME 15 August 2023 Azwar, Ilham 2 01:00 02:00
9 DT02-PM-RTN-HME-MJN-AP004 202313753 PEMELIHARAAN P1 HSD OIL TRANSFER PUMP MHI 2 MHI 2 HME 15 August 2023 Azwar, Ilham 2 01:00 02:00
10 DT02-PM-RTN-HME-MJN-AS002 202313754 PEMELIHARAAN P1 GOVERNOR MHI 2 MHI 2 HME 15 August 2023 Azwar, Ilham 2 01:00 02:00
11 DT02-PM-RTN-HME-MJV-AP001 202313755 PEMELIHARAAN P1 LUBE OIL PRIMMING PUMP MHI 2 MHI 2 HME 15 August 2023 Azwar, Ilham 2 01:00 02:00
MAN HOUR REQUARED 50:00
MAN HOUR AVAILABLE 80
% UTILITY 63%