You are on page 1of 6

KETERANGAN

Legend

JAVA SEA

KENDAL
PORT

Main
(By
Drain
Others)
2 Ali-ali
0,8
0+855.5

0+868.262

0+850
N
2%
Indicative Only 2%
0+800

0+750
0+700

0+350
0+650

0+316.063
2+542.624

0+300
0+600

2+550

1,25
2+563.277

0+250
0+550

2%

2+600

0+215.274
2%

0+205.954
0+500
2+650
0+450

October
based
Road
on
26,
Level
monitoring
2021 this
at
+1.826
is
0+400

2+700
2%

point
2%
0+350

2+750
0+300

N
N
2+800
Indicative Only
Indicative Only 0+250

2%
0+200
2%

2+850

2%
2%
0+150

2+900

Main
(By
Drain
Others)
1
Upstream
0+100

2+950
0+050

3+000

0+000
3+050
N

3+100

2%
Indicative Only

2%
3+150

Main
(By
Drain
Others)
1
Upstream
3+200
3+250
0+050
Jl.
Jodipati

STA

0+025
STA
5.00

0+000
15.00
25.00

STA
JL.

5.00
JODIPATI

(ROW
25)
3+300

N
ROAD

3+350
FUTURE
Indicative Only
Point Coordinate

3+370
Point Coordinate

an
418617.843, 9233277.820 4 418580.693, 9233236.321

2 1
418614.031, 9233277.610
5 418580.483, 9233240.134
418613.820, 9233281.422 6 418576.670, 9233239.923

3
3+400
20.00
Temporary
[seeRoad

3+425
detail]Ending

uh
2%

3+450
South
2%
0+255
0+250

3+475
sta
2%2%

Indrapra

ab
0+225
Jl.
3+500
0+200 Maespati

3+525
0+175
25)

Jl.
(ROW

2%

3+550
MAESPATI
0+150 JL.

5.00

Pel
25.00

2%
0+125

3+575
0+100

2%
0+075

3+600
3
2%

JL.
0+050 2

INDRAPRASTA
1

3+625
FUTURE

335.00
0+025

315.00
ROAD

SOUTH

lan
3+650
0+000

(ROW
6
5
4
35)

3+675
2%

2%

3+700

Ja
3+725
4

25.00
- 3+750

25.003+775
Temporary
[see
1

detail] Ending
Road

2%

3+800
-

2%
South

3+825
2%
0+230

Sem

2%

ta
3

Indrapras
-
0+200

3+850
25)
0+175
Jl.

3+875
arang
(ROW
Dwurowati

Jl.
4
0+150 DWUROWATI
JL.

3+900
0+125 2%

2%

25.00
15.00

2%
-

1
0+100 2%

5.00

3+925

-
0+075

59.55

3+950
0+050

3+975
0+025

0+025
3
0+000 4+000

STA
2
STA X Y STA X Y

-
ndal
725 418558.143 9233211.43 3+370 418794.9669 9233475.9815
418802.3724 9233469.2615
418565.594 9233204.76
3+400 418774.9122 9233453.5791
750 418541.468 9233192.803
418548.919 9233186.134 418782.363 9233446.9093
775 418524.794 9233174.177 425 418758.2377 9233434.9523
418765.6884 9233428.2825
418532.244 9233167.507

U
450 418741.5631 9233416.3255
800 418508.119 9233155.55
418749.0138 9233409.6556
418515.57 9233148.88
825 418491.445 9233136.923 475 418724.8885 9233397.6986
418498.895 9233130.253 418732.3393 9233391.0288

Ke
500 418708.214 9233379.0718
850 418474.77 9233118.296
418715.6647 9233372.402
418482.221 9233111.626
525 418691.5394 9233360.445
875 418458.096 9233099.669
418465.546 9233092.999 418698.9901 9233353.7751
900 418441.421 9233081.042 550 418674.865 9233341.818
418682.316 9233335.148
418448.872 9233074.373
575 418658.19 9233323.191
925 418424.746 9233062.416
418432.197 9233055.746 418665.641 9233316.521
950 418408.072 9233043.789 600 418641.516 9233304.564
418415.523 9233037.119 418648.966 9233297.895
625 418624.841 9233285.938
975 418391.397 9233025.162
418632.292 9233279.268
418398.848 9233018.492
4+000 418372.86 9233008.203 650 418608.167 9233267.311
418382.173 9232999.865 418615.617 9233260.641
675 418591.492 9233248.684
418598.943 9233242.014
700 418574.817 9233230.057
418582.268 9233223.387

1 ha

0 100 250 500 1000 m

STA 0+025
STA 0+050

STA 0+000
Project
5.0
Location
4.0 NOTE

3+300
+2.009
5 Cm 5m 3.0 TOP LEVEL ROAD +2.750 Project Boundary
(Adjust on
(CENTER)
Actual Level)
4 4 2.0

5.00
3 3 1.0 SURCHARGE
15.00
25.00
Jl. Jodipati JL. JODIPATI (ROW 25)
2 2 0.0
5.00

3+350
1 1 -1.0

5 Cm 4 3 2 1 -2.0
50 m 40 30 20 10 0
SHOP DRAWING

3+370
Scale Horizontal = 1 : 1000 -3.0
Scale Vertical = 1 : 100 PROYEK
Project
-4.0
THE PROPOSED CONSTRUCTION
REFERENCE LEVEL : -5.00 (m) AND COMPLETION
0+050 OF INFRASTRUCTURE WORKS

3+400
JL INDRAPASTA SOUTH, JL
STATION NUMBER DWUROWATI AND JL MAESPATI
0+000
AT KENDAL INDUSTRIAL PARK

20.00 3+425
DISTANCE (m) 50.000 [CT-85/KIK/MP5.3/NFRA/IDRS.E/2022]

EXISTING

2.600 2.750 2.415 2.050 50.000


1.859 2.009 1.438 1.309 0.000
CHAINAGE (m)
EMPLOYER :

SURCHARGE (m) KENDAL PT. KAWASAN INDUSTRI KENDAL


INDUSTRIAL Jl. Raya Arteri KM.19 Kel. Brangsong, Kec. Brangsong
PARK Kab. Kendal 51371, Jawa Tengah, Indonesia
3+450

GROUND LEVEL (m) RECEIVED


ACCORDING TO REFF. DRAWING

CONST.
TOP LEVEL ROAD (CENTER) (m)
3+475
2%

outh
2%

SIDE LEVEL ROAD (m)


MANGATAS KPT SAGALA
prasta S

KONTRAKTOR
Penyedia Jasa
3+500

GENERAL CONTRACTORS
Jl. Indra

Jl. Jodipati Drawn By Checked By Approved By

Station Coordinate

0+000 418798.698, 9233509.882 Zaky Riza M Danny Kelana G., ST. Decky Eko A., ST.

REFERENCE DRAWING
0+025 418777.673, 9233523.408 No Code Description

1 KIP-MP5.3-INF-CT.85-LS.R-09a LONG SECTION OF ROAD


0+050 418756.647, 9233536.934 JL. JODIPATI STA.0+000 - 0+050

KETERANGAN GAMBAR
Drawing Description

LONG SECTION OF ROAD JL. JODIPATI


STA.0+000 - 0+050

SKALA :
1:1500
DWG NO.
KADII-SD-KIP-MP5.3-INF-CT.85-LS.R-05
KETERANGAN
Legend

JAVA SEA

KENDAL
PORT

W 35)
0+855.5

0+868.262
0+850

0+800
0+750

U-Ditch

0+700
1.2m
U-Ditch x 1.1m
1.2m

0+350
0+650 x 1.1m
Box

0+316.063

0+300
Culvert

2+542.624
0+600 2.0m
Box x 1.8m

2+550
Culvert

0+550
1.8m

2+563.277

0+250
x 1.8m

2+600

0+215.274
0+205.954
0+500
+ Additional distance for connect
8 0+000 - 0+420 U-ditch 1.0x1.2 434.912
Sawojajar (Right to Indraprasta drain

2+650
0+450 9 Side) 0+420 - 0+821.771 U-ditch 1.2x1.0 391.771 Secondary drain
10 0+821.771 - 0+868.262 Box Culvert 1.2x1.2 48.516 Secondary drain
+ Additional distance for connect

0+400
11 Sawojajar (Left 0+000 - 0+420 U-ditch 1.2x1.3 429.512

2+700
to Indraprasta drain
Side)
Starting Point 12 0+420 - 0+821.771 U-ditch 1.2x1.3 391.771 Secondary drain
0+350 13 Sawojajar 0+821.771 Box Culvert 1.2x1.2 19.700 Crossing Road
2+750

0+300

2+800
0+250

2+850
0+200

0+150
2+900
Discharge Point
Box Culvert
0+100

2+950
0+050

11,43
3+000

0+000
3+050
Discharge Point
Box Culvert

3+100
3+150
3+200
3+250
0+050
STA

0+025
STA

0+000
STA

3+300
3+350
9233418.324
418376.528 for Y=

=
0.8x0.8m
Point

3+370
Starting
U-Ditch

an
3+400
JL.
INDRAPRASTA

3+425
9233402.261

uh
SOUTH
418366.194 Y=

=
0.8x0.8m

3+450
for

(ROW
U-Ditch Point
Starting

35)

3+475
0+2500+255 x= 9233379.810
y= 418682.178

0+225

3+500

ab
y X
0+200

= =
9233333.859

U-Ditch
418683.756
3+525

Starting
25)
0+175
(ROW

0.6x0.6m
Point
MAESPATI
0+150 JL.

3+550

for

Pel
0+125

3+575
0+100

3+600
0+075 14,2

5,41
0+050
25,35

3+625
31,04
0+025
x= 418565.823

3+650

y
y= 9233249.729 0+000

lan
X
=
9233315.232 for

U-Ditch
418667.081

Starting
3+675
O

0.6x0.6m
Point
3+700
3+725

Ja
418171.467
9233152.325 for
1.0x1.0m
Y==
X
Point
U-Ditch

3+750
Starting

3+775
3+800
9233135.968
1.0x1.0m
418160.944for Y=
U-Ditch
X= Point

3+825
Starting
0+230

Sem

0+200

3+850
25)

0+175 (ROW

3+875
arang
0+150 DWUROWATI
JL.

3+900
0+125

3+925
0+100
0+075

3+950
0+050

Y=
X=
U-Ditch
9232998.576
3+975

418383.614

Starting
0+025

0.6x0.6m
Point
0+000

4+000

for
1
Drain
9232989.434
418386.257
Drainage X=
Y=

3,73

8,77
Main
to
Discharge

ndal

0+025
STA
UTH (R
U

Ke
1 ha

0 100 250 500 1000 m

Project
Location

STA SO
NOTE
Secondary Drain

RAPRA
Tertiary Drain
Box Culvert
Water Flow

JL. IND
3+425
note:
5.0 Road, Sewer & Drainage based on adjustment
construction level by Planning Team on date
4.0 26 October 2022
TOP LEVEL ROAD
5 Cm 5m 3.0 (CENTER) +2.750
+2.009
(Based on Actual Level) SHOP DRAWING
4 4 2.0 SURCHARGE
3+400

Drainage Right U-Ditch 1.0x1.2m PROYEK


Project
3 3 1.0 i = 0.29%
THE PROPOSED CONSTRUCTION
Drainage Left U-Ditch 1.2x1.3m
2 2 0.0 i = 0.15% AND COMPLETION
IL.+0.755 OF INFRASTRUCTURE WORKS
JL INDRAPASTA SOUTH, JL
1 1 -1.0 DWUROWATI AND JL MAESPATI
IL.+0.686 AT KENDAL INDUSTRIAL PARK
5 Cm 4 3 2 1 -2.0
0 [CT-85/KIK/MP5.3/NFRA/IDRS.E/2022]
50 m 40 30 20 10
3+370

Scale Horizontal = 1 : 1000 -3.0


Scale Vertical = 1 : 100
EMPLOYER :
-4.0
KENDAL PT. KAWASAN INDUSTRI KENDAL
REFERENCE LEVEL : -5.00 (m) INDUSTRIAL Jl. Raya Arteri KM.19 Kel. Brangsong, Kec. Brangsong
PARK Kab. Kendal 51371, Jawa Tengah, Indonesia
0+050
3+350

STATION NUMBER RECEIVED


0+000
ACCORDING TO REFF. DRAWING
Left

EXISTING
DISTANCE (m) Right
50.000

1.044 0.794 2.750 2.050 50.000


2.009 1.309 0.000
CHAINAGE (CL) (m)
MANGATAS KPT SAGALA

GROUND LEVEL (Surcharge) (m)


KONTRAKTOR
Penyedia Jasa

TOP LEVEL ROAD (m)

CONST.

0.766 0.719

0.824 0.735
DRAINAGE LEFT (IL) (m)
GENERAL CONTRACTORS
3+300

STA 0+000

STA 0+050
STA 0+025

DRAINAGE RIGHT (IL) (m)


Drawn By Checked By Approved By

Zaky Riza M Danny Kelana G., ST. Decky Eko A., ST.

REFERENCE DRAWING
No Code Description

1 KIP-MP5.3-INF-CT.85-LS.D-13a LONG SECTION OF DRAINAGE


JL. JODIPATI STA.0+000-0+050

KETERANGAN GAMBAR
Drawing Description

LONG SECTION OF DRAINAGE JL.JODIPATI


STA.0+000-0+050

SKALA :
1:1500
DWG NO.
KADII-SD-KIP-MP5.3-INF-CT.85-LS.D-9A
KETERANGAN
Legend

JAVA SEA

KENDAL
PORT

0+855.5

0+868.262

0+850
0+800

0+750
0+700

0+350
0+650

0+316.063
2+542.624

0+300
0+600

2+550
2+563.277

0+250
0+550

2+600

0+215.274
0+205.954
0+500
2+650
0+450

0+400

2+700
0+350

2+750
0+300

2+800

0+250

0+200

2+850
0+150

2+900
0+100

2+950
0+050

3+000

0+000
STA 0+050

STA 0+000

3+050
3+100
3+150
3+200
3+250
0+050
STA

0+025
STA

0+000
STA
3+300

5.0

3+350
H

3+370

an
3+400
3+425

uh
3+450
H

0+255
0+250

3+475

ab
0+225 3+500
0+200

3+525
0+175
25)
(ROW

MAESPATI
JL.

3+550
0+150

Pel
0+125

3+575
0+100

0+075

3+600
JL.
0+050

INDRAPRASTA

3+625
0+025

SOUTH

lan
3+650
0+000

(ROW
35)

3+675
3+700
H

Ja
3+725
3+750

3+775
3+800
3+825
0+230

Sem

H
0+200

3+850
25)
(ROW
0+175

3+875
arang
DWUROWATI
JL.
0+150

3+900
0+125

H
0+100

3+925
0+075

3+950
0+050

3+975
0+025

0+000 4+000

ndal
U

Ke
4.0
1 ha

0 100 250 500 1000 m

TJ.01 Project
3.0 +2.009 TOP LEVEL ROAD GV13
5 Cm 5m GV14 +2.750 Location
(Based on (CENTER)
4 4 2.0 Actual Level)
i = 0.636% Water Pipe Right NOTE
HDPE Pipe Ø250 mm
Gate Valve VO = Water Flow
A 3 3 1.0 i = 0.128%
Water Pipe Left H = Hydrant
0.0 HDPE Pipe Ø250 mm
2 2 = Gate Valve

-1.0 Joint from Jl. Indraprasta South note:


1 1
Road, Sewer & Drainage based on adjustment
5 Cm 4 3 2 1 Joint from Jl. Indraprasta South construction level by Planning Team on date
-2.0
Extension
B 50 m 40 30 20
Scale Horizontal = 1 : 1000
10 0

-3.0
26 October 2022

Scale Vertical = 1 : 100


-4.0
SHOP DRAWING
REFERENCE LEVEL : -5.00 (m)
PROYEK
0+050 Project
STATION NUMBER
0+000 THE PROPOSED CONSTRUCTION
TJ.02 AND COMPLETION

EXISTING
DISTANCE (m) 17.722 50.000 OF INFRASTRUCTURE WORKS
JL INDRAPASTA SOUTH, JL
DWUROWATI AND JL MAESPATI

1.514 1.514 2.750 2.050 50.000


1.883 1.501 2.009 1.309 0.000
CHAINAGE (m) AT KENDAL INDUSTRIAL PARK
[CT-85/KIK/MP5.3/NFRA/IDRS.E/2022]

GROUND LEVEL (Surcharge) (m)

H
EMPLOYER :
TOP LEVEL ROAD (m)

CONST.
KENDAL PT. KAWASAN INDUSTRI KENDAL
INDUSTRIAL Jl. Raya Arteri KM.19 Kel. Brangsong, Kec. Brangsong
PARK
WATER LEFT (TOP) (m) Kab. Kendal 51371, Jawa Tengah, Indonesia

RECEIVED
ACCORDING TO REFF. DRAWING
WATER RIGHT (TOP) (m)

MANGATAS KPT SAGALA

KONTRAKTOR
Penyedia Jasa

TITIK KOORDINAT GENERAL CONTRACTORS

A 418775.4581, 9233537.9863
Drawn By Checked By Approved By

B 418763.5345, 9233519.4517
Zaky Riza M Danny Kelana G., ST. Decky Eko A., ST.

REFERENCE DRAWING
No Code Description

KETERANGAN GAMBAR
Drawing Description

LONG SECTION OF WATER R. JL. JODIPATI


STA.0+000-0+050

SKALA :
1:1500
DWG NO.
KADII-SD-KIP-MP5.3-INF-CT.85-LS.W-13A
KETERANGAN
Legend

JAVA SEA

KENDAL
PORT

0+855.5

0+868.262

0+850
0+800

0+750
0+700

0+350
0+650

0+316.063
2+542.624

0+300
0+600

2+550
2+563.277

0+250
0+550

2+600

0+215.274
0+205.954
0+500
2+650
0+450

0+400

2+700
0+350

2+750
0+300

2+800

0+250

0+200

2+850
0+150

2+900
0+100

2+950
0+050

3+000

0+000
3+050
3+100
3+150
3+200
3+250
0+050
STA

0+025
STA

0+000
STA
3+300

3+350
H

3+370

an
3+400
3+425

uh
3+450
H

0+255
0+250

3+475

ab
0+225 3+500
0+200

3+525
0+175
25)
(ROW

MAESPATI
JL.

3+550
0+150

Pel
0+125

3+575
0+100

0+075

3+600
JL.
0+050

INDRAPRASTA

3+625
0+025

SOUTH

lan
3+650
0+000

(ROW
35)

3+675
3+700
H

Ja
3+725
3+750

3+775
3+800
3+825
0+230

Sem

H
0+200

3+850
25)
(ROW
0+175

3+875
arang
DWUROWATI
JL.
0+150

3+900
0+125

H
0+100

3+925
0+075

3+950
0+050

3+975
0+025

0+000 4+000

ndal
U

Ke
1 ha

0 100 250 500 1000 m

Project
Location
3+525 3+550 3+575 3+600 3+625 3+650 3+675 3+700 3+725 3+750 3+775 3+800 3+825 3+850 3+875 3+900 3+925 3+950 3+975 4+000
NOTE
= Water Flow
JL. INDRAPRASTA SOUTH (ROW 35) H = Hydrant
= Gate Valve

0+000
note:
Road, Sewer & Drainage based on adjustment

0+000
H H H
construction level by Planning Team on date
26 October 2022

0+025

0+025
SHOP DRAWING
Gate Valve VO PROYEK
Project

0+050

0+050
THE PROPOSED CONSTRUCTION
AND COMPLETION

H
OF INFRASTRUCTURE WORKS
JL INDRAPASTA SOUTH, JL
DWUROWATI AND JL MAESPATI

0+075

0+075
AT KENDAL INDUSTRIAL PARK
[CT-85/KIK/MP5.3/NFRA/IDRS.E/2022]

EMPLOYER :
0+100

0+100
KENDAL PT. KAWASAN INDUSTRI KENDAL
INDUSTRIAL Jl. Raya Arteri KM.19 Kel. Brangsong, Kec. Brangsong
PARK Kab. Kendal 51371, Jawa Tengah, Indonesia

RECEIVED
5.0 ACCORDING TO REFF. DRAWING

4.0 Hydrant 3 Hydrant 4


+3.200 TOP LEVEL ROAD (MIDDLE) GV4
5 Cm 5m 3.0 GV3 +2.940
SURCHARGE
MANGATAS KPT SAGALA
4 4 2.0 i = 0.39%
Water Pipe Right i = 0.000% Water Pipe Right HDPE Pipe Ø200 mm
3 3 1.0 To Jl. Dwurowati KONTRAKTOR
To Jl. Maespati From Jl. Maespati HDPE Pipe Ø200 mm Penyedia Jasa

IL.+1.740 IL.+1.740 IL.+2.000


2 2 0.0

1 1 -1.0
GENERAL CONTRACTORS
5 Cm 4 3 2 1 -2.0
50 m 40 30 20 10 0

Scale Horizontal = 1 : 1000 -3.0 Drawn By Checked By Approved By


Scale Vertical = 1 : 100
-4.0

REFERENCE LEVEL : -5.00 (m)


3+708.586 3+700 3+760 3+800 3+900 4+000 Zaky Riza M Danny Kelana G., ST. Decky Eko A., ST.
STATION NUMBER 4+010
3+650 3+710 3+750 3+775 3+850 3+950 4+005.217 REFERENCE DRAWING

5.217
EXISTING

No Code Description
DISTANCE (m) 50.000 50.000 50.000 50.000 50.000 50.000 50.000 50.000
2.940 2.240 1107.38

2.940 2.240 1157.38

3.148 2.447 1207.38

3.200 2.500 1257.38

3.200 2.500 1307.38

3.200 2.500 1357.38

3.200 2.500 1407.38

3.200 2.500 1457.38


3.200 2.500 1462.59
CHAINAGE (m)
2.940 2.240

3.200 2.500

3.200 2.500

KETERANGAN GAMBAR
GROUND LEVEL (Surcharge) (m) Drawing Description

TOP LEVEL ROAD (m) LONG SECTION OF WATER R. JL.


INDRAPRASTA STA.3+550-4+000
CONST.

WATER LEFT (TOP) (m)


SKALA :
2.000
2.000

2.000

2.000

2.000
1.740

1.740

1.766

1.870

1.919
1.935
1.896

WATER RIGHT (TOP) (m) 1:1500


DWG NO.
KADII-SD-KIP-MP5.3-INF-CT.85-LS.W-15
KETERANGAN
Legend

JAVA SEA

KENDAL
PORT

0+855.5

0+868.262

0+850
0+800

0+750
0+700

0+350
0+650

0+316.063
2+542.624

0+300
0+600

2+550
2+563.277

0+250
0+550

2+600

0+215.274
0+205.954
0+500
2+650
0+450

0+400

2+700
0+350

2+750
0+300

2+800

0+250

0+200

2+850
0+150

2+900
0+100

2+950
0+050
Sewer Pipe Dimension Length Number of
No Road Name Side
(m) (m) Manhole

3+000

0+000
HDPE Ø400mm #######
1 Indraprasta South Right 12
HDPE Ø350mm #######
HDPE Ø300mm #######
Right

3+050
9
2 Southern Parcel HDPE Ø250mm #######
186/187 Road
Left HDPE Ø250mm #######

3+100
3+150
3+200
3+250
0+050
STA

0+025
STA

0+000
STA
MHR.JP.01

MHR.JP.01a
3+300

Existing
MHR.IDRS.16

SPS
3

3+350
3+370
MHR.IDRS.17

an
3+400
MHR.IDRS.18

3+425

uh
3+450
MHR.MSPT.05

0+255
0+250

MHR.IDRS.19

3+475
MHR.MSPT.04

6.00
MHL.MSPT.05

ab
0+225 3+500
0+200

MHR.IDRS.20

3+525
0+175
25)
MHL.MSPT.04 MHR.MSPT.03
(ROW

MAESPATI
JL.

3+550
0+150

Pel
MHR.MSPT.02
0+125
MHL.MSPT.03

MHR.IDRS.21

3+575
0+100
MHR.MSPT.01

0+075
MHL.MSPT.02

3+600
JL.
0+050

INDRAPRASTA

3+625
MHL.MSPT.01
0+025

SOUTH

lan
MHR.IDRS.22

3+650
0+000

(ROW
35)

3+675
MHR.IDRS.23

3+700

Ja
3+725
MHR.IDRS.24
3+750

3+775
MHR.DWTI.05

MHR.IDRS.25

3+800
3+825
0+230 MHR.DWTI.04

Sem

6.00
MHL.DWTI.05

MHR.IDRS.26
0+200

3+850
25)
(ROW
MHR.DWTI.03
MHL.DWTI.04 0+175

3+875
arang
DWUROWATI
JL.
0+150

MHR.IDRS.27

3+900
0+125
MHL.DWTI.03 MHR.DWTI.02

0+100

3+925
MHR.DWTI.01

0+075

1.4
MHL.DWTI.02

3+950
0+050

3+975
MHL.DWTI.01 0+025

0+000 4+000
Point SPS 2

Y
A 418369.0661 9233036.1049
B 418369.4684 9233033.132

ndal
C 418365.5045 9233032.5956
D 418365.1023 9233035.5685

Ke
1 ha

0 100 250 500 1000 m

Project
Location

NOTE

= Manhole

note:
5.0 Road, Sewer & Drainage based on adjustment
IL. -0.570 construction level by Planning Team on date
(02 FEB 2023) 4.0
26 October 2022

IL. -0.450 +2.009 TOP LEVEL ROAD


5 Cm 5m 3.0 +2.750
(02 FEB 2023) (Based on (CENTER)
IL. -0.300 2.0
Actual Level) SHOP DRAWING
4 4
(02 FEB 2023) PROYEK
STA 0+025
STA 0+050

STA 0+000
Project
3 3 1.0
HDPE Pipe Right Ø300 mm THE PROPOSED CONSTRUCTION
2 2 0.0 i = 0.30% AND COMPLETION
OF INFRASTRUCTURE WORKS

3+300
-1.0 JL INDRAPASTA SOUTH, JL
1 1 HDPE Pipe Right Ø400 mm DWUROWATI AND JL MAESPATI
i = 0.20% AT KENDAL INDUSTRIAL PARK
5 Cm 4 3 2 1 -2.0
0 [CT-85/KIK/MP5.3/NFRA/IDRS.E/2022]

SPS 3 (EXISTING)
50 m 40 30 20 10
Scale Horizontal = 1 : 1000 -3.0

MHR.JP.01a

MHR.JP.01
Scale Vertical = 1 : 100
-4.0 EMPLOYER :

REFERENCE LEVEL : -5.00 (m) KENDAL PT. KAWASAN INDUSTRI KENDAL


INDUSTRIAL Jl. Raya Arteri KM.19 Kel. Brangsong, Kec. Brangsong
PARK
MHR.JP.01a
Kab. Kendal 51371, Jawa Tengah, Indonesia
0+050
MHR.JP.01
Existing

STATION NUMBER
0+000 RECEIVED
ACCORDING TO REFF. DRAWING

EXISTING
3+350 DISTANCE (m) 17.722 50.000

2.750 2.050 50.000


2.009 1.309 0.000
CHAINAGE (m)
SP

MANGATAS KPT SAGALA


S3

GROUND LEVEL (Surcharge) (m)


MHR.IDRS

KONTRAKTOR
Penyedia Jasa
3+370

TOP LEVEL ROAD (CL) (m)

CONST.
SEWERAGE LEFT (IL) (m)
.16

GENERAL CONTRACTORS

-0.570
-0.450

-0.300

-0.284
IL. -0.410 SEWERAGE RIGHT (IL) (m)
(02 FEB 2023) Approved By
Drawn By Checked By
3+400

Manhole Coordinate Zaky Riza M Danny Kelana G., ST. Decky Eko A., ST.

REFERENCE DRAWING
MHR.JP.01a 418796.217, 9233525.441
No Code Description

418774.791, 9233539.225 KIP-MP5.3-INF-CT.85-LS.Sw-21a LONG SECTION OF SEWER


MHR.JP.01
JL. JODIPATI 0+000-0+250

KETERANGAN GAMBAR
Drawing Description

LONG SECTION OF SEWER JL. JODIPATI


STA.0+000-0+050

SKALA :
1:1500
DWG NO.
KADII-SD-KIP-MP5.3-INF-CT.85-LS.Sw-17a
KETERANGAN
Legend

JAVA SEA

KENDAL
PORT

0+855.5

0+868.262

0+850
ODP (Out Door Panel)
Indraprasta South
0+800

(by UP)

0+750
0+700

0+350
0+650

0+316.063
2+542.624

0+300
0+600

2+550
2+563.277

0+250
0+550

2+600

0+215.274
0+205.954
0+500
2+650
0+450

0+400

2+700
0+350

2+750
0+300

2+800

Main Distribution Panel


0+250

0+200

2+850
0+150

2+900
0+100

2+950
0+050

3+000

0+000
3+050
3+100
3+150
OG Box (Ongoing Box)

3+200
3+250
0+050

0+025
STA

STA
7

5
0+000
STA
6

SL.L.01 3+300
8

3+350
3+370
SL1

an
3+400
SL2

3+425

uh
SL3

3+450
SM7
0+255
0+250

SL4

3+475
4
SM6

ab
0+225 3+500
SM5

SL5
0+200 25)

3+525
0+175
(ROW

SM4
MAESPATI
JL.

SL6

3+550
4
0+150

SM3

Pel
0+125

3+575
0+100

SM2

SL7
0+075

SL8

3+600
SM1

JL.
0+050

INDRAPRASTA

3+625
0+025

SOUTH

lan
3+650
0+000

(ROW
35)

3+675
OGB

SL9

3+700

Ja
SL10

3+725
3+750

SL11

3+775
SD7

SL12

3+800
4
SD6

SL13

3+825
0+230

Sem 0+200 SD5

3+850
25)
(ROW

SL14
0+175

SD4

3+875
arang
DWUROWATI
JL.
0+150

SD3
4

SL15

3+900
0+125

0+100 SD2

3+925
SL16

0+075

SD1

3+950
0+050

SL17

3+975
0+025

0+000 4+000

ndal
U

Ke
1 ha

0 100 250 500 1000 m

Project
Location

3+250
5.0 NOTE

4.0 Underground Cable


NYFGbY
3.0 +2.009 TOP LEVEL ROAD
(CENTER) +2.750
5 Cm 5m
(Based on Main Cable Sparing
2.0 Actual Level) PVC AW 6x6" (High Impact) Left

STA 0+025
4 4
PVC AW 6x6" (High Impact) Right

3 3 1.0
STA 0+050

STA 0+000
5 2 2 0.0

3+300
7 1 1 -1.0
SHOP DRAWING
5 Cm 4 3 2 1 -2.0
6 50 m 40 30 20 10 0
PROYEK
Project

Scale Horizontal = 1 : 1000 -3.0 THE PROPOSED CONSTRUCTION


Scale Vertical = 1 : 100
AND COMPLETION
-4.0 OF INFRASTRUCTURE WORKS

SL.L.01
JL INDRAPASTA SOUTH, JL
REFERENCE LEVEL : -5.00 (m) DWUROWATI AND JL MAESPATI
AT KENDAL INDUSTRIAL PARK

3+350
0+050
STATION NUMBER [CT-85/KIK/MP5.3/NFRA/IDRS.E/2022]
SL.L.01 0+000
Left

EXISTING
DISTANCE (m) 50.000
8
3+370
Right EMPLOYER :

2.750 2.050 50.000


2.009 1.309 0.000
CHAINAGE (CL) (m) KENDAL PT. KAWASAN INDUSTRI KENDAL
INDUSTRIAL Jl. Raya Arteri KM.19 Kel. Brangsong, Kec. Brangsong
PARK Kab. Kendal 51371, Jawa Tengah, Indonesia
SL1

GROUND LEVEL (Surcharge) (m) RECEIVED


ACCORDING TO REFF. DRAWING
3+400

TOP LEVEL ROAD (m)

CONST.
STREET LIGHT DISTANCE (m) 2.143 2.857
SL2

3+425

MANGATAS KPT SAGALA

1.409

2.150
STREET LIGHT CABLE LEVEL (m)
KONTRAKTOR
Penyedia Jasa
3+450

GENERAL CONTRACTORS

Flow No From To Cable Type (mm2)


Main Cable Sparing Drawn By Checked By Approved By
5 (Jl Indraprasta South) SPS 3 Panel NYFGbY 4x95

6 SPS 3 Panel SPS 3 Pump NYYHY 4x25

7 OGB Indraprasta South Street Light Jl. Jodipati (Right) NYFGbY 4x10

8 OGB Indraprasta South Street Light Jl. Jodipati (Left) NYFGbY 4x10
Zaky Riza M Danny Kelana G., ST. Decky Eko A., ST.

REFERENCE DRAWING
Jl. Jodipati No Code Description

1 KIP-MP5.3-INF-CT.85-LS.SI-25a LONG SEC. OF ST. LIGHT JL. JODIPATI


Street STA.0+000 - 0+050
Light Coordinate

SL.L.01 418775.935, 9233514.113


KETERANGAN GAMBAR
Drawing Description

LONG SEC. OF ST. LIGHT JL. JODIPATI


STA.0+000-0+050

SKALA :
1:1500
DWG NO.
KADII-SD-KIP-MP5.3-INF-CT.85-LS.SI-21a