You are on page 1of 14
SIEMEN S Commissioning Check List E Handling Restricted CL-£06.5 Electrical Motors (DC) PK1022 System: Lube oil system KKS/ Description: 11MAV24AP001 / EMERGENCY LUB-OIL-PP Page: 1of3 Appendices: [ no. Activity (Items not applicable to be marked N/A) Remarks | Confirmed j 1 | Technical Data | Feeder Location: 1 18UC02,.NAOOt | Rating plate details: Power: 12.5 kW Voltage: 220v(00) Current: 754, Speed: 2900 min* Dubraviko Pol Field Voltage: 220V(00) Field Current! 1.534 ‘ek |__ Serial Number: 92020 Cable No: Power Cable to motor: ‘4Bucto01 Power Cable to series resistor. 1801002, | Control cable: 44BUC4100 2 Visual checks - 7 correct labeling of device and cable g Satisfactory access to device g devices and cables are undamaged a Dubravico correct cable terminations a Polak correct sealing of cable erties in terminal boxes and switchgear correspondence between rating plate data and drawing data, g Correct protective and grounding connections g Continuity check protective conductor ~ Measured resistance value for loop “+ to PE": 0.1 Ohm Dubravko Polak Measured value appropriate a (Compare with calculated value) 4. | Motor insulation test : — DC Test Voltage: 500 Dubravko 1 Field winding: >999 MOhm Poljak 2. mature winding: ~999 ohn | ‘Yarentlrpedcion, euro andor edge Gamat a wale ean its caren ar conmaneaton testo wiht san mses in an eat Title: CL-E06.5 Electrical Motors (Dc) Page: 2 0f3 KS: 11MAV24APO01 i - = ~ : 1 { Activity Remarks | Confirmed Electrical function tests “} 4. DC control a 2. Fault signal from plug-in unt a ‘3. OnVOff switching manualiy/rom local control oO wa | Dupravko 4. ECO relay (correct function of pressure switch) a \ 5. Extemal commands (ie. pressure switch) a 6. Winding resistance test — ~ 1. Field winding: 100. Ohm, Dubravko Polak 2. Armature winding: 0.7 Ohm 7 | Adjustment of Resistors ~ 7.4] — Armature series resistor “_|1._ Acsoxding to manufacturers instruction, the esate shal be adusted to R21=0490, R22=0.02.0 , Dubravko 2. Actual adjustment of resistors) Polak R21=0.48.Q, R22=0.023.0 ‘Note: in case the values are different, add an appropriate explanation under 72. | _ Fleld resistor Gf appicable) 1. According to manufacturers instruction, the resistor shall be adjusted to. vy Dubravko 2. Actual adjustment of resistor. “ NA Polak Note: In case the values are different, add an appropriate explanation under “Remarks”, 8. | Timer for switching out Stari Up Resistor‘) if applicable) Time Delay 4 (sei)=0.4 8 Time Delay 2 (set}= © s Dubravko ‘Time Delay 1(measured)=420 ms Polak Time Delay 2(measured)= © ms “arent rpodicion deaeinaion rd ing Fs doe ws wales cai niant Gia Evers lis cnn an conmeaon beret ane wake anes adheres ae poten Title: CL-E06.5 Electrical Motors (DC) KKS: 1{MAV24AP001 age: 3of 3 Activity Remarks | Confirmed ‘Settings overcurrentioverioad protection equipment power circuit 1. Overcurrent protection equipment (1. -Q1) power circuit, ‘Type of equipment: Siemens, 3NAS 140 Overcurrent setting: b 2008, High-set overcurrent setting> [>> (if applicable) 2. Overload protection equipment (.. -F4) power circuit ‘Type of equipment: ‘ABB, TA 200DU-110 Overtoad setting: 750 Gf applicable) Overload function: ‘riplalacm 3. Overcurrent/overioad protection equipment (ie. -F11) control circuit Type of equipment: ‘Siemens, 5SY5203-7 Overcurrent setting m3 NA Dubravko. Poljak 10. Rotation / Direction test according to mechanical requirement / Current a Department: PG SO GP COMM ELEC Name: Dubravko Poljak Date: 04.04.2022. Signature: (2 1 Carried out with driven machine Z 2. Carried out without driven machine o 3. Direction ( view from driven machine to motor ) clockwise a counterclockwise a Measurement of current Dupravko Poijsk 1 Start-up current armature circuit) 249.9 2. ‘Load current (with driven machine, armature circuit), » 62A 3. Current field circuit (with driven machine)...... 18A Remarks: ~ {Commissioning mmissioning ‘ager Tesi recat, dengan ale erga te casero wal even fitscomertandcarmunceten tet oer iis eres aohacamn et peboe CL-E03.2 Discharging of Batteries ‘Commissioning Checklist E System: ST -Baleryth2 Component: 118TAZ0 __ em BTA Page: 3 of 3 No. Activity Remarks | Confirmed {items not applicable to be marked N/A) Remarks: Department: PG SO GP COMM ELEC Date: 17.01.2022. ‘Name: Dubravko Poljak Signature: (/—~ SIEM ENS Commissioning Procedure No. of Pages (cP-E07) toa UNID: AL:N ECCN:EAR99 Handling: Restricted T |: 1263 NW Punjab Power Plant, Jhang P1022 |>Unit< 10920 _|seDC020 |>Reg.No Par a rondew [3 {oacom [oe [ream] Title Battery Included Systems: Bra, Rev. |Date Name Signature Department Released |M. Betzel signed Betzel [PG SO EMEA PE Verified | J. Stein signed Stein PG SO EMEA EN ETEC EE - 2018-08-23 Verified |P. Sieber signed Sieber [PG SoGP COMM Issued 'H. Knobloch signed Knobloch | PG SO GP PMO DTD. Released | Modifies Yocaniecaes Semcon cage me ers, 7 Project Ste Execution Siren Arg easy pte aguante aa ae ea “seems SIEM ENS Commissioning Procedure No. of Pages cP-E07 2of4 UNID: Handling: Restricted 1263 MW Punjab Power Plant, Jhang Pk1022__|>Unit<|10920 _| seDc030 |>Reg.No| Poe ope Ges |_| comrr | Bo Ren Activity 1D i 7 - i al ___Reference Docu A-CP-E07-01 | System Check | Ze A-CP-£07-01.1 Visual check - Verifying general cleanliness. check of manufactures documentation ~ correct labeling of devices and cable - satisfactory access to battery | devices and cables are undamaged Mi + correct cabling terminations (spacing) correct sealing of cable entries correct protective and grounding connections safety equipment for acid works available ‘Mechanical Chock = grounding connections. a-cp-cor.01. |" “able connections Mt ~ torque check of cell connectors = battery rack Tir edo ces ase a an dr eke taio pendn cianeaa eon Projet Ste Execton ters i ite oper soe Al rte undp pat srg ech eae o mages ane SIEMENS Commissioning Procedure No. of Pages cP-£07 30f4 UNID: Handling: Resticted [1263 MW Punjab Power Plant, Jang P1022 _|>Unit< |10820 | a=DCo30|>Reg.No| Po Pipecats [ut conns ca foce eae [Activity 1D [Activity ~ Reference Docu ‘A-CP-£07-02 | Electrical Commissioning | A-cP-£07-02.1 | Activate Battery Colle. MI Manufactt check appropriate air circulation Checklist = ensure that the battery charger is available Montes + filbattery wth electroiyte Checklist ~ start charging avaliable) = cary out checks during charging = charge until criteria for fully charged colls are achieved | = switch overto float charge = top up of electrolyte Tee aii, devoo rd rg Gent wonton ol aon ad conaaion PEI as Wal apom we Projet Sto be ‘tent alr ay of orogens Guana poem ah std otra ero SIEMENS Commissioning Procedure No. of Pages CP-E07 4of4 UNID: Handling: Resticted 1263 MW Punjab PowerPlant, Jang P1022 _| >Unit<| 10920 | &EDCO30|>Reg.Nol ara [rietosw —[ | conocam [a Activity ID | Activity iL | Reference “| Docu ‘A-CP-E07-02.2 Discharge / Capacity check MI CL-E03.2 - calculation of discharge current = set up discharge equipment = checks during discharging | = confirm rated capacity of battery = recharge battery - switch over to float charge Issue of Commissioning Clearance Certificates ccc Project Ste Execution Teer Seseinaen oe ig i oat wl ca ton Sr cormurcam paa Oaaa EST pO a maa, nts tea apart eanaps A fcr ty palo pos eeton ey noo sesprpaats eases Si E M E NS Commissioning Check List E 41263 MW Punjb Power Plant, Jnang _|PK1022 MW Punjb Power Plant, Jhang [PK Syster CL-E03.2 Discharging of Batteries 41UBA Component: 118TA10 Restricted REPEAT DISCHARGING OF BATTERIES NOTE: Applicable only, if no manufacturer checklist is available Page: 1 of 3 No. Activity Remarks | Confirmed {items not applicable to be marked N/A) Technical data from Manufacturer | Manufacture: HOPPECKE Type 15 OSP.HC 1275 No.ofcelis: 108, Reted voltage perce; 222 Total Rated voltage: 240 V Rated capacity: 130Ah Discharge period: toh Final discharge voltage: 218.0 Nominal temperature. 25°C 2 | Testdata ‘Ambient temp. a test begin 2c “Ambient temp. et end of test 20c Stat of test 8:00 AM End oftest 78:00PM 3. | Calculation of discharge currentFinal discharge voltage Discharge current = Rated capacity / Discharge period Discharge curent = 130A Final ischarge votage = Final discharge vltage per call x No.of cals Final discharge voltage = 218.9V 4. | Discharging ‘© Five pilot cals shallbe chosen and the numbers entered into the © SRBIRPSILRPGe curent (tem 9) and keep current constant 0 REELS SEER) tage continuously or at intervals dung the test. Note: the intervals shall be shortened towerds the final © GSRRBERS YBLBAer to record battery voltage and curent orif avalable, use application sofware of test device manufacturer NOTE: Start charging of battery immediately after completion of tests _ TRESS east aeeengtoy ea ng atts dearen mys ae Project Site Execution Gnerdareatas weir pone anaes Migeeeeet eT SHAMAL ‘Ronvotonat aust moter Selah an oe eee REPEAT DISCHARGING OF BATTERIES CL-E03.2 Discharging of Batteries Commissioning Checklist E System: 11UBA ‘Component: 18TA10 Page: 2 of 3 No. Activity Remarks | Confirmed {Wtems not applicable to be marked NA) Te | Curentis | Battery Votagev | TomperatuerC (Average) Density kot (Average) (ca 20] cat 40 [cat 60 cen 80 cert 00) ca'2q] ca 40] Cat 60] cateo foat0o| 09:00 | 130 240 24 | 25 | 23 | 26 | 25 1.23] 1.23]1.23/1.23 [1.23 09:30 | 130 238 25 | 25 | 24 | 27 | 26 [1.23] 1.23] 1.22 |1.22 [1.22 10:00 | 130 237 27 | 27 | 27 | 29 | 28 [1.22 /1.22[ 121/121 [1.21 10:30 | 130 235 30 | 31 | 34 | 32 | 33 | 1.22 [1.22] 121/121 [1.21 11:00 | 130 233 31 | 34 | 32 | 32 | 34 | 4.21 | 1.21 | 1.20]1.20 |1.20 11:30 | 130 231 32_| 32 {33 | 34 | 35 |1.201120| 119/119 {1.19 12:00 | 130 229 33 | 34 | 34 | 35 | 36 |1.20/1.20| 1.19|1.19 [4.19 12:30 | 130 227 34_| 33 | 35 | 34 | 35 [1.19] 1.19] 1.18 |1-18 [148 13:00 | 130 227 33 | 33 | 35 | 36 | 36 |1.19]1.19| 1.18/1.18 |1.18 13:30 | 130 226 32 | 34 | 35 | 36 | 35 [1.18] 4.18] 4.17 4.17 [4.47 14:00 | 130 226 32 | 35 | 36 | 37 | 37 [4.17] 4.17] 1.16 |1.16 [1.16 14:30 | 130 225 33 | 33 | 35 | 37 | 37 [4.17] 4.17] 4.16 /4.16 [1.46 15:00 | 130 224 33 [33 | 35 | 36 | 35 [1.16 /1.16|1.15)1.15 [1.15 15:30 | 130 228 33 | 32 [35 | 35 | 36 [1.15 [1.15]4.14]1.14 [1.14 16:00 | 130 222, 32] 31 | 35 | 35 | 36 [1.14] 114/423 /4.13 [1.13 16:30 | 130 221 32 | 33 | 37 | 36 | 36 [4.13 1.13] 4.12/1.12 }1.12 17:00 | 130 220 32 | 32 [35 | 35 | 36 [at2 [412] 44a |i [a1 17:30 | 130 219 33 [33 | 35 | 36 | 36 [att (asa [tat liar fat 18:00 | 130 218 3432 | 35 | 37 | a7 fast fast] tag iat [oat Project Site Execation ‘pil, eae Geena oe gare meneiaya ma Steet hdatipapt ena ats Mgrocwned by page ‘Scnvoonote uv nota etn ost (" stame) REPEAT DISCHARGING OF BATTERIES CL-£03.2 Discharging of Batteries ‘Commissioning Checklist E System: 11UBA Component: 118TA10 = Page: 3 of 3 No. Activity Remarks | Confirmed {ltems not applicable to be marked N/A) Remarks: - 8 Department: Electrical TFA Name: Sh andi Date: o12.qri.17 ‘Signature: we ws Battery test repeated 15.01.2022. CY 15.01.2022. Ta ics amr oe etn ces et om Project Ste Execution Sreser cla rnc arepa egceacy sang SIEMENS Commissioning check List E eenaes CL-E03.2 Discharging of Batteries 4263 MW Punjb Plant, Jhang_|PK1022 T {GING OF BATTERIES MW Punjb Power Plant, Jhang REPEAT DISCHARt ‘System: 11UBA Component: 1167A20 NOTE: Applicable only, if no manufacturer checklist is available Page: 1 of 3 No. Activity Remarks | Confirmed {Items not applicable to be marked N/A) 1. | “Technical data from Manufacturer ‘Manufacture: HOPPECKE Type: 15 OSP.HC 1275 No. ofcelis: 108 Rated voltage per cell: 2.22V Total Rated voltage: 240 V Rated capacity: 130,Ah Discharge period: toh Final discharge voltage 218.9, Nominal temperature: 25°C 2 | Testdata ‘Ambient temp. attest begin 20°C ‘Ambient temp. at end of test 28¢ ‘Start of test 8:00 AM End of test 18:00PM 3. | Calculation of discharge currentiFinal discharge voltage Discharge curent = Rated capacity / Discharge period Discharge curent = 120 A Final discharge voltage = Final discharge voltage per cel x No.of cells Final discharge vottage = 218 9V 4. | Discharging © Five plot cells shall be chosen and the numbers entered into the © FRGARPSILHAE curent (tem 3) and Keep current constant © ERE AEEAREA/Yotage continuousty or etintervals ‘during the test. Note: the intervals shall be shortened towards the final © GBFRBEYS YBLBRfer to record battery voltage and current orit ‘vaitable, use application software of test device manufacturer |__ NOTE: Start charging of battery immediately after completion of tests ‘Trani rerun assenratn ana ooagot i acon wa = aon Project Ste Execution Shonen ol soastace me pynnte Seape gee eae ‘SHAHAI REPEAT DISCHARGING OF BATTERIES CL-E03.2 Discharging of Batteries Commissioning Checklist E ‘System: 11UBA Component 118TA20 Page: 2 of 3 No. | Activity Remarks | Confirmed (Items not applicable to be marked N/A) Time | curenua | Battery Votagav | Temperature’C (Average) Density (Average) ©2120] c2t 40 |cat'60 | ca 60] catt00] cat 20] cat 40] Ca 60] car00 [oan] 09:00 | 130 240 22 | 23 | 21 | 24 | 23 |1.22[1.23] 1.23/1.23 [1.23 09:30 | 130 238 23 | 23 | 22 | 25 | 24 |1.22[1.23|1.22/1.22 [1.22 10:00 | 130 237 25 | 25 | 25 | 27 | 26 |1.22[1.22[ 1.22/12 [1.21 10:30 | 130 235 28 | 20 | 29 | 30 | 34 |1.22[1.22/ 1.21] 1.21 [1.21 14:00 | 130 233 29 | 20 | 30 | 30 | 32 | 4.21] 1.21] 1.20|1.19 |1.20 {41:30} 130 | 231 | 30 | 30 | 31 | 32 | 33 [4.24 /4.20/ 440/149 14.49 12:00 | 130 229 31 | 32_| 32 | 33 | 34 |1.20/ 1.20] 4.19/1.19 [1.19 12:30 | 130 227 32 | 31 | 33 | 32 | 33 |1.19[1.19] 1.18/1.18 [1.18 13:00 | 130 227 31 | 31 | 33 | 34 | 34 |4.10] 4-19] 4.18 /1.18 [4.18 13:30 | 130 226 30 | 32 | 33 | 34 | 33 [1.18] 4.18] 4.17/1.47 [1.17 14:00 | 130 226 30 | 33 | 34 | 35 | 35 [1.18] 1.17] 1.16]1.16 [1.16 14:30 | 130 225 3431] 33| 95 | 35 [4.17] 1.17] 1.15]1.15 [1.16 15:00 | 130 224 31 [31 | 33 | 34 | 33 [4.46] 1.46] 1.15]1.15 [1.46 15:30 | 130 223 31 | 30 | 33 [33 [34 |1.15] 4.16] 444|1.45 [7.14 16:00 | 130 222 30 | 29 | 33 | 33 | 34 [4.13] 1.14] 4.13/1.14 [1.13 16:30 | 130 224 30 | 31 | 35 | 34 | 34 [4.13] 4.13] 442/412 [112 17:00] 130 220 30 | 30 | 33 | 33 | 34 [at2]ta2]aat|ia2 [441 17:30] 130 219 31 | 31 | 33 | 34 | 34 [att [tat [4a |at2 [112 18:00 | 130 218 32} 30 | 33 | 35 | 35 [att [tat] ai [ita [ata Ta eaten eer eng eee wal ne, Project Ste Execution Seerwwiaciaetwnendanea nivucenieecugee (Sie) REPEAT DISCHARGING OF BATTERIES CL-E£03.2 Discharging of Batteries Commissioning Checklist E ‘System: 11UBA ‘Component: 118TA20 Page: 3 of 3 Activity Remarks | Confirmed {Items not applicable to be marked N/A) Department: Electrical TFA Date: 2019.4pri.17 ~_Batiry Wet repeated 1707-2022. eT Frrenyy cond 17.01.2022. Tai again caer ee wg fe ecretes cies oni Project Ste Executon pr evi re wind egress norco a ies ‘Romer ty most han cyte orm eens aca gene ‘or design pate *

You might also like