You are on page 1of 5
eee ee | ( User's Guide Compact Chamber cco4 P-co0t-s10-001 02 OO Dosimetry SOOKE KEKE EEK HEHEHE KKK HHH HHH KKH Notice “Tis Users Gui ie anntegrl pat ofthe Compact Chamber COOs ae a measuring device and shou slay bs hoot at hand. Onservancs ofthe User's Guide incense raed {ororoperperarmance and cowes operation the Compact Caamber CCo4. The Carnac {Ghambor CCD ands accessories mst net be Used foray char purpose than doeerbes 1 acconparyg documentation (evened use) Vlaion wi esl nos of waranty. {BA Dosimety AB and IBA Dosimetry GmbH do net ace kablly fr jury to personne oF ‘damage fo cavemen hat may ros rom misiao ol his equipment, alot obser the Fazard notes cotained rts User's Guia, ofl to cosowe cal heath and safely ‘equations. {BA Dosimoty AB and BA Dosimetry GmbH shal undor no circumstances be lable for Inetdortal or coredental damage ang rom use oho oqupent describe ns Socument Nop of the accompanying documentation may be randaed or rproduced witout writen pamiceion ofA Dosimetry, unless reproduction is cai out or Pe sole purpese to be {sed by several people nthe came department “The ueor must reat the assompanying documentation ike any ote ecpyrighted mater Espocaly par olche accompanying documentaion provided electron orm hese figs sral tot be moda In anyway. A Dosim and ta supplrs rela be and al ‘ownership gts to he accompanying documentation (ether n secrnic opted orm), Last update ofthe Use’ Guide: 2008-05-27, IBA Dosimetry GmbH IBA Docimetry AB Bahnholsares § ‘Swandbedzatan 1 DesoGee Sehwarzenbruck «Seve 20 Upped Germany ‘Sweden Phone: +40 9128 607.0 Prone 48 18 1807 00, Fax +49 9128 607-10, Fax HS 15 2 7852 io dosimatysom (2008 Users Gute P-ccuesie-001 02 1 Directions for Use lonisation Chamber CCO4 High spatial resolution, emall volume chamber for relative absolute dose determination, depth dose measurements and field profile analysis inva waterphantom or in free-air for photon and electron beams. s []___ fe 1 Veal rough yateproat cove 3 Puy garded | MATERIALS, Electrometer connector peeeee wencan sven Ces girs Suge ies a Ee ert tensions a — com sear som sainvoe cotent geesnacy GL" Saat om sty Pm wiameiass 4m i ee a cunsettvetomace OS ‘ pooosiccn ce cot User ce AAARARRARARARAARARAARARAARAAAAAAAAAAARA eee eee HEHEHE HEHEHE HEHE E etorence point Wenout nuit cap 231mm from the data endo me chamber ible Orientation in ralation fats + Chamber axes perpendcuer to ceria ay 1 Mast cere! ay proumal o source (OPERATIONAL CHARACTERISTICS Plating votage £500 V (max+-500 V) Max leakage 22x10 Typ. takage 410 A Gur penta £200 V (maxci- 500 V) perature range +100. + arc Fe hui range 20%. 75% Poly sfectin "00 < 01% Senstvy sop10K 1.10 10°C / Gy Note: The calbraton factors andthe clan condton ae described on the ‘abraion corte Sebi: + Cangng poly of poariationvotage <4 min exposure Changing ambien temperature ima © APPLICATION RANGE Energy /Racintion quality + ea beams 60 kev - soMev fookw > som + Etectron bean: 10 Mev - soMev Measurement quantios 1+ Absored dose to water 1 Absomea dove rte to ator (c008 Users Guide P-oco8-s10.001 02 Accessories (1) Chamber hoger in waterphantom + Fortho determination of Oy a specte chamber hoider must be lized as indicated hemos olortoncetitate (C02 - WP). 4+ Forte anaise scans using the $-smensona canning waterphartom the apprcpiate chamber hotder must be vse. (2) Sale phantoms ——SP3_. PMMA plate phantom (20x 30em) P94. RW Spite phantom (20x30) SP22. PMMA cubic phantom (20x20 em) + Specie adore plates a chamber. alae rom the manutacure as appropri or onch (9) air measurements ‘Measurements er the datominaton ofa karma, Ks or tay beame lena above 682 keV must be made using he appropriate PMMA Co bul cap. CLEANING On wth apeife leaning agents autabie forthe ebove materials and taking th necessary care the outer electode s wry rage) Special remarks 1+ The chambers von snaive measung detector and shoul be stored I 8 dy aes room TBheeratre:Waneadbe pete tem mecha! an thal ress and corey meter. + Tegra ele petorance le usgein areas wih hgh howdy, he charber shoud bo had blo reaons he bap can. + Teeoiecendanazon te chamber shoud not be oposeaoexrema changes intemperate end Romy + Thee shoud nol be asd to tenprsues ave S02 {The chamber may bo nmowod water 0 ong as neosesary Bul Te @ fered not exceeding eybeng. tech, pes culid tha oma Use ol th chambet shouldbe ave, (Gate eos be taton ence hat shar tfc co wo coil ha ican soo. To Post he {anba tem water tw sss shalt nt be eset camoge k's tees, + Tha doze ahold not be wa ey ome nals ard te manacurrcosbe rst {ols pcg to open ena tha watoprootg see In ware prevent water fom camaghg {holon enanbar rd coonees + Roe akg curor has easod afer a pod of sioage in an envionment of ge tomgeraurspreccre stage, Ie neescaty toy Be hacer ay efes (eS rvs my at over 12 hous. + loss tse hs ctarear cry wth & dodmter nich meet IEC SOT rogiemens andi ‘tioned ih he ae chamber saracsonconetion ved by IA Deere ce ‘4 sccots10.001 02 ‘oc04 User® Guile

You might also like