Professional Documents
Culture Documents
Northern Samar Roadmap 2020 1
Northern Samar Roadmap 2020 1
DEPARTMENT OF EDUCATION
Regional Office No. VIII
DIVISION OF NORTHERN SAMAR
Catarman, Northern Samar
https://northernsamar.deped.gov.ph
nsamardivision@deped.gov.ph
1 Tittle
3 Contents
4 Rationale
5 Objectives
6 The Roadmap
Administrative Management
-Cash Management
-Records Management
Financial Management
-Accounting
-Budget
Performance Management
Instructional Management
Assessment of Learning
School Health
Education Facilities
RATIONALE
Education is a fundamental right of every Filipino child. The Philippine Constitution provides
that “The State shall protect and promote the right of all citizens to quality education at all levels,
and shall take appropriate steps to make such education accessible to all.” As a right, every child
must go to school and the government must provide access to quality, relevant, and liberating
education. Yet in times of disasters, calamities, and conflicts, the delivery of education service is
often disrupted.
However, DepEd Northern Samar Division is committed to ensuring access and quality
education in emergency situations like Covid-19 pandemic. As an emergency response to this
daunting situation, the division formulated the Division Emergency Roadmap or Division Learning
Continuity Plan.
The Division Emergency Roadmap serves as a guide of 606 schools in the 46 schools districts
in developing their own school-based emergency roadmap which will address the issues and
concerns relative to the delivery of basic education amidst COVID-19 pandemic. It considers a
“whole division” approach in addressing the risks and challenges that the entire division might
encounter in pursuing its mandate on providing access and quality to the school learners.
Likewise, the Emergency Roadmap outlines the implementing measures, strategies, and
interventions by Key Result Area including the risks, challenges, and their respective responses
with the aim of sustaining an efficient, effective, and interoperable Schools Division even in times
of global crisis.
In the crafting of the Division Emergency Plan, the Division Planning Team considers the
following:
1. Alignment of the Division KRAs and implementing measures to Regional KRAs and measures;
2. Financing requirements;
3. Safe operations of various schools division offices, district offices, and schools;
4. Appropriate learning modalities;
5. Wellness and protection of teachers and learners;
6. Sustainability of the implementing measures; and
7. Recognition and involvement of various stakeholders.
OBJECTIVES
The overall objective of the Division Emergency Roadmap is to ensure that emergency-
affected school learners continue to get access to quality, relevant, and liberating education in times
of Covid-19 pandemic.
1. Ensure that the three functional division offices of the Schools Division Office (SDO) are
prepared to deliver the basic services to the schools and other stakeholders even during the
time of emergency;
2. Strengthen the capacity of the division, district, and school personnel in providing the
required and essential knowledge, skills, and values to all types of learners;
3. Capacitate the school personnel in formulating, implementing, and monitoring and
evaluating their School Emergency Plan or School Learning Continuity Plan; and
4. Ensure strong partnership and collaboration among various stakeholders.
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Presence of Loan
Officer(Remittanc
e Unit personnel)
and Regional 100% loan
Personnel will be
Strict observance of applications sent
Review and send loan Payroll Services Loan Verifier exposed to virus;
minimum health to RO for
application with payslip to Daily & Remittance No/Weak/Poor
Strict observance Internet connectivity requirements; upgrade verification and
Regional Loan verifier Unit
of the IATF/DOH Internet connectivity appropriately acted
safety measures upon
on the part of the
client and the
receiving officer
Cash Management To ensure efficient cash
collection and receipt within
the time frame
To ensure on time
preparation of liquidation
and all cash unit’s reports
Observe minimum health
Cash Unit Liaison personnel
Prepare Monthly Report of standards; submit the
Monthly Implementing could be infected by
Disbursement reports of the IUs through 100% submission
Units the virus
Monthly Reports Messenger or email of month report
To perform other tasks
relative to cash management
functions
Issuance of a Division
Memo to the field about the
schedule of release of
payslips per district
Payslips for the
Create a groupchat of
Release of payslips per Cash Unit elementary and Liaison personnel /
school heads and liason 100% payroll and
district/school through liason Monthly Implementing secondary client could be a
officers to inform their payslips released
personnel Units teachers & carrier of the virus
schedule for the release of
personnel
payslip per district or
school. The GC will also
serve as a medium for cash
unit related
transaction/information
To efficiently and effectively
carry out the supply
management activities
through timely and
appropriate performance of
procurement and acquisition
functions
Possible infection
Issue Purchase Order to Supply and Strict observance of 100% Purchase
while in the process
winning bidder/supplier Property Unit minimum health standards Orders served
of performing the
function
As required Purchase Orders
To perform supply
management function
through ensuring adherence
to prompt and quality specs
of item delivered
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Supply and
Receiving/Inspection division MOOE
Procurement P 25,000
Personnel must observe Fund
Management Forwarder/Suppliers 100% delivery of
Receive deliveries of health standards;
could be purchased
supplies/materials/equipment Supply and Supplies/Material Appropriate
asymptomatic virus supplies/materials
with proper handling and As required Property Unit s/equipment decontamination of the
carriers; supplies, /
caution delivered supplies,
materials, and equipment
materials and equipment
equipment could
prior to inspection,
have virus
issuance/storage
To conduct inventory and
disposal activities for waste
materials and disposable
equipment
100% inventory
Issuance of a Division
and disposal
Memorandum a month
conducted
before the actual conduct
Conduct of inventory and Supply and
Request for of the inventory and
disposal of materials and Semi-annual Property Exposure of 100% report of
disposal from the disposal activities
equipment and Annual General personnel to virus inventory and
schools indicating the guidelines
Services unserviceable and
and health standards;
waste materials
Personnel must observe the
approved and
health protocol
validated
To conduct regular Inventory Annual and Supply Unit Division Issuance of Memorandum 100% of the Report
of Property, Plant and semi-annual Memorandum on on the Physical
Equipment (PPE) and other the schedule of Count of Property,
asset inventories annually the conduct of Absence of the Plant and
and semi-annually inventory and the accountable Equipment
Custodianship respectively protocol to be personnel due to 50,000.00 Division/MOOE (RPCPPE) and
-Conduct of annual and semi- undertaken unforeseen/unavoid Report on the
annual inventory of equipment able reasons Physical Count of
and properties Inventories (RPCI)
Were approved and
validated
Records Management To perform efficiently and
effectively the records
management cycles such as
classification, filing,
maintenance, and disposal of
documents within the year
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Issuance of a
memorandum on the
designation and functions
of District Liaison Officers
and schedule of releasing
with particular emphasis
No designated on minimum health
Division
Liaison Officer at the standards set by
Memorandum on
District Level; IATF/DOH
the schedule of
Liaison Officer could
Receive/release documents receiving and
be infected in public Issuance of a 100% of the
from the district office releasing of
Records Unit transport memorandum documents
(including secondary schools) Daily documents
ICT Office on the guidelines for received were
through the District Liaison
No/Poor/Weak submission/ releasing of released on time
Personnel Documents from
Internet Connectivity documents through email
the Districts and
and other mode
Schools
of online submission
Conduct management
conference on Target Setting ( SDS, ASDS, Participants may be
KRA, Tagrets & Chiefs, PMT Attendance of asymptomatic Observe minimum health Conference
Accomplishments) Nov.,2020 members Participants carriers standards 5,000.00 Div MOOE conducted
Participants may be
Conduct Rater-Ratee SDS, ASDS, Attendance of asymptomatic Observe minimum health Conference
Conference Dec. 2020 Chiefs Participants carriers standards 1,000.00 Div MOOE conducted
Performance Monitoring
& Coaching
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Rewarding &
Development Planning
100% of personnel
Attendance of Participants may be were given
Identify,review, consolidate, Dec. 2020 SDS, PMT Participants asymptomatic Observe minimum health developmental
and recommned interventions Mar. 2021 S,personnel IPCRF/OPCRF carriers standards 1,000.00 Div MOOE interventions
SDS,
SGOD,Plannin
g Office, PMT
member
LEGAL
Legal and Technical To provide legal and
Assistance technical assistance to
teaching & non-teaching
personnel; conduct and
prepare investigation; and
assist and provde technical
assistance
Conduct of capacity building Particpants may be Conduct of training by
May-
on Child protection Policy & Approved Training asymptomatic batch ( maximum of 20);
December, DO-Legal Office
other school laws and Proposal carriers participants must observe 100% of target pax
2020
regulations health standards 100,000.00 MOOE/HRD attended
Fact-Finding Conduct conference and other May, 2020- •Legal Investigators and Conference and other 95,000 MOOE
Investigation Reports means of investigation May, 2021 Officer/Staff Parties could be means of investigation may
•Formal asymptomatic virus be resorted, provided that
Investigation complaints, cases,
notices carriers all the necessary preventive
Committees 100% of scheduled
health measures shall be
•Division Office conferences/invest
observed at all times
Legal Unit igations conducted
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Facilitate in the August, ICT Unit Online Personnel could have Provide guidelines/ 100% of personnel
creation/resetting of DepEd 2020April Application, Multiple instructions on how to were provided with
Accounts and Microsoft O365 2021 Smartphone, Creation/Password avail DepEd Accounts in new accounts in
Tablet, Laptop Resetting the Division official DepEd Accounts
Desktop website and Microsoft
O365
Design/Develop Division
Information Systems
Upgrade Internet Subscription June-July, ICT Approved Inappropriate access Optimise or filter the use PHP 200,000 MOOE/Special 100% utilization of
2020 Unit/Budget Purchase of unauthorized of Internet fund upgraded, fast and
and Finance Request, Budget websites; Limited reliable Internet
Division Allocation, and slots ISP (internet connection
Available Internet Service Provider)
Service Provider
ICT System and
Infrastructure Design Rehabilitate the Division June to July ICT Approved Some offices have Upgrade internet 100,000 MOOE/Special 100% of offices
and Management Centralized Network 2020 Unit/General Purchase unstable or weak connection; procure fund have wireless
Services Request, Budget Internet connection; network interface card for Internet access
Allocation limited number of desktop
laptop computers
Provide Server Room for the June 2020 ICT Unit Server Room, Unavailablity of Provision of Secured Server 300,000 DIVISION/DERP 100% deployment
Implementation of DepEd Dedicated Server Room Room to setup the DERPS S FUND of DERPS Phase 2
Resource Planning System Internet Line Phase 2 in the Division
(DERPS) Phase 2 Office
Conduct inventory of teachers June 2020 LRMD section, Gmail & DepEd Upgrade Internet
registration in the LRMDS ICT Office email account Unstable/Slow connection; Ask help from 100% of the
portal PSDSs Internet connection co-teachers & TA from teachers are
Teachers District & Division ICT registered users
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Conduct CB on the utilization June 2020 LRMD section Available copy in Participants could be Online and offline tutorial 500,000.00 MOOE 100% of the
of supplemental teaching- ICT Office CID the LRMDS exposed to virus learning to the district district were
learning resources in DepEd Personnel provided with
Commons, Knowledge channel, resources
LR portal & other online links
To conduct monitoring,
evaluation & technical
assistance
Instructional EPS, PSDS, Sch Monitoring Tool, Personnel could be Observe health standards; 1,500,000.00 MOOE 100% of the target
Supervisory Plan exposed to viurs; Upgrade Internet in the AIP
Management Conduct an actual visit &
Unstable/Slow connection; use of different
online monitoring June-2020- Internet connection means of online facilities
March,2021
EPS, PSDS, Sch 100% submitted
Personnel could be Obaserve health standards;
the report
Submit SISP/DISP & Monitoring Tool, exposed to viurs; upgrade internet
SISAR/DISAR June 20- Supervisory Plan Unstable/Slow connection; use of different
March 2021 Internet connection means of online facilities
Activate the online EPS, PSDS, Sch Monitoring Tool, Unstable/Slow Upgrade Internet connection; 100% 0f districts
communication of monitors, June 2020- Supervisory Plan Internet connection use of different means of use online
supervisors & school heads March 2021 online facilities communication
EPS, PSDS, Sch Monitoring Tool,
Personnel could be Observe health standards;
Conduct TA & coaching Supervisory Plan
exposed to viurs; Upgrade Internet 100% of districts
and mentoring thru online
June 2020- Unstable/Slow connection; use of different were provided with
or face-to-face
March 2021 Internet connection means of online facilities TA
To capacitate school heads EPS/PSDS Policies & Unstable/Slow Upgrade Internet 100% of school
on the implementation of procedures; Internet connection connection; use of were capacitated
K12BEC & SCP in the new guidelines teleconferencing (Zoom &
normal thru online Teams); provision of soft
June- copies
conferencing on the following: July,2020
Utilization of ADM
modules
LR Portal registration
Knowledge channel
DepEd Commons
Utilization of online links
Other CBs necessary in
the new normal
Assessment of To assist schools establish an
effective management of
Learning
learning assessment
No available copies Provide with the soft copy
Align the test item bank with EPS, School Test items All competencies in
the activities and evaluation in Heads, the modules
the ADM modules Quarterly teachers aligned with TIB
Quarterly M&E, EPS 100% conducted
Monitor the conduct of Personnel could be
Districts & Strict observance of the the MEA
school MEA exposed to virus;
School Heads MEA reports health standard; upgrade
Unstable/Slow
Monitor the conduct of Internet connection
Internet connection
District MEA ME, EPS, PSDS, SH MEA reports
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Incomplete submission
Constant reminders/ updates
of SDGT by schools; 100% of the targeted
to District/School Heads 8,500 (One
Conduct SDGT Finalization District personnel could be Div. MOOE quarterly SDGT
Quarterly SMME, ITO before the deadline; observe day meal for final
(online) Consolidated SDGT exposed to virus; (GASS) Finalization
health stnadards upgrade reporting)
unstable/slow Internet conducted
internet connection
connection
Incomplete submission
Conduct Internal DMEA. Online Constant reminders/ updates
of SDGT by schools;
submission of Monitoring, to Section/Unit Heads before 100% of the targeted
OSDS, SGOD, Validated MEA personnel could be Div. MOOE
Evaluation and Adjustment (MEA) Quarterly the deadline; observe health quarterly Internal
CID Reports exposed to virus; (GASS)
Report by Section/Unit to the standards; upgrade internet DMEA conducted
unstable/slow Internet
functional division focal person connection
connection
Consolidated MEA
Incomplete submission
Reports by Constant reminders/ updates
of report on or before 15,000 (food
Conduct Division Monitoring, Functional Division to Section/Unit Heads before 100% of the targeted
OSDS, SGOD, the deadline; personnel for 2 days) 20,000 Div. MOOE
Evaluation, and Adjustment Quarterly are submitted the deadline; observe health quarterly DMEA
CID could be exposed to (Materials for the (GASS)
(DMEA) ahead of the standards; upgrade internet conducted
virus; unstable/slow production of ACR)
scheduled online connection
internet connection
presentation
Receive SBM Self-Assessment May - June SMME, ITO Performance Personnel involved Observe health standards; 100% of the schools
Result from schools Improvement could be infected with Upgrade Internet connection; with SBM Level III of
Rating & Document virus; no uploaded use of different means of Practice validated
Validate schools with School- June-July Division SBM Documentary Non-compliance with Provide online technical 52,500 (Board Div. MOOE 100% of the
Based Management (SBM) Level III Composite Team, requirements based the required standard assistance; observe health & Lodging of (GASS) application received
and assess online the following SGOD, CID, on standards and and processes; standards; upgrade internet Regional evaluated and
SBM level of Practice (Document OSDS related issuances personnel involved; connection Validators) submitted online to
Analysis and Observation could be infected with the QAD
Discussion) virus; unstable/slow
Internet connection
Accept and evaluate application Public SMME, SGOD Documentary Non-compliance with Provide technical assistance
for the establishment, separation, School (June Chief requirements based the required standards to the non-compliant schools;
recognition, closure, merging, 30 of the on standards and and processes; observe health standards;
conversion, separation and current year); related issuances personnel involved upgrade internet connection
recommend to SDS for Private could be infected by
indorsement to the Regional Office School virus; unstable and
thru QAD (August 30 of slow internet
the year connection
preceding the
year of
operation)
Accept and evaluate application 3rd week of SMME Documentary Non-compliance with Provide technical assistance 100% of the
documents for the increase in January to requirements based the required standards to the noncompliant schools; application received
Tuition and other School Fees 2nd week of on standards and and processes; observe health standards; evaluated and
May of the related issuances personnel involved upgrade internet connection submitted online to
year could be infected by the QAD
virus; unstable and
slow internet
Accept, validate and assess the September SMME Documentary ti
Noncompliance with Provide online technical 100% enrolment of
documents for billing of onwards requirements based the required standards assistance to the GASTPE beneficiaries
Government Assistance for on standards and and processes; noncompliant schools; validated
Students and Teachers in Private related issuances personnel involved observe health standards;
Education (GASTPE) could be infected by upgrade internet connection
virus; unstable and
slow internet
Validate enrolment of GASTPE 1st quarter of SMME PEAC Generated Exposure of SMME Strictly observe the IATF-DOH 10,000 Div. MOOE 100% enrolment of
(ESC, TSS and SHSVP beneficiary) the School List of Enrolment & Staff to COVID-19 Minimum Health Protocol for (Traveling (GASS) GASTPE beneficiaries
schools through headcount Year Schools Official List COVID-19 Expenses) validated
of Enrolment
Prepare and submit project June- SMN personnel Program needs Unresponsive funder Mapping out of potential 75,000 (purchase Div. MOOE/ 100% of the
proposals to identified potential December assessment results partners at the local level; of laptop for capital outlay programs have
partners/donors submit proposals to potential documentation, prepared proposals
partners thru emails presentation, and
reporting)
Prepare MOA/MOU representing June- SMN personnel MOA/MOU None None None 100% of MOA/MOU
partnership for specific December template prepared/forged
Update Book of Donors/Partners June - SMN personnel DPDS Difficulty in the Invite trained personnel to 100% of partners/
December templates/laptops utilization of DPDS provide TA donors were included
To expand/sustain and
institutionalize partnerships and
linkages with stakeholders
Reissue MOA/MOU to existing June - SMN personnel Old MOA/MOU Indefinite commitment Conduct visits/schedule 25,000 (travel Div. MOOE 100% of MOA/MOU
partners/donors December assurance of existing appointment with existing expenses during (HRTD) reissued
partners partners via face-to-face partner visit)
(observing minimum health
standard) or online
Conduct division awarding of December SMN personnel Search procedures Prolonged outbreak of Provide citation certificates 100% of identified
education partners/donors conducted virus/pandemic thru email, FB, or other active/qualified
online platforms partners
awarded/recognized
Conduct of 2020 Brigada Eskwela June – SMN personnel Site visits Mapping out of potential 200,000 (BE Div. MOOE 100% of BE activities
Low turn-out of
activities August with SGOD Chief partners at the local level; kick-off and (HRTD) conducted
stakeholders’
& EPS; BE & submit proposals to potential monitoring
participation; schools
ASP partners thru emails; request activities)
used as quarantine
Coordinators LGU to vacate and disinfect
facilities
rooms
Youth Formation
Program (YFP) & Disaster To capacitate schools and
Risk Reduction learning centers in the delivery
Management (DRRM) of education program services
Conduct Youth Formation October – YFP Venue, supplies Prolonged outbreak of Face-to-face conduct the 300,000 Div. MOOE 100% of YFD
Conduct DRRM Activities October – DRRM Venue, supplies Prolonged outbreak of Face-to-face conduct the 1,000,000 (CB DRRM Funds 100% of DRRM
December Coordinators, and materials virus/pandemic activity in smaller number (by activities for activities conducted
SMN personnel batch) observing the DRRM
with SGOD Chief minimum health standard; coordinators)
& EPS online activity
To establish coordination
mechanism and protocols among
external and internal partners
Purchase PPEs for Division COVID Jun 2020 SMN & SH Documentary None None 200,000 (purchase DRRM Funds 100% of Division
19 Task Force sections, BAC requirements on of PPEs) COVID 19 task force
procurement members were
provided with PPEs
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Monitor schools used as June – Division Task Monitoring Tool Possible extension of Coordinate with the 50,000 (travel and DRRM Funds 100% compliance to
quarantine facilities December Force classroom used as concerned LGUs monitoring the terms and
quarantine facilities expenses of COVID conditions re:
task force quarantine facilities
Update of personnel Competency October - SGOD Chief, Accomplishment None None None 100% of personnel
Development Needs (CDN) based December EPS, HRD SEPS and submission of CDN
on IPCR/OPCR results & EPSp II, PO consolidated updated/profiled
IPCR/OPCR
HR Development To determine and identify
Interventions learning and development needs
of personnel
Conduct online and/or face-to- August - SGOD Chief, Personnel profile Crowding of pax which Conduct the activity in 720,000 (for live-in Div. MOOE 100% of identified
face screening of NEAP facis; Non- December EPS, HRD (non-teaching) is a threat of smaller number (by batch); NTIP with non-teaching
teaching Induction Program Personnel spreading/transmissio Cascade training to districts complete meals personnel inducted,
(NTIP); Orientation on CPD n of virus; Unstable by division-trained and materials and pooled NEAP facis, &
internet connectivity, trainers(from TOT); Online live out orientation oriented personnel
Laptops/CPs/Technica activity in coordination with on CPD) on CPD
l know-how on online the district heads, and
modality/teleconferenc provision of TA from ICT
ing of the personnel in- personnel
charge
Update the scholarship June, HRDS personnel Endorsed none none None 100% updated
information system September, scholarship scholarship
December programs from RO information system
(Quarterly) and CO and other
partners
Training and To calendar all training and
Development Records Update and record L&D activities June- HRDS personnel Division/Unit/Secti None none None 100% updated L&D
December on submission of Calendar
(monthly) L&D activities
To update the TDIS
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Update personnel L&D June- HRDS personnel L&D Activities None None None 100% updated
information system December personnel L&D IS
Succession and Exit To design programs on
succession and exit among
employees
Conduct Webinar on October & SGOD Chief, Submission of PPSSH/SHDP: Conduct the activity in 250,000 (Honoring Div. MOOE 100% of identified
PPSSH/SHDP (Proj. EAGLES December EPS, HRDS and personnel profile unstable internet smaller number (by batch); the Retirees - SHs trained and
NEST); house to house visit to ICT personnel from HRMO and connectivity, lack of Cascade training to districts plaques, DepEd N. Samar
honor the retirees and online districts/schools technical know-how on by division-trained photopaper, and retirees recognized/
homage to the retirees via DepEd teleconferencing/ trainers(from TOT); Online cert holder; SHDP honored
N. Samar page conduct of webinar; activity in coordination with for TICs – lunch,
Honoring Retirees: the district heads, and snacks and
possible exposure to provision of TA from ICT materials)
visus personnel; observe minimum
health standards
Develop approach and method for quarterly P&R Recommendation None None None 100% of the planning
monitoring and evaluating the from the SGOD system monitored &
implementation of the planning chief for the evaluated using a
system at the Schools Division approval of the SDS developed approach
ffi
Assess di
reports h
andl datad gathered
l i d h d
on the planning system and
submit recommendations for
policy formulation on matters
relevant to education planning
system, planning standards and
criteria, and planning processes
based on action research.
Conduct Evaluation of May & P&R Issuance of Division Non-submission of Constant follow-up from the 16,000 (food for Div. MOOE 100% of researches
Action/Basic Research Proposals November Memorandum on proposal the completed functional divisions 10pax, venue for (HRTD) evaluated
Recommend Approval of July & P&R Issuance of None None None 100% of researches
Action/Basic Research Proposals December evaluation recommended were
and Completed Researches certificate approved
Design Research Bulletin, Policy August P&R Issuance of Div None None 147,000 Div. MOOE 100% of identified
Note, or Research Journal Memorandum on (food, venue, and (HRTD) researches were
the designing of materials published in
research bulletin Research Bulletin,
Policy Notes or
Virtual conduct of Research September Unstable internet Coordination with ICT 5,000 (for food and Div. MOOE 100% of identified
Festivals connection materials of the (HRTD) researches were
management team presented
Submit recommendation for July & P&R Recommendation None None 100% of submitted
policy formulation December by the SGOD chief recommendations
were used in policy
formulation
To prepare the Division research
agenda based on Basic
Education Research Fund
(BERF) standard and oversee its
implementation
Prepare DRA based on BERF April P&R none none
Screen BERF Research Proposal May P&R, DRC Issuance of Div No submission of Provide online TA through
Memorandum research proposal coaching and mentoring
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Recommend for Approval of May P&R, DRC Issuance of Div No submission of Provide online TA through
screened BERF Research Memorandum research proposal coaching and mentoring
Proposals
To coordinate preparation by the P&R, DRC Issuance of Div No submission of data Coordinate with concerned 100% of
Planning Team of the Annual Memorandum office to submit either in soft units/seftions
Accomplishment Report against copy or hard copy submitted the data
plans of the schools division for
submission to the management
of the schools division.
Review and analyze of the Division June, P&R EBEIS data Unstable internet Coordinate with ICT 100% of the data
Basic Education Data/Information September, connection generated were
generated, reviewed, and validated November reviewed and
analyzed
Distribute flyers of the Division December P&R Basic Education Risk in face-to-face Share the flyers online 5,000 (materials Div. MOOE (HRTD) 100% distribution of
Basic Education Data to the Data generated distribution for printing) flyers
stakeholders from the EBEIS
Consolidate, analyze, and validate October P&R Basic Education None None Schools and LCs
requirements of schools and Data generated needs analysis ready
learning centers as basis for from the EBEIS
reliable and accurate resource
allocation.
Monitor and consolidate June - August P&R Online monitoring Unstable internet Coordinate with ICT 100% of enrolment of
enrolment of learners online and consolidation connection learners consolidated
facility
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
To lead in designing,
coordinating and implementing
policy, and planning research
studies as identified by M&E
reports, TA reports, the
management of the schools
division, schools and learning
centers
Virtual conduct of an Innovation September P&R Submission of Unstable internet Coordinate with ICT 5,000 (for food and Div. MOOE Innovation entries
Caucus innovations connection materials of the (HRTD) presented
management team
Online capacity building of the September P&R Resource package Unstable internet Coordinate with ICT 5,000 (for food and EBEIS/LIS fund 100% of concerned
SDO, Schools and LCs on connection materials of the personnel
Information systems and data management team capacitated
utilization (EBEIS, LIS, PMIS)
Mixed methods Action Research June P&R Resource package Crowding of pax which Conduct the activity in 304,000 Div. MOOE (HRTD) 100% of concerned
Writeshop for Teaching & non- is a threat of smaller number and adhere to (for food) personnel
teaching DepEd employees via spreading/transmissio minimum health standard capacitated
Community of Practice (CoP) (face- n of virus
to-face)
Technical Assistance To provide Technical Assistance
to schools and learning centers
by responding to the identified
needs in relation to planning
and other matters on
governance and operations
Provision of technical assistance Year round P&R TA Plan Prolonged outbreak of Face-to-face conduct the 100% of schools and
to schools and LCs virus/pandemic activity in smaller number (by learning centers with
batch) observing the TA needs provided
minimum health standard;
online activity
Monitoring of schools and LCs in Year round P&R Monitoring Tool Prolonged outbreak of Face-to-face conduct the 100% of schools and
the EBEIS and LIS virus/pandemic activity in smaller number (by learning centers
implementation batch) observing the monitored
minimum health standard;
SGOD – SCHOOL HEALTH (SH)
Health and Nutrition To provide Technical Assistance
Services Management for the effective provision of
health and nutrition services
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Participate in the conduct of as required SHS laptop, adequately Unsttable/Slow Upgrade Internet connection 100% of the
Webinar sessions on Psychological strong internet internet connectivity personnel
First Aid (PSA) Mental Health connectivity participated in the
Psycho-social Support Services webinar
(MHPSS) by the RO 8 and in
addition share inputs on
Implement the RO 8 Online during the SHS laptop, internet Unstable/Slow Upgrade Internet connection; 100% of cases
Referral System of Learners period connectivity internet connectivity; coordinate with Provincial identified were acted
manifesting symptoms of covered as non-availability of Psychosocial Support upon
depression and other related the situation Provincial Mental Committee Coordinator and
mental health problems arises Health Coordinator Medical coordinator
and Medical
coordinator
Supervise the HNP deployed to the weekly SHS laptop, internet Unstable/Slow Upgrade Internet connection; 180,000 (300 Div. MOOE 100% of the
schools in the implementation of connectivity internet connectivity use of other online facilities monthly load of 50 personnel monitored
policies, programs, projects thru personnel) online
online monitoring
Provide technical assessment of bi-annually SHS laptop, Unstable/Slow Upgrade Internet connection; 100% of the school
health and health-related facilities PERSONNEL comprehensive internet connectivity use of other online facilities complied with WinS
like school clinics and online monitoring on line monitoring
handwashing facilities and give system (oms), system
recommendation based on internet
standards thru online connectivity
communication
Provide technical assessment of bi-annually SHS laptop, Unstable/slow internet Upgrade Unternet 100% of the districts
health and health-related facilities PERSONNEL comprehensive connectivity connectivity; use of other were provided with
like school clinics and online monitoring online facilities technical assessment
handwashing facilities and give system (oms), and assistance
recommendation based on internet
standards thru online connectivity
communication
Provide online Pre-participation annually SHS laptop, internet Unstable/slow internet Upgrade Internet connectivity; 100% of the
Evaluation (PPE) Medical ideally 6 connectivity connectivity use of other online facilites cocnerned personnel
Clearance: months prior were provided with
> for coaches, trainers and to any sports clearance
athletes, administrative and other activity or at
support personnel on sports least prior to
medicine to prevent sudden any special
cardiac and other forms of sudden physically
deaths strenuous
> for program managers to activities/
preempt other serious overt or undertaking
latent medical conditions esp. in DepEd like
those having comorbidities or trainings and
exposure to communicable seminars
diseases with significant mortality
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Conduct Medical Triage COVID May 2020- SHS non-contact inadequate supplies coordinate with budget office 100% of clients and
Screening of Division Office March 2021 thermal scanner, and accountant subject to the employees entering
personnel and office clients daily masks, gloves, PPE, approval of SDS, prioritize the the office have
and during future eventualities sanitizers, alcohol usage undergone medical
following universal health triage
standards
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Conduct of Medical Triage COVID May 2020 SHS non-contact inadequate supplies coordinate with budget office (1,000,000 for Div. MOOE 100% of personnel
Screening of Division Office March 2021 thermal scanner, and accountant subject to the emergency and clients were
personnel and office clients daily masks, gloves, PPE, approval of SDS, prioritize the purchase of wearing masks and
and during future eventualities sanitizers, alcohol usage health/hygiene observed sanitation
following universal health kits - almost done) protocol
standards
Distribute face masks, sanitizers May 2020 SHS budgetary inadequate supplies coordinate with budget office all personnel and
alcohol to each division office March 2021 allocation to and accountant subject to the clients are wearing
personnel and clients purchase approval of SDS, prioritize the masks and observe
usage sanitation protocol
Distribute multivitamins and August 2020- SHS, SCHOOLS budgetary limited supplies coordinate with budget office (3,000,000 for DepEd Funds 100% of severely
minerals to severely and wasted March 2021 HEADS, allocation to and accountant subject to the multivitamins and wasted were given
learners FEEDING purchase approval of SDS, prioritize the minerals - done) multivitamin/minera
TEACHERS severely wasted learners ls
Monitor WinS implementation in August 2020- SHS, SCHOOLS Monitoring Tool Possible exposure to Wearing of PPE and 100% of schools
schools March 2021 HEADS the virus on transit observance of social implemented Wins
and during monitoring distancing
e. Adolescent Reproductive
Health
· Weekly Iron Folate August 2020, SHS SENIOR Iron Folate Tablets Students not around in coordinate with the school (200,000 for Iron DOH 80% of the female
supplementation for the female January 2021 HIGH SCHOOL the school heads and teachers to Folate - done) secondary student
secondary high school students NURSES in facilitate the distribution of have received the
Team Approach the supplementation supplementation
f. National Drug Education
Program
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Classroom health teachings by the August 2020- SHS physical attendance Students not around in coordinate with the school 100% of the learners
health personnel january 2021 PERSONNEL of learners the school head on their adopted were reached out
system/ strategies to continue
teaching even at home
Conduct on-site orientation for All year round SGOD-EFS Approved Possible exposure to Wearing of PPE and 15,000 (TEV, Div. MOOE 100% of personnel
contractors, school heads, school - as the need Construction Safety the virus on transit observance of social service vehicle working in the site
property custodians and barangay arises. (This Guidelines for the and during orientation distancing gasoline/diesel, were COVID-free
captains on safety guidelines for activity shall implementation of PPE)
the implementation of be done DepEd
infrastructure project during the during the Infrastructure
Covid-19 public health crises. pre- Projects during the
construction COVID-19 public
meeting of health crisis;
newly service vehicle to
awarded lessen exposure to
projects) the virus; PPE to
ensure safety of
engineers
conduct on-site monitoring of All year round SGOD-EFS Service vehicle to Possible exposure to Wearing of PPE and 37,500 (TEV, Div. MOOE 100% of sites were
contractor's compliance with - as long as lessen exposure to the virus on transit observance of social service vehicle monitored
construction safety guidelines for there are on- COVID-19 virus; and during monitoring. distancing gasoline/diesel,
the implementation of going PPE to ensure PPE)
infrastructure project during the infrastructure safety of engineers.
COVID-19 public health crisis. projects.
Monitor the infrastructure All year round SGOD-EFS Service vehicle to Possible exposure to Wearing of PPE and 18,000 Div. MOOE 100% of the
projectS to ensure compliance - as long as lessen exposure to the virus on transit observance of social (TEV, service identified sites were
with construction standards. there are on- COVID-19 virus; and during monitoring distancing vehicle monitored
going PPE to ensure gasoline/diesel,
infrastructure safety of engineers. PPE)
projects.
Conduct on-site validation of All year round SGOD-EFS Service vehicle to Possible exposure to Wearing of PPE and 30,000 Div. MOOE 100% of the
school facilities damaged by - as the need lessen exposure to the virus on transit observance of social (TEV, service damaged schools
typhoon arises. COVID-19 virus; and during validation. distancing vehicle were monitored
PPE to ensure gasoline/diesel,
Conduct on-site validation of June - August SGOD-EFS Service vehicle to Possible exposure to Wearing of PPE and 30,000 Div. MOOE 100% of the schools
school buildings needing repair 2020 lessen exposure to the virus on transit observance of social (TEV, service were validated
and rehabilitation COVID-19 virus; and during validation. distancing vehicle
PPE to ensure gasoline/diesel,
safety of engineers. PPE)
Responsible Responses to Risks and
OFFICE/DIVISION KRA Implementing Measures Timeline Pre-Requisites Risk and Challenges Cost Estimate Fund Source Success Indicator
Person Challenges
Conduct project site validation for All year round SGOD-EFS Strong internet Inaccurate data Wearing of PPE and 3,000 (Mobile Div. MOOE 100% of project sites
construction of school facilities - as the need connection and provided by school observance of social phone load) were validated
(school buildings, handwashing arises. latest NSBI (2019) head, not updated distancing
facilities, school clinic and other data. technological data and
school facilities as mandated by Education Facilities
DepEd Central Office, EFD) using Unit file.
all available education facilities
data vis-à-vis latest technological
data (google map) and
consultation with school heads via
phone calls/zoom.