KARUNIA ARMADA INDONESIA


INDONESIA PRATAMA MINING COAL PROJECT
PLANT DEPARTMENT DAILY PLAN SERVICE
PLAN SERVICE, GREASING AND INSPECTION ALL UNIT
11 April 2023
Tuesday, 11 April 2023
UNIT BIG MACHINE 12-Apr-23 SERVICE Tabang,

HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE


No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
KM
HM SERVICE ACTUAL START FINISH START FINISH

BS, + PPE + PAP + INSPECTION


BACKLOG
1 HD777D HDCT037 53250 53333 33 PIT FSP PS 1 = 2 H 08:20 08:50 08:50 16:50 KAI MRIPT23030965
> BACKLOG - P2 GAUGE GP COOLANT (ETA 13 MARET 2023 REQ BY ROHMAD) > MRIPT23030212
> BACKLOG P2 PUMP DRIVE LEAKS ETA 20 MARET 2023 (REG BY ROHMAD AFTER INSPECTION) >MRIPT23030388

BS, + PPE + PAP + INSPECTION


2 ZX870LCH-5G EXHT005 13000 13070 20 PIT FSP PS 3 = 6 H 09:00 09:30 09:30 17:30 KAI MRIPT23040021 FOLLOW UP PAP
> RIGHT FINAL DRIVE RATING B PQ (120)

3 HD777 HDCT070 1000 1047 -3 PIT FSP PS 3 = 6 H 06:00 06:30 06:30 14:30 KAI MRIPT23040163 BS, + PPE + PAP + INSPECTION + BACKLOG WELDING DUMP BODY TEAM TU

4 HD777D HDCT033 58750 58793 -7 PIT FSP PS 1 = 2 H 07:00 07:30 07:30 15:30 KAI MRIPT23030459 BS, + PPE + PAP + INSPECTION

5 HD777E HDCT059 5750 5791 -9 PIT FSP PS 1 = 2 H 07:00 07:30 07:30 15:30 KAI MRIPT23040075 BS, + PPE + PAP + INSPECTION

6 PC2000-8 EXKM069 7000 7036 -14 PIT FSP PS 3 = 6 H 07:25 07:55 07:55 15:55 KAI MRIPT23040026 BS, + PPE + PAP + INSPECTION

7 XDE130 HDXC075 1000 1033 -17 PIT FSP PS 3 = 6 H 09:00 09:30 09:30 17:30 KAI MRIPT23040024 BS, + PPE + PAP + INSPECTION

BS, + PPE + PAP + INSPECTION


8 HD785-7 HDKM050 24250 24278 -22 PIT FSP PS 1 = 2 H 09:15 09:45 09:45 17:45 KAI MRIPT23040039 BACKLOG
>BACKLOG - P2 CORE RADIATOR NO.2 LEAKS (ETA 19 FEBRUARI 2023 REQ BY ROHMAD) >MRIPT23020422

UNIT AUXILIARY A2B

HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE


No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
KM
HM SERVICE ACTUAL START FINISH START FINISH

1 SRC600C RCSN002 1500 1521 -29 PIT FSP PS 2 = 4 H 06:10 06:40 06:40 14:40 KAI MRIPT23020084 BS, + PPE + PAP + INSPECTION

2 XE370C EXXC017 4250 4264 -36 PIT FSP PS 1 = 2 H 06:00 06:30 06:30 14:30 KAI MRIPT23040145 BS, + PPE + PAP + INSPECTION fuel filter

BS, + PPE + PAP + INSPECTION


3 320D2 EXCT003 15000 14935 0 PIT FSP PS 3 = 6 H 07:25 07:55 07:55 15:55 KAI MRIPT23040286 BACKLOG
> SWING BEARING > MRIPT23010541 (HOLD)

4 D375A-6R BDKM017 26250 26211 0 PIT FSP PS 1 = 2 H 09:00 09:30 09:30 17:30 KAI MRIPT23040224 BS, + PPE + PAP + INSPECTION

UNIT AUXILIARY NON A2B

HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE


No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
KM
HM SERVICE ACTUAL START FINISH START FINISH
1 MLT-X 845-120 MNT001 4750 4801 1 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23030923 BS, + PPE + PAP + INSPECTION

2 SK200-150-400 GS003 12750 12800 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040161 BS, + PPE + PAP + INSPECTION

3 FMX400 STVV009 500 500 0 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040108 BS, + PPE + PAP + INSPECTION

4 FMX440 FTVV011 2000 2023 -27 PIT FSP PS 4 = 8 H 10:00 10:30 10:30 18:30 KAI MRIPT23040296 BS, + PPE + PAP + INSPECTION

5 OH 1526 BUS016 750 771 -29 WS TAPAK PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23030716 BS, + PPE + PAP + INSPECTION

2 FD280 WTFW016 750 768 -32 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040071 BS, + PPE + PAP + INSPECTION

UNIT COAL TRANSPORT


HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE
No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
KM
HM SERVICE ACTUAL START FINISH START FINISH

1 XG5902D3T DTXC020 1500 1647 97 AIR STRIP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23030721 BS, + PPE + PAP + INSPECTION

2 SANYSKT90S DTSN011 3000 3118 68 AIR STRIP PS 3 = 6 H 14:00 14:30 14:30 22:30 KAI MRIPT23030318 BS, + PPE + PAP + INSPECTION

3 R580LA 6X4 ESZ PMSC028 30000 29988 0 AIR STRIP PS 4 = 8 H 10:00 10:30 10:30 18:30 KAI MRIPT23040314 BS, + PPE + PAP + INSPECTION

4 SKT90S DTSN012 2500 2404 0 AIR STRIP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040314 BS, + PPE + PAP + INSPECTION

12-Apr-23 GREASING INSPECTION


No MODEL UNIT C/N UNIT HM REMAIN HM / LOCATION PS ESTIMATE WASHING ESTIMATE SERVICE REMAKS
GI
HM SERVICE ACTUAL KM START FINISH START FINISH
1 R580LA 6X4 ESZ PMSC028 - GI - - - - KAI - Greasing Inspection

2 FM440 WTVV009 - GI - - - - KAI - Greasing Inspection

3 FMX400 STVV010 - GI - - - - KAI - Greasing Inspection

4 FE84G BUS017 - GI - - - - KAI - Greasing Inspection

5 MLT-X 845-120 MNT001 - GI - - - - KAI - Greasing Inspection

6 ADI224G14 GS003 - GI - - - - KAI - Greasing Inspection

7 FMX400 STVV009 - GI - - - - KAI - Greasing Inspection

8 FMX440 FTVV011 - GI - - - - KAI - Greasing Inspection

9 OH 1526 BUS016 - GI - - - - KAI - Greasing Inspection

10 FD280 WTFW016 - GI - - - - KAI - Greasing Inspection

UNIT A2B
12-Apr-23 WASHING
HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE
No MODEL UNIT C/N UNIT LOCATION PS WS REMAKS
HM SERVICE ACTUAL KM START FINISH START FINISH
1 ZX870LCH-5G EXHT002 - WS - - - - KAI - Washing (COAL GETTING)

2 ZX870LCH-5G EXHT003 - WS - - - - KAI - Washing (COAL GETTING)

3 ZX870LCH-5G EXHT005 - WS - - - - KAI - Washing (COAL GETTING)

4 R9100 EXLB001 - WS - - - - KAI - Washing (COAL GETTING)

5 R9100 EXLB005 - WS - - - - KAI - Washing (COAL GETTING)

6 HD777D HDCT037 - WS - - - - KAI - Washing

7 GR3005T GDXC016 - WS - - - - KAI - Washing

8 HD777 HDCT070 - WS - - - - KAI - Washing

9 HD777E HDCT059 - WS - - - - KAI - Washing

10 PC2000-8 EXKM069 - WS - - - - KAI - Washing

11 XDE130 HDXC075 - WS - - - - KAI - Washing

12 HD785-7 HDKM050 - WS - - - - KAI - Washing

13 SRC600C RCSN002 - WS - - - - KAI - Washing

14 XE370C EXXC017 - WS - - - - KAI - Washing

15 320D2 EXCT003 - WS - - - - KAI - Washing

12-Apr-23 CLEANING TRACK


HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE
No MODEL UNIT C/N UNIT LOCATION PS CT REMAKS
KM
HM SERVICE ACTUAL START FINISH START FINISH
1 ZX870LCH-5G EXHT005 - CT - - - - KAI - CLEANING TRACK

2 PC2000-8 EXKM069 - CT - - - - KAI - CLEANING TRACK

3 HD785-7 HDKM050 - CT - - - - KAI - CLEANING TRACK

4 XE370C EXXC017 - CT - - - - KAI - CLEANING TRACK

5 320D2 EXCT003 - CT - - - - KAI - CLEANING TRACK

12-Apr-23 PRE INSPECTION


HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE
No MODEL UNIT C/N UNIT LOCATION PS IP REMAKS
KM
HM SERVICE ACTUAL START FINISH START FINISH
1 D85ESS-2 BDKM075 5750 5679 -71 PIT FSP IP - - - - KAI - Pre inspection

2 DH24B2 XL BDSA019 2250 2180 -70 PIT FSP IP - - - - KAI - Pre inspection

3 D85ESS-2 BDKM059 10750 10674 -76 PIT FSP IP - - - - KAI - Pre inspection

4 D375A-6R BDKM078 6250 6176 -74 PIT FSP IP - - - - KAI - Pre inspection

UNIT BIG MACHINE 13-Apr-23 SERVICE


HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE
No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
KM
HM SERVICE ACTUAL START FINISH START FINISH
1 ZX870LCH-5G EXHT003 23000 23034 -16 PIT FSP PS 3 = 6 H 10:00 10:30 10:30 18:30 KAI MRIPT23040169 BS, + PPE + PAP + INSPECTION

2 HD777D HDCT031 53500 53525 -25 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040175 BS, + PPE + PAP + INSPECTION

3 HD785-7 HDKM053 23500 23525 -25 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040171 BS, + PPE + PAP + INSPECTION

4 XDR80T DTXC065 2250 2267 -33 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040114 BS, + PPE + PAP + INSPECTION

5 HD785-7 HDKM058 7000 7016 -34 PIT FSP PS 3 = 6 H 10:00 10:30 10:30 18:30 KAI MRIPT23040220 BS, + PPE + PAP + INSPECTION

6 XDR80T DTXC066 2750 2765 -35 AIR STRIP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040116 BS, + PPE + PAP + INSPECTION

7 HD777D HDCT038 53000 53014 -36 PIT FSP PS 3 = 6 H 10:00 10:30 10:30 18:30 KAI MRIPT23040081 BS, + PPE + PAP + INSPECTION

8 HD777E HDCT066 3500 3515 -35 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040230 BS, + PPE + PAP + INSPECTION

9 XE800D EXXC053 2500 2512 -38 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040165 BS, + PPE + PAP + INSPECTION

10 XDR80T DTXC062 2250 2261 -39 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040259 BS, + PPE + PAP + INSPECTION

11 XDR80T DTXC038 3000 3009 -41 FPS PS 3 = 6 H 14:00 14:30 14:30 22:30 KAI MRIPT23030866 BS, + PPE + PAP + INSPECTION
UNIT AUXILIARY A2B
HM
REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE
No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
KM
HM SERVICE ACTUAL START FINISH START FINISH

1 GR3005T GDXC016 4500 4488 0 PIT FSP PS 2 = 4 H 09:20 09:50 09:50 17:50 KAI MRIPT23030448 BS, + PPE + PAP + INSPECTION

2 D85ESS-2 BDKM069 2500 2452 0 PIT FSP PS 2 = 4 H 07:28 07:58 07:58 15:58 KAI MRIPT23040257 BS, + PPE + PAP + INSPECTION

3 LIEBHERR PR776 BDLB001 3500 3486 0 PIT FSP PS 2 = 4 H 09:00 09:30 09:30 17:30 KAI MRIPT23040263 BS, + PPE + PAP + INSPECTION

4 DX225LCA EXDS056 9000 8908 0 PIT FSP PS 3 = 6 H 10:00 10:30 10:30 18:30 KAI MRIPT23040045 BS, + PPE + PAP + INSPECTION

5 XS113T VBXC009 2000 1948 0 PIT FSP PS 4 = 8 H 10:00 10:30 10:30 18:30 KAI MRIPT23030956 BS, + PPE + PAP + INSPECTION

6 D85ESS-2 BDKM076 4000 3984 0 PIT FSP PS 4 = 8 H 09:00 09:30 09:30 17:30 KAI MRIPT23040260 BS, + PPE + PAP + INSPECTION

7 D8R BDCT001 16000 15993 0 PIT FSP PS 4 = 8 H 09:00 09:30 09:30 17:30 KAI MRIPT23040223 BS, + PPE + PAP + INSPECTION

BS, + PPE + PAP + INSPECTION


8 DX500LCA EXDS018 21250 21246 0 PIT FSP PS 1 = 2 H 09:00 09:30 09:30 17:30 KAI MRIPT23030688
BREAKDOWN

UNIT AUXILIARY NON A2B

HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE


No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
KM
HM SERVICE ACTUAL START FINISH START FINISH

1 Hilight V4 TLAC005 3250 3264 -36 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23031003 BS, + PPE + PAP + INSPECTION

2 FRAND DIESEL 15 KVA MTL030 1500 1508 -42 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040225 BS, + PPE + PAP + INSPECTION

3 PP128S22L71-EG114 MPPN007 12250 12222 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040159 BS, + PPE + PAP + INSPECTION

4 FE74HD K (4x2) M/T TS003 250 228 0 WS TAPAK PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23030178 BS, + PPE + PAP + INSPECTION

5 PP128S22L71-EG114 MPPN015 500 485 0 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040160 BS, + PPE + PAP + INSPECTION

6 FRAND DIESEL 15 KVA MTL031 1750 1719 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040291 BS, + PPE + PAP + INSPECTION

7 FMX400 STVV010 500 481 0 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040255 BS, + PPE + PAP + INSPECTION

UNIT COAL TRANSPORT

HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE


No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
KM
HM SERVICE ACTUAL START FINISH START FINISH

1 XCMGXG5902D3T DTXC027 1750 1749 0 AIR STRIP PS 1 = 2 H 14:00 14:30 14:30 22:30 KAI MRIPT23030273 BS, + PPE + PAP + INSPECTION

BS, + PPE + PAP + INSPECTION


2 P410 CB 8X4EHZ DTSC047 29750 29748 0 AIR STRIP PS 1 = 2 H 14:00 14:30 14:30 22:30 KAI MRIPH23030125
UNIT BD

UNIT BIG MACHINE 14-Apr-23 SERVICE


HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE
No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
HM SERVICE ACTUAL KM START FINISH START FINISH

1 HD777 HDCT072 1000 1006 -44 PIT FSP PS 3 = 6 H 10:00 10:30 10:30 18:30 KAI MRIPT23040214 BS, + PPE + PAP + INSPECTION

2 HDCAT-773 HDCT050 12250 12253 -47 PIT FSP PS 1 = 2 H 07:45 08:15 08:15 16:15 KAI BS, + PPE + PAP + INSPECTION

BS, + PPE + PAP + INSPECTION


BACKLOG
3 HD777D HDCT036 57000 57001 -49 PIT FSP PS 3 = 6 H 10:00 10:30 10:30 18:30 KAI MRIPT23030667 >PLANT REPAIR P1 SENSOR DUMP BODY ABNORMAL (LOW) ETA 24 MARET 2023 (REG BY MEC TU/ONI)
>MRIPT23030709
UNIT BREAKDOWN

4 XDE130 HDXC081 500 498 0 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040173 BS, + PPE + PAP + INSPECTION

5 XDR100 HDXC068 2250 2246 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040232 BS, + PPE + PAP + INSPECTION

6 HD777E HDCT057 6250 6239 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT32040299 BS, + PPE + PAP + INSPECTION

7 HD785-7 HDKM063 5250 5223 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040289 BS, + PPE + PAP + INSPECTION

8 XE2000 EXXC055 3000 2997 0 PIT FSP PS 3 = 6 H 10:00 10:30 10:30 18:30 KAI MRIPT23040167 BS, + PPE + PAP + INSPECTION

9 XE370C EXXC032 4750 4736 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040287 BS, + PPE + PAP + INSPECTION

10 HD777E HDCT063 3500 3496 0 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040215 BS, + PPE + PAP + INSPECTION

11 XDR80T DTXC052 2500 2484 0 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040174 BS, + PPE + PAP + INSPECTION

UNIT AUXILIARY A2B

HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE


No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
KM
HM SERVICE ACTUAL START FINISH START FINISH
BS, + PPE + PAP + INSPECTION
BACKLOG
MRIPT23030864 >FUEL SYSTEM LEAKING ( P1-ETA 31/10/2022 ) >MRIPT22100666
1 PC200-8MO EXKM066 7750 7711 0 PIT FSP PS 1 = 2 H 07:00 07:30 07:30 15:30 KAI
>PPC LOCK & SWING BRAKE M
ULFUNCTION ETA 20 OCT 2022 (AFTER INSPECTION) >MRIPT22100256
UNIT BD

2 XDR80T DTXC052 2500 2484 0 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040282 BS, + PPE + PAP + INSPECTION

3 HD777 HDCT075 1000 983 0 PIT FSP PS 3 = 6 H 10:00 10:30 10:30 18:30 KAI MRIPT23040283 BS, + PPE + PAP + INSPECTION

4 D85ESS-2 BDKM026 17750 17673 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23030937 BS, + PPE + PAP + INSPECTION

5 D8GC BDCT006 3000 2962 0 PIT FSP PS 3 = 6 H 09:00 09:30 09:30 17:30 KAI MRIPT32040300 BS, + PPE + PAP + INSPECTION

BS, + PPE + PAP + INSPECTION


6 G 14M GDCT002 21750 21659 0 PIT FSP PS 1 = 2 H 09:00 09:30 09:30 17:30 KAI MRIPT23030531
UNIT BD

UNIT AUXILIARY NON A2B


HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE
No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
KM
HM SERVICE ACTUAL START FINISH START FINISH

1 Hilight V4 TLAC003 1000 979 0 PIT FSP PS 3 = 6 H 10:00 10:30 10:30 18:30 KAI MRIPT23040226 BS, + PPE + PAP + INSPECTION

2 FMX400 FTVV010 5500 5470 0 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040290 BS, + PPE + PAP + INSPECTION

3 FMX440 FTVV012 1000 955 0 PIT FSP PS 3 = 6 H 10:00 10:30 10:30 18:30 KAI MRIPT23040329 BS, + PPE + PAP + INSPECTION

4 LSA491S45C6S/4 GSMN003 9500 9448 0 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040330 BS, + PPE + PAP + INSPECTION

5 FRAND DIESEL 15 KVA MTL025 2000 1922 0 PIT FSP PS 4 = 8 H 10:00 10:30 10:30 18:30 KAI MRIPT23030412 BS, + PPE + PAP + INSPECTION

6 FRAND DIESEL 15 KVA MTL026 2250 2199 0 FPS PS 1 = 2 H 09:00 09:30 09:30 17:30 KAI MRIPT23030092 BS, + PPE + PAP + INSPECTION

7 CWB45 ALDN WTNS005 20250 20144 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23030757 BS, + PPE + PAP + INSPECTION

UNIT COAL TRANSPORT


HM ESTIMATE WASHING ESTIMATE SERVICE
REMAIN HM /
No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
KM
HM SERVICE ACTUAL START FINISH START FINISH

1 SKT90S DTSN017 2000 1956 0 PIT FSP PS 4 = 8 H 10:00 10:30 10:30 18:30 KAI MRIPT23040253 BS, + PPE + PAP + INSPECTION

2 XG5902D3T DTXC019 2250 2228 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040254 BS, + PPE + PAP + INSPECTION

UNIT BIG MACHINE 15-Apr-23 SERVICE


HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE
No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
KM
HM SERVICE ACTUAL START FINISH START FINISH

1 XDR80T DTXC050 2750 2678 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040281 BS, + PPE + PAP + INSPECTION

2 XDR80T DTXC050 2750 2678 0 AIR STRIP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040217 BS, + PPE + PAP + INSPECTION

3 XDR80T DTXC053 2500 2473 0 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI MRIPT23040212 BS, + PPE + PAP + INSPECTION

4 PC2000-8 EXKM039 22000 21965 0 PIT FSP PS 4 = 8 H 10:00 10:30 10:30 18:30 KAI MRIPT23040285 BS, + PPE + PAP + INSPECTION

5 XDR100 HDXC070 2000 1964 0 PIT FSP PS 4 = 8 H 10:00 10:30 10:30 18:30 KAI MRIPT23040288 BS, + PPE + PAP + INSPECTION

6 XDR80T DTXC063 2500 2393 0 PIT FSP PS 2 = 4 H 07:00 07:30 07:30 15:30 KAI MRIPT23020058 BS, + PPE + PAP + INSPECTION

7 XDR80T DTXC056 2000 1948 0 PIT FSP PS 4 = 8 H 10:00 10:30 10:30 18:30 KAI MRIPT23040331 BS, + PPE + PAP + INSPECTION

8 XE215C EXXC005 8750 8691 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040336 BS, + PPE + PAP + INSPECTION

9 ZX870LCH-5G EXHT002 24250 24185 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040335 BS, + PPE + PAP + INSPECTION

10 XDE130 HDXC077 750 699 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040332 BS, + PPE + PAP + INSPECTION

UNIT AUXILIARY A2B


HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE
No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
HM SERVICE ACTUAL KM START FINISH START FINISH

1 DX225LCA EXDS015 10250 10174 0 PIT FSP PS 1 = 2 H 09:00 09:30 09:30 17:30 KAI MRIPT23030714 BS, + PPE + PAP + INSPECTION

2 D8R BDCT003 12500 12469 0 PIT FSP PS 2 = 4 H 09:00 09:30 09:30 17:30 KAI MRIPT23040325 BS, + PPE + PAP + INSPECTION

3 D155A-6 BDKM066 8000 7937 0 PIT FSP PS 4 = 8 H 09:00 09:30 09:30 17:30 KAI MRIPT23040326 BS, + PPE + PAP + INSPECTION

4 XE490 EXXC038 3750 3687 0 PIT FSP PS 1 = 2 H 09:00 09:30 09:30 17:30 KAI MRIPT23040327 BS, + PPE + PAP + INSPECTION

5 XE215C EXXC030 4250 4181 0 PIT FSP PS 1 = 2 H 09:00 09:30 09:30 17:30 KAI MRIPT23040328 BS, + PPE + PAP + INSPECTION

6 D85ESS-2 BDKM010 13250 13198 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040262 BS, + PPE + PAP + INSPECTION

UNIT AUXILIARY NON A2B


No MODEL UNIT C/N UNIT HM REMAIN HM / LOCATION PS ESTIMATE WASHING ESTIMATE SERVICE REMAKS & PR
SERVICE BY MR
HM SERVICE ACTUAL KM START FINISH START FINISH

1 APD 66C GS019 1250 1195 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040292 BS, + PPE + PAP + INSPECTION

2 Hilight V4 TLAC006 2000 1914 0 PIT FSP PS 4 = 8 H 10:00 10:30 10:30 18:30 KAI MRIPT32040301 BS, + PPE + PAP + INSPECTION

3 FMX440 WTVV007 12000 11932 0 PIT FSP PS 4 = 8 H 10:00 10:30 10:30 18:30 KAI BS, + PPE + PAP + INSPECTION

UNIT COAL TRANSPORT


HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE
No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
KM
HM SERVICE ACTUAL START FINISH START FINISH

UNIT BIG MACHINE 16-Apr-23 SERVICE


HM REMAIN HM / ESTIMATE WASHING ESTIMATE SERVICE
No MODEL UNIT C/N UNIT LOCATION PS SERVICE BY MR REMAKS & PR
HM SERVICE ACTUAL KM START FINISH START FINISH
1 HD777E HDCT060 4250 4184 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI MRIPT23040334 BS, + PPE + PAP + INSPECTION

2 HD785-7 HDKM056 7000 6912 0 PIT FSP PS 3 = 6 H 10:00 10:30 10:30 18:30 KAI BS, + PPE + PAP + INSPECTION

3 HD785-7 HDKM039 26000 25916 0 PIT FSP PS 4 = 8 H 10:00 10:30 10:30 18:30 KAI BS, + PPE + PAP + INSPECTION

4 HD785-7 HDKM071 3000 2917 0 PIT FSP PS 3 = 6 H 10:00 10:30 10:30 18:30 KAI BS, + PPE + PAP + INSPECTION

5 D85ESS-2 BDKM063 10500 10432 0 PIT FSP PS 2 = 4 H 10:00 10:30 10:30 18:30 KAI BS, + PPE + PAP + INSPECTION

6 D85ESS-2 BDKM075 5750 5679 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI BS, + PPE + PAP + INSPECTION

7 DH24B2 XL BDSA019 2250 2180 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI BS, + PPE + PAP + INSPECTION

8 D85ESS-2 BDKM059 10750 10674 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI BS, + PPE + PAP + INSPECTION

9 D375A-6R BDKM078 6250 6176 0 PIT FSP PS 1 = 2 H 10:00 10:30 10:30 18:30 KAI BS, + PPE + PAP + INSPECTION

Prepared by, Check by, Approved By,

Raya Rolisae Teguh Susanto Agus Ahmad Supratman


Jr. Planner DDH. Planner DH Plant