R.

K ENGINEERING, HOSUR
DATE : 04/05/2023

COST BREAKUP / TOTAL COST


DRAWING NO : T: 204863 DESCRIPTION : OUTER YOKE
RAW MATERIAL BASIC PRICE / KG : 78.00/- SCRAP RATE / KG : 39.00/-
MATERIAL THICKNESS / GRADE : 0.8MM / CR-D
STRIP SIZE / INPUT WEIGHT / COST : 249 GM / 1.94/- (63×63×0.8)
FINISHED WEIGHT : 15.8 GM
SCRAP WEIGHT / RECOVERY : 9.1GM / 0.35/-
OPERATION STROKE RATE TOTAL COST BREAKUP BREAKUP
CUT / BLANK 60TM 0.45 40000* MATERIAL COST
1ST DRAW 40TM 0.30 40000 MANUFACTURING COST
2nd DRAW 40TM 0.30 40000 ICC@ 1.5%
SLOT ×2 30TM 0.46 40000 REJ@ 2.0%
HOLE PIERCING 30TM 0.23 18000 OH@ 5.0%
IDM/C S/C 1.80 5000 PROFIT @ 7.5%
PLATING S/C 3.50 - -

TOTAL COST 7.04/- 183000/- TOTAL/ PIECE

*PACKAGING / FORWARDING NOT INCLUDED, WILL BE FINALISED LATER.

R.K ENGINEERING,

ANANDAN RADHAKRISHNAN

FOR PROPRIETOR